Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-Finance 1ST FLOOR SIDHARTH TOWER BALTI KHARKHANA BYELNE S J ROAD ATHGAON GUWAHATI KAMRUP ASSAM 781001 | KAMRUP METRO | ASSAM | 781001 | L1 | Accepted-Finance OK | |
| 2 | L2₹1.6 L+₹9,000 (6.12%)Accepted-Finance 879 SHAHBAD BHOOR BAREILLY BHOOR BAREILLY BAREILLY BAREILLY UTTAR PRADESH 243001 | BAREILLY | UTTAR PRADESH | 243001 | L2 | Accepted-Finance OK | |
| 3 | L3₹1.6 L+₹11,300 (7.69%)Accepted-Finance 259 ANAND VIHAR COLONY NAWADA SEKHAN PILIBHIT BYPASS ROAD BAREILLY UTTAR PRADESH 243005 | BAREILLY | UTTAR PRADESH | 243005 | L3 | Accepted-Finance OK |
| Sl No | Description | Qty | Unit | M/S INDRA ENTERPRISES L2 | Bharat Trading Corporation L1 | M/S A R K ELECTRICALS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Rectification of SF-6 Gas leakage from poles of 145 KV SF-6 ABB make (Mfg.-2010, Sr. No. 15000459) Circuit Breaker of 132 KV Neri bay at 132 KV Sub-station, Shahabad. Work consist of:-
(a) To identify SF-6 Gas leakage with the help of SF-6 Gas leakage detector and pole non-operating problem.
(b) Dismantle identified pole form breaker structure by help of hydra.
(c) Dismantle all components of poles and replace all “O” ring / Gasket by applying Ana bond 661 (Gas Sale Out) after thorough cleaning of part.
(d) Replacement of pull rod for pole moving contact
(e) Re-assemble all parts of the pole
(f) Apply vacuum and keep it for 24 Hrs. and check no loss of vacuum.
(g) Erection of poles into structure using hydra.
(h) Fill SF-6 Gas upto specified value.
(i) Check satisfactory close/ trip operation both by local & remote. | 1 | no. | 60,000 ₹60,000 | 57,900 ₹57,900 Lowest | 60,500 ₹60,500 |
| 2.00 | Complete overhauling of 0.4 KV Air Circuit Breaker (CGL Make) with cleaning, lubrication and greasing all function parts adjustment of spring tension & spring charging, checking motor fixed and moving contacts finger, alignment of arcing and sliding contacts, cleaning arc chutes checking free movement of rack, testing of UN shunt trip coils and replacing it required, relay testing checking and rectification of all electrical circuits and final adjustment and alignment of breaker as per required to complete the job satisfactory including all labour and T&P at 132 KV below mentioned sub-station:-
(1) 132 KV Sub-station, Hardoi (02 Nos.)
(2) 132 KV Sub-station, Shahabad (02 Nos.)
(3) 132 KV Sub-station, Sandila (02 Nos.) | 6 | no. | 16,000 ₹96,000 | 14,850 ₹89,100 Lowest | 16,300 ₹97,800 |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
18 Nov 2025, 12:00 pmClosed
Executive Engineer ETD Hardoi
220KV sub station Lucknow Road Hardoi
Repair rectification and overhauling of 145KV circuit breaker at 132KV sub station Shahabad and ACDB of various sub stations
2025_UPTCL_1083700_2
12/ETDH/2025-26
Open Tender
Electrical Works
Fixed-rate
60 days
Hardoi
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Executive Engineer ETD Hardoi
₹2,000
18 Nov 2025
13 Nov 2025
18 Nov 2025
13 Nov 2025
18 Nov 2025
13 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
TD121.pdf
Tender Documents • 0.37 MB
BOQ_2001737.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .