| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹14.9 CrAccepted-AOC G T ROAD MADHAULI CHURAMANPUR BHULLANPUR VARANASI | VARANASI | UTTAR PRADESH | 221001 | ₹14.9 Cr Quoted ₹14.7 Cr | 1 | Accepted-AOC Work in Progress |
| 2 | 2₹18.3 CrRejected-Finance B 104 KESAR GARDEN APARTMENT SECTOR 48 NOIDA GAUTAM BUDDH NAGAR | NOIDA | GAUTAM BUDDH NAGAR | UTTAR PRADESH | ₹18.3 Cr | 2 | Rejected-Finance Higher Rate |
| 3 | 3₹19.0 CrRejected-Finance | ₹19.0 Cr | 3 | Rejected-Finance Higher Rate |
| 4 | 4₹19.1 CrRejected-Finance MOH PADAW NAWABGANJ GONDA U P 271303 | GONDA | UTTAR PRADESH | 271303 | ₹19.1 Cr | 4 | Rejected-Finance Higher Rate |
| 5 | 5₹19.3 CrRejected-Finance | ₹19.3 Cr | 5 | Rejected-Finance Higher Rate |
| Sl No | Description | Qty | Unit | SHIV CONSTRUCTION L4 | ASHTBHUJA CONSTRUCTION L1 | UMESH CHANDRA MISHRA L2 | VINDHYACHAL SINGH L5 | M/S BRAHMDEEEN AND SONS L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 metres. :- Excavation for roadwork in soil with
hydraulic excavator including cutting and loading in tippers, trimming botom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 24,211 | Cum | 59.6 ₹14.4 L | 24.12 ₹5.8 L | 57.28 ₹13.9 L | 60.3 ₹14.6 L | 60 ₹14.5 L |
| 2.00 | Construction of Embankment with Material deposited from
Roadway Cutting:- Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requírement of table 300-2 | 23,377 | Cum | 66.42 ₹15.5 L | 26.88 ₹6.3 L | 63.84 ₹14.9 L | 67.2 ₹15.7 L | 67 ₹15.7 L |
| 3.00 | Construction of Embankment with Material obtained from Borrowpits
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. | 74,651 | Cum | 125.53 ₹93.7 L | 76.2 ₹56.9 L | 120.65 ₹90.1 L | 127 ₹94.8 L | 127 ₹94.8 L |
| 4.00 | G.S.B.Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete. (Two layer) | 10,098 | Cum | 1,757.11 ₹1.8 Cr | 1,422.05 ₹1.4 Cr | 1,688.68 ₹1.7 Cr | 1,777.56 ₹1.8 Cr | 1,790 ₹1.8 Cr |
| 5.00 | Providing, laying spreading and compacting well graded stone aggregates as wet mix macadam specification including premixing the material at OMC in mechanical WMM mixing plant, carriage of mixed material by tipper to site and laying with paver in base course on well prepared surface, compacting with vibratory roller to achieve the desired density. Including cost of material, T&P, labour and all taxes etc. for proper completion of the work. Complete work as per MORT&H specification No. 406. | 8,141 | Cum | 2,213.25 ₹1.8 Cr | 1,724.03 ₹1.4 Cr | 2,127 ₹1.7 Cr | 2,239 ₹1.8 Cr | 2,200 ₹1.8 Cr |
| 6.00 | Providing and applying prime coat with slow setting bitumen emlusion on prepared surface of Granular Base including cleaning of road surface and spraying primer @ 0.70 kg. per sqm. using machenical means as per MORT&H | 32,445 | Sqm | 33.31 ₹10.8 L | 16.85 ₹5.5 L | 31.35 ₹10.2 L | 33.7 ₹10.9 L | 33 ₹10.7 L |
| 7.00 | Providing and applying tack coat with medium setting bitumen emulsion using Bitumen pressure dristributor @ 0.20 to 30kg. per sqm. on the prepared bituminous surface As per MORT&H Clause 503 | 79,345 | Sqm | 16.43 ₹13.0 L | 8.31 ₹6.6 L | 15.79 ₹12.5 L | 16.63 ₹13.2 L | 14 ₹11.1 L |
| 8.00 | Dense Graded Bituminous Macadam
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. (Grade-I) | 2,595 | Cum | 9,393.71 ₹2.4 Cr | 7,602.4 ₹2.0 Cr | 9,027 ₹2.3 Cr | 9,503 ₹2.5 Cr | 9,500 ₹2.5 Cr |
| 9.00 | Dense Graded Bituminous Macadam
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. (Grade-II) | 5,589 | Cum | 10,419.78 ₹5.8 Cr | 8,432.8 ₹4.7 Cr | 10,013 ₹5.6 Cr | 10,541 ₹5.9 Cr | 10,500 ₹5.9 Cr |
| 10.00 | Providing and applying tack coat with medium setting bitumen emulsion using Bitumen pressure dristributor @ 0.25 kg. per sqm. on the prepared bituminous surface As per MORT&H Clause 503 | 1,08,150 | Sqm | 13.9 ₹15.0 L | 7.04 ₹7.6 L | 13.36 ₹14.4 L | 14.07 ₹15.2 L | 14 ₹15.1 L |
Tender Value
₹19.2 Cr
EMD Value
₹38.4 L
Closing Date
25 Dec 2025, 12:00 pmClosed
SE, Mzp Circle, PWD, Mzp.
SE, Mzp Circle, PWD, Mzp.
Widening and Strengthening of Two Lane With Paved Shoulder
2025_CEMRZ_1098073_1
5257/53M-Mzp Circle/2025-26 Dt. 18-11-2025
Open Tender
Civil Works - Roads
455 days
Mirzapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,720
₹38.4 L
Yes
SE, Mzp Circle, PWD, Mzp.
23 Apr 2026
10 Dec 2025
25 Dec 2025
10 Dec 2025
25 Dec 2025
10 Dec 2025
18 Dec 2025
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 metres. :- Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming botom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
Construction of Embankment with Material deposited from Roadway Cutting:- Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requírement of table 300-2
Construction of Embankment with Material obtained from Borrowpits Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
G.S.B.Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete. (Two layer)
Providing, laying spreading and compacting well graded stone aggregates as wet mix macadam specification including premixing the material at OMC in mechanical WMM mixing plant, carriage of mixed material by tipper to site and laying with paver in base course on well prepared surface, compacting with vibratory roller to achieve the desired density. Including cost of material, T&P, labour and all taxes etc. for proper completion of the work. Complete work as per MORT&H specification No. 406.
Providing and applying prime coat with slow setting bitumen emlusion on prepared surface of Granular Base including cleaning of road surface and spraying primer @ 0.70 kg. per sqm. using machenical means as per MORT&H
Providing and applying tack coat with medium setting bitumen emulsion using Bitumen pressure dristributor @ 0.20 to 30kg. per sqm. on the prepared bituminous surface As per MORT&H Clause 503
Dense Graded Bituminous Macadam Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. (Grade-I)
Dense Graded Bituminous Macadam Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. (Grade-II)
Providing and applying tack coat with medium setting bitumen emulsion using Bitumen pressure dristributor @ 0.25 kg. per sqm. on the prepared bituminous surface As per MORT&H Clause 503
Bituminous ConcreteProviding and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonne per hour using crushed aggregates of specified grading premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specifications Clause 509 complete in all respects.
Construction of subgrade and earthen shoulders with approved material obtained from borrowpits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement to Table 300-2 (without lead) (patri work)
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications
Struck pointing 1:2 cement and fine sand mortar on both visibule face of end wall in parapet.
Providing and laying 600 mm dia N.P-3 H.P. jointing with coller in proper position including cost of cement , jute etc. required for proper completion of work. Laying
Providing and laying 600 mm dia N.P-3 H.P. jointing with coller in proper position including cost of cement , jute etc. required for proper completion of work. Pipe
Providing and laying 1000 mm dia N.P-3 H.P. jointing with coller in proper position including cost of cement , jute etc. required for proper completion of work. Laying
Providing and laying 1000 mm dia N.P-3 H.P. jointing with coller in proper position including cost of cement , jute etc. required for proper completion of work. Pipe
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 ( PCC grade- M 10 ) (Nominal Mix 1:3:6)
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 ( PCC grade- M 15 1:2:4 SOR
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.44 MB
Tendernotice_2.pdf
PDF • 1.31 MB
Tendernotice_3.pdf
PDF • 1.13 MB
Tendernotice_4.pdf
PDF • 0.76 MB
BOQ_2022177.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid