Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.9 LAccepted-AOC 7TH MILE UPPER SHILLONG P O NONGLYER SHILLONG MEGHALAYA | EAST KHASI HILLS | MEGHALAYA | 793009 | L1 | Accepted-AOC Awarded | |
| 2 | L2₹48.9 L+₹3.0 L (6.50%)Rejected-Finance 34 KAISER GANJ MANDI DIST MEERUT UP 250002 | MEERUT | UTTAR PRADESH | 250002 | L2 | Rejected-Finance Being L2 | |
| 3 | L3₹50.3 L+₹4.4 L (9.52%)Rejected-Finance 84 POLO HILLS OPPOSITE SBI BRANCH EAST KHASI HILLS SHILLONG MEGHALAYA 793001 | EAST KHASI HILLS | MEGHALAYA | 793001 | L3 | Rejected-Finance Being L3 | |
| 4 | L4₹50.3 L+₹4.4 L (9.69%)Rejected-Finance 7TH MILE UPPER SHILLONG P O NONGLYER SHILLONG MEGHALAYA | EAST KHASI HILLS | MEGHALAYA | 793009 | L4 | Rejected-Finance Being L4 | |
| 5 | L5₹53.8 L+₹7.9 L (17.3%)Rejected-Finance 7TH MILE UPPER SHILLONG P O NONGLYER SHILLONG MEGHALAYA | EAST KHASI HILLS | MEGHALAYA | 793009 | L5 | Rejected-Finance Being L5 |
| Sl No | Description | Qty | Unit | M/S BISWA CONSTRUCTION L8 | M/S DEEDAR ENTERPRISE L6 | M/S RAGHU NATH SAH L4 | M/s Gupta Construction L2 | M/s B.Citymai Syiem L3 | S K ENTERPRISE L7 | M/S Shillong Supply Syndicate L1 | MAHINDER ELECTRICALS L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Complete removal of existing treatment on wall/ roof projections including facia, cornices etc by scrapping with mechanical sander (having mechanical vaccum mechanism) with sanding pad of appropriate grit to make surface clean,free from dust, loose paint etc by skilled labour complete all as specified and directed. | 15,300 | Square Meter | 36 ₹5,50,800 | 25 ₹3,82,500 | 22 ₹3,36,600 | 25 ₹3,82,500 | 28 ₹4,28,400 | 22 ₹3,36,600 | 20 ₹3,06,000 Lowest | 40 ₹6,12,000 |
| 2.00 | Material and labour for waterproof cement based putty @ 1 Kg (undiluted) per sq mtr. of average thickness 1 mm over the plastered/old painted wall after scrapping to prepare the surface even and smooth complete and sanding of the putty surface with mechanical wall sander (having mechanical vacuum mechanism) having RPM not less than 1500, sanding pad of 240 Grit or above to make the surface free from dust etc. by skilled labour as per following steps:-
Step 1 Mix the putty powder by adding water as per manufacturer instructions and mix it with putty mixer with the mixing capacity of min 2.5 kg putty per minute.
Step 2 Apply the first coat the prepared mixer with the help of fully automatic airless spray machine of putty application having flow speed of max 6 ltrs per minutes with a maximum pressure 3300 PSI Step 3) Allow 6-8 hrs time to dry the putty surface. | 15,300 | Square Meter | 66 ₹10,09,800 | 90 ₹13,77,000 | 62 ₹9,48,600 | 58 ₹8,87,400 | 60 ₹9,18,000 | 73 ₹11,16,900 | 57 ₹8,72,100 Lowest | 70 ₹10,71,000 |
| 3.00 | Material and labour for one coat of acrylic water based exterior grade primer @0.9 ltr (undiluted)/10 sq mtrs diluted with water in 1:1 ratio to be applied with fully automatic airless spray machine of paint application with a flow speed of min 1 ltr per minute having a pressure of 3300 PSI Allow 6-8 hrs to dry the surface for painting of subsequent coats complete all as specified and directed. | 13,100 | Square Meter | 76 ₹9,95,600 | 96 ₹12,57,600 | 78 ₹10,21,800 | 72 ₹9,43,200 | 70 ₹9,17,000 Lowest | 83 ₹10,87,300 | 77 ₹10,08,700 | 70 ₹9,17,000 Lowest |
| 4.00 | Material and labour for one coat of acrylic water based interior grade primer @0.8 ltr (undiluted)/10 sq mtrs diluted with water in 1:1 ratio to be applied with fully automatic airless spray machine of paint application with a flow speed of min 1 ltr per minute having a pressure of 3300 PSI Allow 6-8 hrs to dry the surface for painting of subsequent coats. | 2,200 | Square Meter | 86 ₹1,89,200 | 110 ₹2,42,000 | 74 ₹1,62,800 | 84 ₹1,84,800 | 85 ₹1,87,000 | 86 ₹1,89,200 | 67 ₹1,47,400 Lowest | 80 ₹1,76,000 |
| 5.00 | Material and labour for two coat water based premium acrylic smooth exterior emulsion of approved colour with silicon additive & Color stay Technology, Excellent Dirt Pick up resistance with low VOC less than 50 gram/ litre as per the LEEDS specifications, Anti Algal properties in two coats @ 1.79 ltr (undiluted)/ 10 sqm diluted with water as per manufacturer instructions applied over priming coat with fully automatic airless spray machine of paint application with a flow speed of min 1 ltr per minute having a pressure of 3300 PSI.Allow 6-8 hrs to dry the surface in both the coats of paint with using auto roller for making the surface uniform complete all as directed. | 13,100 | Square Meter | 156 ₹20,43,600 | 85 ₹11,13,500 Lowest | 140 ₹18,34,000 | 136 ₹17,81,600 | 140 ₹18,34,000 | 162 ₹21,22,200 | 121 ₹15,85,100 | 140 ₹18,34,000 |
| 6.00 | Material and labour for applying two coats of oil bound distemper using Airless spray technology with max working pressure of 3300 PSI and capable of operating single spray gun with a max material hose length of 30 mtr the spray machine should be of reputed manufacturer with pro guard technology and capability of tracking pressure and paint usage and certified by paint manufacturer and as mentioned in PS and accessories for applying distemper should be able to spray in hard to reach areas and penetration of distemper on the surface with using auto roller for making the surface uniform complete all as specified and directed.
Note : - (a) Sanding of surface to be done by mechanical sander with 1500 - 2700 rpm, with internal dust extraction system for clean environment certified by paint manufacturer. Proper mashking to be carried out before primer and paint application | 2,200 | Square Meter | 86 ₹1,89,200 | 89 ₹1,95,800 | 80 ₹1,76,000 | 81 ₹1,78,200 | 85 ₹1,87,000 | 84 ₹1,84,800 | 75 ₹1,65,000 Lowest | 80 ₹1,76,000 |
| 7.00Note against Item No 01 to 05 and Additional Note against Item No 06 : (a.) The prepatory and application work pertaining to periodical services & Water Proofing shall be executed from authorized applicator duly certified by manufacturer of the Paint, Distemper, Putty etc. Before execution of work necessary approval shall be taken from Garrison Engineer with all documentary evidances. (b) Necessary scaffolding and ladder of approx. 10 m height shall be provided by the contractor in his own arrangement. Green cloth shall be provided all around the work site for any position/ height with all safety precaution (i.e Safety Jacket, Safety Shoes, Safety Masks, Safety Helmet, Safety harness, Safety Goggles etc.) Without safety precaution this work not been commenced as decided by Engineer-In-Charge/ by Garrison Engineer. No extra cost shall be paid for such precaution. Such precaution shall be deemed to be included in the quoted rate. (c.) The contractor shall upload along with the documents under cover-I (i.e Technical Bid), ‘Memorandum of Understanding’ (MOU) duly notarised not later than 03 months with only one manufacturer mentioned in the Contract Agreement, failing which the bid shall be liable to be rejected and Cover-II ( i.e. Financial bid) will not be opened. Validity of MOU shall be valid during the currency of the work. During currency of the work only those worker shall be worked at site who will be duly cerified by the Manufacturer. Both side affidavit of Rs/- 10 stamp paper i.e. from the side of Manufacturer and from the side of worker shall be provided during the currency of work. (d) Insurance for each worker shall be provided during currency of the work and no extra cost shall be paid. The same shall be deemed to be included in the quoted rate. (e) No work shall be commenced without furnishing above documents to the concerned authority. (f) Masking of window/doors during spray painting using polythine film shall be deemed to be included in the quoted rate. (g) No payment for additional height shall be paid to the contactor. (h) Cleaning and clearing site of paint, mats etc. are deemed to be included in the quoted rate. No completion will be issued without proper cleaning of site as per direction of Garrison Engineer or by the Engineer-In-Charge. | |||||||||||
| 8.00 | Material and labour for rendering 10 mm thick on internal surface of brick work or concrete surfaces in cement mortar 1:6 and finishing the surfaces even and smooth without using extra cement including taking down cement plaster complete all as specified and as directed by Engineer-In-Charge. | 180 | Square Meter | 466 ₹83,880 | 600 ₹1,08,000 | 420 ₹75,600 | 375 ₹67,500 Lowest | 400 ₹72,000 | 420 ₹75,600 | 400 ₹72,000 | 450 ₹81,000 |
| 9.00 | Material and labour for 5 mm thick rendering in cement mortar 1:3 on fair faces of ceiling surfaces, finished the surfaces even and smooth without using extra cement including taking down cement plaster complete all as specified. | 40 | Square Meter | 426 ₹17,040 | 450 ₹18,000 | 400 ₹16,000 | 425 ₹17,000 | 380 ₹15,200 Lowest | 400 ₹16,000 | 380 ₹15,200 Lowest | 420 ₹16,800 |
| 10.00 | Material and labour for 15 mm thick rendering in cement mortar 1:4 in two layers (10 mm +5 mm) on external faces of brick wall or concrete surfaces, finished the surfaces even and smooth without using extra cement with using approved Liquid Water Proofing Compound on second layer (5 mm) as per manufacturer instruction including taking down cement plaster complete all as specified and as directed by Engineer-In-Charge.
Note: (a) Liquid Water Proofing Compound shall be measured and paid including this item
(b) Certificate from Manufacturer of Liquid Water Proofing Compound shall be provided for necessary quanity aginst total mix either Cum or by weight of Cement bag. | 500 | Square Meter | 526 ₹2,63,000 | 685 ₹3,42,500 | 500 ₹2,50,000 | 475 ₹2,37,500 | 500 ₹2,50,000 | 480 ₹2,40,000 | 450 ₹2,25,000 Lowest | 500 ₹2,50,000 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
24 Jul 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE I AF Shillong
GE (I) (AF) Shillong Elephant Falls Camp PO Nonglyer Shillong-793009
SMART PERIODICAL TO CERTAIN BUILDING OF SMQ AREA AND OTM ACCOMODATION AT HQ EAC (U) AF UNDER GE(I) AF SHILLONG
2025_MES_716834_1
8046/25/E8
Open Tender
Civil Works
Item Rate
180 days
GE I AF SHILLONG
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE I AF SHILLONG
₹80,000
Yes
20 Aug 2025
26 Jun 2025
31 Jul 2025
26 Jun 2025
24 Jul 2025
10 Jul 2025
Amount
Complete removal of existing treatment on wall/ roof projections including facia, cornices etc by scrapping with mechanical sander (having mechanical vaccum mechanism) with sanding pad of appropriate grit to make surface clean,free from dust, loose paint etc by skilled labour complete all as specified and directed.
Material and labour for waterproof cement based putty @ 1 Kg (undiluted) per sq mtr. of average thickness 1 mm over the plastered/old painted wall after scrapping to prepare the surface even and smooth complete and sanding of the putty surface with mechanical wall sander (having mechanical vacuum mechanism) having RPM not less than 1500, sanding pad of 240 Grit or above to make the surface free from dust etc. by skilled labour as per following steps:- Step 1 Mix the putty powder by adding water as per manufacturer instructions and mix it with putty mixer with the mixing capacity of min 2.5 kg putty per minute. Step 2 Apply the first coat the prepared mixer with the help of fully automatic airless spray machine of putty application having flow speed of max 6 ltrs per minutes with a maximum pressure 3300 PSI Step 3) Allow 6-8 hrs time to dry the putty surface.
Material and labour for one coat of acrylic water based exterior grade primer @0.9 ltr (undiluted)/10 sq mtrs diluted with water in 1:1 ratio to be applied with fully automatic airless spray machine of paint application with a flow speed of min 1 ltr per minute having a pressure of 3300 PSI Allow 6-8 hrs to dry the surface for painting of subsequent coats complete all as specified and directed.
Material and labour for one coat of acrylic water based interior grade primer @0.8 ltr (undiluted)/10 sq mtrs diluted with water in 1:1 ratio to be applied with fully automatic airless spray machine of paint application with a flow speed of min 1 ltr per minute having a pressure of 3300 PSI Allow 6-8 hrs to dry the surface for painting of subsequent coats.
Material and labour for two coat water based premium acrylic smooth exterior emulsion of approved colour with silicon additive & Color stay Technology, Excellent Dirt Pick up resistance with low VOC less than 50 gram/ litre as per the LEEDS specifications, Anti Algal properties in two coats @ 1.79 ltr (undiluted)/ 10 sqm diluted with water as per manufacturer instructions applied over priming coat with fully automatic airless spray machine of paint application with a flow speed of min 1 ltr per minute having a pressure of 3300 PSI.Allow 6-8 hrs to dry the surface in both the coats of paint with using auto roller for making the surface uniform complete all as directed.
Material and labour for applying two coats of oil bound distemper using Airless spray technology with max working pressure of 3300 PSI and capable of operating single spray gun with a max material hose length of 30 mtr the spray machine should be of reputed manufacturer with pro guard technology and capability of tracking pressure and paint usage and certified by paint manufacturer and as mentioned in PS and accessories for applying distemper should be able to spray in hard to reach areas and penetration of distemper on the surface with using auto roller for making the surface uniform complete all as specified and directed. Note : - (a) Sanding of surface to be done by mechanical sander with 1500 - 2700 rpm, with internal dust extraction system for clean environment certified by paint manufacturer. Proper mashking to be carried out before primer and paint application
Note against Item No 01 to 05 and Additional Note against Item No 06 : (a.) The prepatory and application work pertaining to periodical services & Water Proofing shall be executed from authorized applicator duly certified by manufacturer of the Paint, Distemper, Putty etc. Before execution of work necessary approval shall be taken from Garrison Engineer with all documentary evidances. (b) Necessary scaffolding and ladder of approx. 10 m height shall be provided by the contractor in his own arrangement. Green cloth shall be provided all around the work site for any position/ height with all safety precaution (i.e Safety Jacket, Safety Shoes, Safety Masks, Safety Helmet, Safety harness, Safety Goggles etc.) Without safety precaution this work not been commenced as decided by Engineer-In-Charge/ by Garrison Engineer. No extra cost shall be paid for such precaution. Such precaution shall be deemed to be included in the quoted rate. (c.) The contractor shall upload along with the documents under cover-I (i.e Technical Bid), ‘Memorandum of Understanding’ (MOU) duly notarised not later than 03 months with only one manufacturer mentioned in the Contract Agreement, failing which the bid shall be liable to be rejected and Cover-II ( i.e. Financial bid) will not be opened. Validity of MOU shall be valid during the currency of the work. During currency of the work only those worker shall be worked at site who will be duly cerified by the Manufacturer. Both side affidavit of Rs/- 10 stamp paper i.e. from the side of Manufacturer and from the side of worker shall be provided during the currency of work. (d) Insurance for each worker shall be provided during currency of the work and no extra cost shall be paid. The same shall be deemed to be included in the quoted rate. (e) No work shall be commenced without furnishing above documents to the concerned authority. (f) Masking of window/doors during spray painting using polythine film shall be deemed to be included in the quoted rate. (g) No payment for additional height shall be paid to the contactor. (h) Cleaning and clearing site of paint, mats etc. are deemed to be included in the quoted rate. No completion will be issued without proper cleaning of site as per direction of Garrison Engineer or by the Engineer-In-Charge.
Material and labour for rendering 10 mm thick on internal surface of brick work or concrete surfaces in cement mortar 1:6 and finishing the surfaces even and smooth without using extra cement including taking down cement plaster complete all as specified and as directed by Engineer-In-Charge.
Material and labour for 5 mm thick rendering in cement mortar 1:3 on fair faces of ceiling surfaces, finished the surfaces even and smooth without using extra cement including taking down cement plaster complete all as specified.
Material and labour for 15 mm thick rendering in cement mortar 1:4 in two layers (10 mm +5 mm) on external faces of brick wall or concrete surfaces, finished the surfaces even and smooth without using extra cement with using approved Liquid Water Proofing Compound on second layer (5 mm) as per manufacturer instruction including taking down cement plaster complete all as specified and as directed by Engineer-In-Charge. Note: (a) Liquid Water Proofing Compound shall be measured and paid including this item (b) Certificate from Manufacturer of Liquid Water Proofing Compound shall be provided for necessary quanity aginst total mix either Cum or by weight of Cement bag.
Note against Item No 08 and 09 & Additional Note against Item No 10 : (a) Necessary scaffolding and ladder of approx. 10 m height shall be provided by the contractor in his own arrangement. Green cloth shall be provided all around the work site for any position/ height with all safety precaution (i.e Safety Jacket, Safety Shoes, Safety Masks, Safety Helmet, Safety harness, Safety Goggles etc.) Without safety precaution this work not been commenced as decided by Engineer-In-Charge/ by Garrison Engineer. No extra cost shall be paid for such precaution. Such precaution shall be deemed to be included in the quoted rate. (b) Insurance for each worker shall be provided during currency of the work and no extra cost shall be paid. The same shall be deemed to be included in the quoted rate. (c) No work shall be commenced without furnishing above documents to the concerned authority. (d) No payment for additional height shall be paid to the contactor.
Material and labour for preparation of old plastered or unplastered wall surfaces including brooming down or steel wire brushing , scrapping down smoke, soot , moulds , moss and efflorescent salts and trading oil and greasy spots etc and applying one coat of oil bound distemper with roller finish complete all as per manufacturer instruction
Material and labour for preparation of new plastered untreated ceiling/ soffits surface and applying two coats of oil bound distemper over a coat of alkali resistance primer with roller finish complete all as per manufacturer instruction
Material and labour for preparation of new plastered untreated wall surface and applying two coats of oil bound distemper over a coat of alkali resistance primer with roller finish complete all as per manufacturer instruction
Material and labour for providing and applying wall care putty of 1 mm thickness over plastered surface to prepare the surface even and smooth with roller finish complete all as per manufacturer instruction
Material and labour for preparation of old treated wood and wood based surfaces of any description, not otherwise described over 10cm width or girth and applying one coat of synthetic enamel paint complete all as specified and directed
Material and labour for preparation of old treated wooden surfaces of any description, not exceeding 10cm width or girth and applying one coat of synthetic enamel paint complete all as specified and directed
Material and labour for preparation of old treated steel surfaces of any description, not otherwise described over 10cm width or girth and applying one coat of synthetic enamel paint complete all as specified and directed
Material and labour for preparation of old treated steel surfaces of any description, not exceeding 10cm width or girth and applying one coat of synthetic enamel paint complete all as specified and directed
Material and labour for preparation of old eaves, gutter and pipes of any description, not exceeding 60 cm girth including holderbars, distance pieces etc. (length measured over bends, branches etc.) and applying one coat of synthetic enamel paint complete all as specified and directed
M/s Gupta Construction (BID ID -3361956)
M/s B.Citymai Syiem (BID ID -3361987)
M/S RAGHU NATH SAH (BID ID -3361725)
MAHINDER ELECTRICALS (BID ID -3361926)
M/S DEEDAR ENTERPRISE (BID ID -3361702)
S K ENTERPRISE (BID ID -3369272)
M/S BISWA CONSTRUCTION (BID ID -3356589)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .