Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹82.3 CrAccepted-AOC AHEMDABAD B WING 15TH FLOOR PRIVILON BUILDING VIKRAM NAGAR AMBALI BOPAL ROAD BEHIND ISCONTAMPLE AHEMDABAD 380058 GUJRAT INDIA | AHMADABAD | GUJARAT | 380058 | L1 | Accepted-AOC ok | |
| 2 | L2₹88.3 Cr+₹6.0 Cr (7.24%)Rejected-AOC 1ST FLOOR 83 84 SARDAR SHOPPING CENTRE JILLA PANCHYAT ROAD AMRELI GUJARAT | AMRELI | AMRELI | GUJARAT | 365601 | L2 | Rejected-AOC ok | |
| 3 | L3₹89.3 Cr+₹7.0 Cr (8.46%)Rejected-AOC 1ST FLOOR H NO 858 P SEC 23 HUDA BHIWANI 127021 | BHIWANI | BHIWANI | HARYANA | 127021 | L3 | Rejected-AOC ok | |
| 4 | L4₹94.9 Cr+₹12.6 Cr (15.3%)Rejected-AOC | L4 | Rejected-AOC ok | |
| 5 | L5₹106.4 Cr+₹24.1 Cr (29.2%)Rejected-AOC 116A 11TH FLOOR MAKERS CHAMBER VI 220 NARIMAN POINT MUMBAI 400021 | MUMBAI | MUMBAI | MAHARASHTRA | 400021 | L5 | Rejected-AOC ok |
Tender Value
₹82.3 Cr
EMD Value
₹1.6 Cr
Closing Date
7 May 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Sinchai Bhawan Jhajjar
Work of installation of solar powered pressurized irrigation infrastructure for micro irrigation of Behrampur STP
2022_HRY_217338_1
Behrampur
Open Tender
Civil Works
Works
545 days
Jhajjar
Please refer Tender documents.
3 documents required · 3 mandatory
₹50,000
₹1.6 Cr
Yes
25/04/2022
21 Jul 2022
18 Apr 2022
9 May 2022
18 Apr 2022
7 May 2022
18 Apr 2022
25 Apr 2022
120 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. (1) All Kind of Soil. (HSR 4.12.1) | 36,869.58 | Cum | - | - |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. HSR 4.32 | 335.38 | Cum | - | - |
| 3Providing and laying in position ready mixed plain cement concrete, with cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durablity as per direction of Engineer-in-Charge | |||||
| 3.01 | M-15 grade plan cement concrete cement content considered @240 kg per cum HSR 6.22.2.2 | 761.11 | Cum | - | - |
| 4Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Less cement used as per design mix is recoverable. However no extra payment shall be made if excess cement is used as per design mix). | |||||
| 4.01 | (1) All works up to plinth level. (HSR 6.25.1) | 4,059.74 | cum | - | - |
| 4.02 | All works above plinth level up to floor IV level. (HSR 6.25.2) | 31.65 | cum | - | - |
| 5Centering and shuttering including strutting, propping etc. and removal of form for: | |||||
| 5.01 | Foundations, footings, bases of columns, etc. for mass concrete HSR 6.30.1 | 703.14 | Sqmt | - | - |
| 5.02 | Suspended floors, roofs, landings, balconies and access platform HSR 6.30.3 | 80.6 | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_285158.xls
BOQ Document • 0.31 MB
96426297.pdf
Tender Document • 0.08 MB
bid_berhampur.pdf
Tender Document • 3.89 MB
96426299.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .