Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.5 LAccepted-AOC | L1 | Accepted-AOC Due to L1 | |
| 2 | L2₹40 L+₹7.5 L (23.3%)Rejected-AOC VILL SAKRAS TEHSIL F P JHIRKA DISTT NUH | NUH | HARYANA | 122103 | L2 | Rejected-AOC Due to L2 | |
| 3 | L3₹42.6 L+₹10.2 L (31.3%)Rejected-AOC | L3 | Rejected-AOC Due to L3 | |
| 4 | L4₹43.1 L+₹10.7 L (32.9%)Rejected-AOC PALWAL | L4 | Rejected-AOC Due to L4 | |
| 5 | L5₹43.4 L+₹10.9 L (33.7%)Rejected-AOC WARD NO 2 DELHI ALWAR ROAD NUH MEWAT 122107 | NUH | MEWAT | HARYANA | 122107 | L5 | Rejected-AOC Due to L5 |
| Sl No | Description | Qty | Unit | M/S SHREE BALAJI BUILDERS L6 | Hamid Hussain, Contractor L5 | Talim Hussain Contractor L4 | M/S MOHD. SIRAJ CONTRACTOR L1 | RAJESH BESAR CONTRACTOR L2 | MANISH KUMAR CONTRACTOR L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Comprehensive maintenance work of water supply scheme, F.P. Jhirka town, including all Civil, Electrical and mechanical installation mentioned in Annexure-I and all other works contingent thereto under PHE Divn. No. 1, Nuh period of 36 Months from the date of commencement.
1st year........................ | 1 | Job | 14,00,000 ₹14,00,000 | 14,00,000 ₹14,00,000 | 14,10,000 ₹14,10,000 | 11,00,000 ₹11,00,000 Lowest | 13,00,000 ₹13,00,000 | 14,20,000 ₹14,20,000 |
| 2.00 | Comprehensive maintenance work of water supply scheme, F.P. Jhirka town, including all Civil, Electrical and mechanical installation mentioned in Annexure-I and all other works contingent thereto under PHE Divn. No. 1, Nuh period of 36 Months from the date of commencement.
2nd year........................ | 1 | Job | 15,00,000 ₹15,00,000 | 14,38,000 ₹14,38,000 | 14,37,000 ₹14,37,000 | 10,00,000 ₹10,00,000 Lowest | 13,50,000 ₹13,50,000 | 14,20,000 ₹14,20,000 |
| 3.00 | Comprehensive maintenance work of water supply scheme, F.P. Jhirka town, including all Civil, Electrical and mechanical installation mentioned in Annexure-I and all other works contingent thereto under PHE Divn. No. 1, Nuh period of 36 Months from the date of commencement.
3rd year........................ | 1 | Job | 16,00,000 ₹16,00,000 | 15,00,000 ₹15,00,000 | 14,65,000 ₹14,65,000 | 11,45,000 ₹11,45,000 Lowest | 13,50,000 ₹13,50,000 | 14,20,000 ₹14,20,000 |
Tender Value
₹52.0 L
EMD Value
₹1.0 L
Closing Date
11 Nov 2025, 1:00 pmClosed
AMIT KUMAR SANDILA
Nuh (P) PHED No. 1
mtc. work of pumping machinery of the existing T/wells and Boosting station repair/ replacement of electrical items, i.e. Switch, Kit, kat (63Amp - 100 Amp) , ceiling fan, Starter oil, Panel Board complete (Starter, Ampere meter, volt meter etc.) S
2025_HRY_480057_1
2025B7DBD17A 7684 45C6 A1BA 75030D54B012560PUH
Open Tender
Civil Works
Works
1095 days
F. P. Zhirka
mtc. work of pumping machinery of the existing T/wells and Boosting station repair/ replacement of electrical items, i.e. Switch, Kit, kat (63Amp - 100 Amp) , ceiling fan, Starter oil, Panel Board complete (Starter, Ampere meter, volt meter etc.) S
2 documents required · 2 mandatory
₹5,000
₹1.0 L
Yes
26 Dec 2025
28 Oct 2025
11 Nov 2025
28 Oct 2025
11 Nov 2025
28 Oct 2025
Amount
Comprehensive maintenance work of water supply scheme, F.P. Jhirka town, including all Civil, Electrical and mechanical installation mentioned in Annexure-I and all other works contingent thereto under PHE Divn. No. 1, Nuh period of 36 Months from the date of commencement. 1st year........................
Comprehensive maintenance work of water supply scheme, F.P. Jhirka town, including all Civil, Electrical and mechanical installation mentioned in Annexure-I and all other works contingent thereto under PHE Divn. No. 1, Nuh period of 36 Months from the date of commencement. 2nd year........................
Comprehensive maintenance work of water supply scheme, F.P. Jhirka town, including all Civil, Electrical and mechanical installation mentioned in Annexure-I and all other works contingent thereto under PHE Divn. No. 1, Nuh period of 36 Months from the date of commencement. 3rd year........................
RAJESH BESAR CONTRACTOR (BID ID -1368389)
MANISH KUMAR CONTRACTOR (BID ID -1369291)
Talim Hussain Contractor (BID ID -1364421)
Hamid Hussain, Contractor (BID ID -1363939)
M/S SHREE BALAJI BUILDERS (BID ID -1364973)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
Additional Documents
Additional Documents • 0.90 MB
BOQ_558029.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .