Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹28.4 LAdmitted-Finance | -42.91% | ₹28.4 L | L1 | Admitted-Finance |
| 2 | L2₹29.0 L+₹55,742.49 (1.96%)Admitted-Finance | -41.79% | ₹29.0 L+₹55,742.49 (1.96%) | L2 | Admitted-Finance |
| 3 | L3₹38.5 L+₹10.1 L (35.5%)Admitted-Finance | -22.66% | ₹38.5 L+₹10.1 L (35.5%) | L3 | Admitted-Finance |
| 4 | L4₹39.0 L+₹10.6 L (37.4%)Admitted-Finance | -21.56% | ₹39.0 L+₹10.6 L (37.4%) | L4 | Admitted-Finance |
Tender Value
₹50 L
EMD Value
₹1 L
Closing Date
19 Aug 2026, 4:00 pmClosed
EXECUTIVE ENGINEER, SKICC
SKICC, chesmashahi, Sriangar
Upgradation of Road in the back Lawns wall CC Road and other allied works
2026_Tourm_320132_1
16-SKICC of 2026-27 dated 08-08-2026
Open Tender
Civil Works
Percentage
60 days
SKICC, chesmashahi, Sriangar
UPLOAD ALL DOCUMENT AS PER NIT AND ANNEXURE-I AND II OF THE TENDER NOTICE
3 documents required · 3 mandatory
₹2,000
Director, SKICC as per NIT
₹1 L
27 Aug 2026
8 Aug 2026
20 Aug 2026
8 Aug 2026
19 Aug 2026
8 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. | 226.2 | Cum | 1,740.45 | ₹3,93,689.79 |
| 2 | Prov and laying of stone soling hand packed 90-150 mm size incl carraige complete job. | 65.29 | Cum | 1,000 | ₹65,290 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 111.53 | Cum | 7,788.4 | ₹8,68,640.25 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 11,152.65 | Kg | 123.2 | ₹13,74,006.48 |
| 5Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and during complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand). | |||||
| 5.01 | New | 58 | Cum | 9,131.9 | ₹5,29,650.2 |
| 5.02 | Old | 173 | Cum | 2,500 | ₹4,32,500 |
| 6Dry random rubble masonary with hard stone in foundation and plinth with bond stone. | |||||
| 6.01 | New | 16 | Cum | 5,536.55 | ₹88,584.8 |
| 6.02 | Old | 48 | Cum | 2,000 | ₹96,000 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_1062738.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .