Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Finance | ₹2.9 L | L1 | Admitted-Finance |
| 2 | L2₹3.0 LAdmitted-Finance | ₹3.0 L | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-withdraw the Contractor |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-withdraw the Contractor |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-withdraw the Contractor |
| Sl No | Description | Qty | Unit | A VADIVEL L1 | SIVARANJANI CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00Providing Extension of Pipeline Main Line at SriLankan Refugee Camp Thoppukkollai in Thiruvarankulam Panchayat. | |||||
| 2.00 | Earth work excavation in all soils with initial lead of 10m and lift of 2 M including | 325.08 | cum | 329.5 ₹1.1 L | 330 ₹1.1 L |
| 3.00 | Supply and delivery of following PVC pipes 63mm OD PVC 4 Ksc Pipes | 516 | RM | 53.5 ₹27,606 | 55 ₹28,380 |
| 4.00 | Conveyance of the following rigid PVC Pipes, lowering to trenches and laying to proper grade and alignment 63mm OD PVC 4 Ksc Pipes | 516 | RM | 23.5 ₹12,126 | 25 ₹12,900 |
| 5.00 | Refilling the excaveted earth including all labour chrges and etc complete | 325.08 | cum | 45.5 ₹14,791.14 | 47 ₹15,278.76 |
| 6.00Provision for Rainwater Harvesting and Fencing | |||||
| 7.00 | Earth work excavation and depositing on bank with initial lead and lift in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for foundation. | 5.8 | cum | 263.5 ₹1,528.30 | 265 ₹1,537 |
| 8.00 | Cement Concrete 1:4: 8 (one cement, two M.Sand and four hard broken stone jelly) using 40 mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 1.81 | cum | 5,479 ₹9,916.99 | 5,492 ₹9,940.52 |
| 9.00 | Brick work in following Cement Mortar 1:5 using best quality II class table moulded bricks 8"3/4 x 41/4" X23/4" for foundation and basement including curing etc.,complete complying with standard specification | 0.38 | cum | 6,160 ₹2,340.80 | 6,178 ₹2,347.64 |
| 10.00 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 3.41 | cum | 6,770 ₹23,085.70 | 6,796 ₹23,174.36 |
Tender Value
₹3.1 L
EMD Value
₹3,100
Closing Date
13 Mar 2026, 3:00 pmClosed
BDO, Thiruvarankulam
Pt. Union office, Thiruvarankulam
Providing Extension of Pipeline Main Line at SriLankan Refugee Camp Thoppukkollai in Thiruvarankulam Panchayat.
2026_RDTN_672229_1
Tvk/PUGF/SrilanganCamp/Work-11
Open Tender
Civil Works
Thiruvarankulam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3,100
11 May 2026
9 Mar 2026
13 Mar 2026
9 Mar 2026
13 Mar 2026
9 Mar 2026
Providing Extension of Pipeline Main Line at SriLankan Refugee Camp Thoppukkollai in Thiruvarankulam Panchayat.
Earth work excavation in all soils with initial lead of 10m and lift of 2 M including
Supply and delivery of following PVC pipes 63mm OD PVC 4 Ksc Pipes
Conveyance of the following rigid PVC Pipes, lowering to trenches and laying to proper grade and alignment 63mm OD PVC 4 Ksc Pipes
Refilling the excaveted earth including all labour chrges and etc complete
Provision for Rainwater Harvesting and Fencing
Earth work excavation and depositing on bank with initial lead and lift in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for foundation.
Cement Concrete 1:4: 8 (one cement, two M.Sand and four hard broken stone jelly) using 40 mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Brick work in following Cement Mortar 1:5 using best quality II class table moulded bricks 8"3/4 x 41/4" X23/4" for foundation and basement including curing etc.,complete complying with standard specification
Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Suplly and fixing of Cut Stone Pillar of size 0.15 x 0.15 x 2.1m including cost and conveyance of all charges etc
Chain Link - 2" x 2" using 10 Gauge Galvanised Iron Wire (of all sizes) including all cost and conveyance and all labour charges and all other incidental charges etc., completed.
Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 1 & 13 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
Tvk_doc--11.pdf
Tender Documents • 0.18 MB
BOQ_807899.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid