| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.4 CrAccepted-AOC 9 PPCL COLONY UDAY VIHAR HARIDWAR BYPASS DEHRADUN UTTARAKHAND | DEHRADUN | DEHRADUN | UTTARAKHAND | ₹36.4 Cr | L1 | Accepted-AOC Lowest L1 |
| 2 | L2₹39.8 Cr+₹3.3 Cr (9.14%)Rejected-Finance 1734 SECTOR 21 PANCHKULA 134112 HARYANA | PANCHKULA | HARYANA | 134112 | ₹39.8 Cr+₹3.3 Cr (9.14%) | L2 | Rejected-Finance More than Lowest L1 bidder |
| 3 | L3₹42.0 Cr+₹5.5 Cr (15.2%)Rejected-Finance KAISERGANJ BAHRAICH U P 271903 | BAHRAICH | UTTAR PRADESH | 271903 | ₹42.0 Cr+₹5.5 Cr (15.2%) | L3 | Rejected-Finance More than Lowest L1 bidder |
| 4 | L4₹51.9 Cr+₹15.5 Cr (42.5%)Rejected-Finance HN 2K 74 KANKE 2K 74 BARIATU HOUSING COLONY BARIATU RANCHI 834009 JHARKHAND VILLAGE TOWN RANCHI CITY RANCHI RANCHI JHARKHAND 834009 INDIA | RANCHI | JHARKHAND | 834009 | ₹51.9 Cr+₹15.5 Cr (42.5%) | L4 | Rejected-Finance More than Lowest L1 bidder |
| 5 | Rejected-Technical NO 91 GROUND FLOOR 3RD CROSS ROAD OPPOSITE VASAVI KANNIKA PARAMESHWARI TEMPLE BENGALURU BENGALURU 560021 KARNATAKA INDIA | BENGALURU | BENGALURU | KARNATAKA | 560021 | - | - | Rejected-Technical Not meeting NIT criteria |
| Sl No | Description | Qty | Unit | BABA PROJECTS PVT LTD L4 | HINDUSTAN CONSTRUCTION L3 | JKA ASSOCIATES PVT LTD L2 | Bharat Constructions (India) Pvt. Ltd. L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator of 0.9 cum bucket capacity) in all kinds of soil including all types of rocks excluding hard rock over areas including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, transporting and unloading to the embankment/filling location within all lifts and lead upto 1000m. | 99,156 | cum | 269 ₹2,66,72,964 | 70 ₹69,40,920 | 100 ₹99,15,600 | 68 ₹67,42,608 Lowest |
| 2.00 | Banking excavated Earth/ordinary rock in layers not excceding 20 cm in depth, breaking clods, watering, rolling each layer with earth compactor/ vibratory roller of minimum 8-12 tonne capacity including leveling to the required grade and camber, dressing etc. in embankments to achieve desired density as per the direction of Enginner-in-charge. (a) All kinds of soil including ordinary rock. (As per MoRTH specifications) | 9,916 | cum | 322 ₹31,92,952 | 50 ₹4,95,800 | 100 ₹9,91,600 | 27 ₹2,67,732 Lowest |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 cement : 4 coarse sand (zone-III): 8 graded stone aggregate 40 mm nominal size). | 234 | Cum | 6,507 ₹15,22,638 | 5,000 ₹11,70,000 Lowest | 6,702 ₹15,68,268 | 5,722 ₹13,38,948 |
| 4.00 | Centering and shuttering including strutting, propping etc. and removal of form work for :Foundations, footings, bases for columns | 820.8 | Sqm | 484 ₹3,97,267.2 | 400 ₹3,28,320 | 250 ₹2,05,200 Lowest | 329 ₹2,70,043.2 |
| 5.00 | Centering and shuttering including strutting, propping etc. and removal of form work for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 4,090 | Sqm | 752 ₹30,75,680 | 400 ₹16,36,000 | 250 ₹10,22,500 Lowest | 707 ₹28,91,630 |
| 6.00 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level.:Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,12,080 | Kg | 91 ₹1,01,99,280 | 72 ₹80,69,760 | 70 ₹78,45,600 Lowest | 91 ₹1,01,99,280 |
| 7.00 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.
(i) All works upto plinth level
(a) Concrete of M35 grade with minimum cement content of 370 kg /cum. | 992 | cum | 8,257 ₹81,90,944 | 7,200 ₹71,42,400 Lowest | 8,415.41 ₹83,48,086.72 | 8,238 ₹81,72,096 |
| 8.00 | Preparation of granular sub-base by providing close graded material, conforming to specifications mixing in a mechanical mix plant at OMC, carriage of mixed material by mechanical transport to work site, for all leads and lifts, spreading in uniform layers of specified thickness with mechanical means including neatly leveling & dressing on prepared surface and compacting with vibratory power roller to achieve the desired density, complete and as per direction of Engineer-in-charge | 12,793 | cum | 3,583 ₹4,58,37,319 | 3,500 ₹4,47,75,500 | 2,875.11 ₹3,67,81,282.23 Lowest | 3,588 ₹4,59,01,284 |
| 9.00 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. | 10,809 | cum. | 3,712 ₹4,01,23,008 | 3,700 ₹3,99,93,300 | 2,934.61 ₹3,17,20,199.49 Lowest | 3,570 ₹3,85,88,130 |
| 10.00 | Construction of dry lean cement concrete sub base over a prepared subgrade with coarse and fine aggregate conforming to IS:383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per specifications, cement content not to be less than 150 Kg/cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, for all leads & lifts, laid with a mechanical paver, compacting with 8-10 tonne vibratory roller, finishing and curing etc. complete as per direction of Engineer-in-charge. | 9,336 | cum | 6,258 ₹5,84,24,688 | 4,900 ₹4,57,46,400 | 5,100.38 ₹4,76,17,147.68 | 4,368 ₹4,07,79,648 Lowest |
Tender Value
₹42.5 Cr
EMD Value
₹85.1 L
Closing Date
9 Feb 2025, 6:00 pmClosed
SM (Engg-C)-ER
O/o ED (Engg.)-ER NER, Old RD Building, Safdarjung Airport, New Delhi - 110003
Construction of Apron, Taxiways, GSE, Road (Air and City side) and other associated works (Phase-I) at Civil Enclave Purnea, Bihar
2025_AAI_224348_1
AAI/CHQ/Engg/Purnea/Apron/2025
Open Tender
Civil Works
Item Rate
120 days
Purnea Civil Enclave
As per NIT
17 documents required · 17 mandatory
₹5,900
₹85.1 L
8 Apr 2026
19 Jan 2025
11 Feb 2025
19 Jan 2025
9 Feb 2025
19 Jan 2025
19 Jan 2025 - 27 Jan 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator of 0.9 cum bucket capacity) in all kinds of soil including all types of rocks excluding hard rock over areas including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, transporting and unloading to the embankment/filling location within all lifts and lead upto 1000m. | 99,156 | cum | - | - |
| 2 | Banking excavated Earth/ordinary rock in layers not excceding 20 cm in depth, breaking clods, watering, rolling each layer with earth compactor/ vibratory roller of minimum 8-12 tonne capacity including leveling to the required grade and camber, dressing etc. in embankments to achieve desired density as per the direction of Enginner-in-charge. (a) All kinds of soil including ordinary rock. (As per MoRTH specifications) | 9,916 | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 cement : 4 coarse sand (zone-III): 8 graded stone aggregate 40 mm nominal size). | 234 | Cum | - | - |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for :Foundations, footings, bases for columns | 820.8 | Sqm | - | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 4,090 | Sqm | - | - |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level.:Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,12,080 | Kg | - | - |
| 7 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.
(i) All works upto plinth level
(a) Concrete of M35 grade with minimum cement content of 370 kg /cum. | 992 | cum | - | - |
| 8 | Preparation of granular sub-base by providing close graded material, conforming to specifications mixing in a mechanical mix plant at OMC, carriage of mixed material by mechanical transport to work site, for all leads and lifts, spreading in uniform layers of specified thickness with mechanical means including neatly leveling & dressing on prepared surface and compacting with vibratory power roller to achieve the desired density, complete and as per direction of Engineer-in-charge | 12,793 | cum | - | - |
| 9 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. | 10,809 | cum. | - | - |
| 10 | Construction of dry lean cement concrete sub base over a prepared subgrade with coarse and fine aggregate conforming to IS:383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per specifications, cement content not to be less than 150 Kg/cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, for all leads & lifts, laid with a mechanical paver, compacting with 8-10 tonne vibratory roller, finishing and curing etc. complete as per direction of Engineer-in-charge. | 9,336 | cum | - | - |
stage.html
html • 0.05 MB
techsummary_250802.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.16 MB
Tender_Document.pdf
Tender Documents • 22.33 MB
BOQ_250802.xls
BOQ • 0.37 MB
BOQ.xls
BOQ • 0.37 MB
Tenderdocument.pdf
Tender Documents • 22.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .