Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.7 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹19.9 L+₹1.2 L (6.45%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | R K Construction L2 | SWETHALAKSHMI ENGINEERING L1 |
|---|---|---|---|---|---|
| 1.00Attending leakages in Distribution system by Earthwork excavation for 2.50m length in all soils and refilling the same after completion of work, removal of burst PVC pipe for 1.00m length, De-watering to trench while attending leak or burst and handling mud etc.,. Replacing the burst or damaged PVC pipe to and averqage length of 1.00m with two nos, same dia coupling including labour for jointing the new pipes and specials with existing distribution works without further damage as directed by department. | |||||
| 1.10 | 90mm dia PVC Pipe | 100 | 1Job | 3,240 ₹3,24,000 | 2,920 ₹2,92,000 Lowest |
| 1.20 | 110mm dia PVC Pipe | 60 | 1Job | 3,740 ₹2,24,400 | 3,372 ₹2,02,320 Lowest |
| 1.30 | 140mm dia PVC Pipe | 10 | 1Job | 4,500 ₹45,000 | 4,056 ₹40,560 Lowest |
| 1.40 | 160mm dia PVC Pipe | 5 | 1Job | 5,090 ₹25,450 | 4,589 ₹22,945 Lowest |
| 1.50 | 150mm dia AC Pipe | 5 | 1Job | 4,115 ₹20,575 | 3,709 ₹18,545 Lowest |
| 1.60 | 200mm dia AC Pipe | 8 | 1Job | 11,350 ₹90,800 | 10,228 ₹81,824 Lowest |
| 1.70 | 250mm dia AC Pipe | 8 | 1Job | 23,780 ₹1,90,240 | 21,427 ₹1,71,416 Lowest |
| 1.80 | 300mm dia AC Pipe | 3 | 1Job | 31,120 ₹93,360 | 28,048 ₹84,144 Lowest |
| 1.90Cutting of road surface for pipeline trenches and disposing of the excavated materials as directed by the Engineer including barricading, Danger ligthing etc. | |||||
Tender Value
₹24.8 L
EMD Value
₹24,800
Closing Date
21 Sept 2026, 3:00 pmClosed
THE COMMISSIONER, SALEM CITY MUNICIPAL CORPORATION
Salem City Municipal Corporation, Fort Main Road, Salem.
Attending Leakages of water supply distribution system in Division No. 4, 5, 6, 7, 8, 12 and 13 at Hasthampatty Zone
2026_MAWS_701341_1
E2-EST NO-501-WS-2025-2026
Open Tender
Maintenance Works
Lump-sum
Salem City Municipal Corporation
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹24,800
23 Sept 2026
3 Sept 2026
21 Sept 2026
3 Sept 2026
21 Sept 2026
3 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Attending leakages in Distribution system by Earthwork excavation for 2.50m length in all soils and refilling the same after completion of work, removal of burst PVC pipe for 1.00m length, De-watering to trench while attending leak or burst and handling mud etc.,. Replacing the burst or damaged PVC pipe to and averqage length of 1.00m with two nos, same dia coupling including labour for jointing the new pipes and specials with existing distribution works without further damage as directed by department. | |||||
| 1.1 | 90mm dia PVC Pipe | 100 | 1Job | - | - |
| 1.2 | 110mm dia PVC Pipe | 60 | 1Job | - | - |
| 1.3 | 140mm dia PVC Pipe | 10 | 1Job | - | - |
| 1.4 | 160mm dia PVC Pipe | 5 | 1Job | - | - |
| 1.5 | 150mm dia AC Pipe | 5 | 1Job | - | - |
| 1.6 | 200mm dia AC Pipe | 8 | 1Job | - | - |
| 1.7 | 250mm dia AC Pipe | 8 | 1Job | - | - |
| 1.8 | 300mm dia AC Pipe | 3 | 1Job | - | - |
| 1.9 | Cutting of road surface for pipeline trenches and disposing of the excavated materials as directed by the Engineer including barricading, Danger ligthing etc. | - | - | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_843040.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .