Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹18.1 L
EMD Value
₹36,231
Closing Date
12 Oct 2026, 2:00 pm2d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer,PWD
Executive Engineer,PWD Chawkbazar, Hooghly
Restoration and Conservation of State Protected Monument - Shiva temple (Adkata Temple) at Bakharpur, P.S- Pursurah, Hooghly under Hooghly Construction Sub-Division No-I under Hooghly Construction Division (P.W.D) during the year 2026-27.
2026_WBPWD_5075961_2
WBPWD/EE/HCD/ NITe-17 of 2026-2027
Open Tender
CIVIL WORKS
Percentage
120 days
Hooghly
Please refer Tender documents.
4 documents required · 4 mandatory
₹36,231
Yes
28 Sept 2026
28 Sept 2026
14 Oct 2026
29 Sept 2026
12 Oct 2026
29 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 423.64 | Sqm | 17.6 | ₹7,456.06 |
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - Nominal concrete 1:3:6 or richer mix (including equivalent design mix) Plinth | 1.5 | Cum | 2,434.25 | ₹3,651.38 |
| 3 | Removing mortar from and cleaning stones and concrete articles.
In cement mortar
Ground Floor | 2.01 | Cum | 689.2 | ₹1,385.29 |
| 4 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
Inside
Ground Floor | 190.96 | Sqm | 54.65 | ₹10,435.96 |
| 4.01 | Out Side
Ground Floor | 174.16 | Sqm | 54.65 | ₹9,517.84 |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.
All kinds of soil
Depth of excavation not exceeding 1.500 mm. | 32.43 | Cum | 177.5 | ₹5,756.33 |
| 6 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 7.14 | Cum | 2,123.75 | ₹15,163.57 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Pakur Variety | 12.84 | Cum | 7,878.5 | ₹1,01,159.94 |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Pakur Variety | 2.07 | Cum | 8,340.85 | ₹17,265.56 |
| 9 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, Shuttering and finishing: 1:1½:3 (1 cement : 1½ coarse sand (zone-III) derivedfrom natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Pakur Variety | 3.36 | Cum | 10,357.55 | ₹34,801.37 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
Tendernotice_2.pdf
PDF • 0.51 MB
Tendernotice_3.pdf
PDF • 1.37 MB
BOQ_5168033.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .