| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹45.0 LAdmitted-Finance 27 19 F F D BLOCK CHATTARPUR EXTN SOUTH WEST DELHI DELHI 110075 | SOUTH WEST DELHI | DELHI | 110075 | +6.58% | ₹45.0 L | L1 | Admitted-Finance |
| 2 | L2₹45.1 LAdmitted-Finance | +6.10% | ₹45.1 L | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical AARA MACHINE WALL GALL MAHABIR PARK BAHADURGARH 124507 | BAHADURGARH | JHAJJAR | HARYANA | 124507 | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Kulwant Singh L1 | The Mahlawat Co-operative Labour & Construction Society Limited L2 |
|---|---|---|---|---|---|
| 1.00 | Providing and fixing precast RCC drain cover slab of size 36` x 18` x 4` factory made i/c the cost of Material and carriage in all aspects. | 400 | Nos. | 4,96,000 ₹4,96,000 Lowest | 5,20,000 ₹5,20,000 |
Tender Value
₹42.0 L
EMD Value
₹99,800
Closing Date
15 Jun 2026, 6:00 pmClosed
Pankaj Saini
Municipal Council Bhadurgarh
Construction of CC street and storm water drain in front of 8 Biswa Choupal in ward no. 14, Municipal Council, Bahadurgarh.
2026_HRY_527616_1
2026154DB000 8AFD 4BF5 A3D0 AB38D580DC6B293ULB
Open Tender
Civil Works
Works
210 days
Bahadurgarh
2 documents required · 2 mandatory
₹2,500
₹99,800
Yes
21 Aug 2026
8 Jun 2026
16 Jun 2026
8 Jun 2026
15 Jun 2026
8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [17.22.1]Water Bound Macadam Gr I 1. Water Bound Macadam Grading I (without screenings for low volume roads (undesignated)
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications [Through Rate] | 287.48 | cum | 1,038 | ₹2,98,404.24 |
| 2 | [17.5.3]Compacting Original Ground 3. Compaction of Earthwork
Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications [Through Rate] | 2,088.83 | Sqm | 7 | ₹14,621.81 |
| 3 | [17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate] | 769.24 | Sqm | 655 | ₹5,03,852.2 |
| 4 | [3.1.18]By Mechanical Transport including loading, unloading and stacking 18. Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead up to 10 km for all lifts, complete as per directions of Engineer-in-charge. [Rate] | 126.06 | cum | 202 | ₹25,464.12 |
| 5 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] | 260.46 | cum | 78 | ₹20,315.88 |
| 6 | [5.23.1]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 1. Nominal concrete 1:1.5:3 or richer mix (i/c equivalent design mix) [Through Rate] | 126.06 | cum | 1,287 | ₹1,62,239.22 |
| 7 | [6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 318.34 | cum | 3,975 | ₹12,65,401.5 |
| 8 | [6.1.7]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 7. 1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size) [Through Rate] | 23.88 | cum | 2,192 | ₹52,344.96 |
| 9 | [6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 78.79 | cum | 4,374 | ₹3,44,627.46 |
| 10 | [6.29.2]Centering and shuttering including strutting, propping etc. and removal of form work for : 2. Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. [Through Rate] | 1,234.31 | Sqm | 282 | ₹3,48,075.42 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_606605.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].