Loading…
Loading…
Tender Value
₹29.4 L
EMD Value
₹58,740
Closing Date
12 Sept 2026, 4:00 pm
xen,IFCD Sumbal
IRRIGATION COLONY SUMBAL
Paribal Nallah Construction of Crate protection work on Right Protection Bund at Preng near RD 4.420 KM for a length of 35 M
2026_IFC_322281_3
ENIT03OF2026-27
Open Tender
Civil Works
Percentage
30 days
Hajin
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
XENIFCDSUMBAL
₹58,740
25 Aug 2026
25 Aug 2026
14 Sept 2026
25 Aug 2026
12 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | 280 | Cum | 187.3 | ₹52,444 |
| 2 | Extra fo earth work in or under water / liquid mud including puming out water as required | 250.95 | Cum | 37.46 | ₹9,400.59 |
| 3 | Hand-packing stones in wire-crates; excluding cost of crates and stones | 524.79 | Cum | 371.15 | ₹1,94,775.81 |
| 4 | Dumping stones in Horizontal on level, excluding cost of stones. | 238.89 | cum | 237.9 | ₹56,831.93 |
| 5 | Supply of Quarry Stones | 763.08 | Sqm | 1,645 | ₹12,55,266.6 |
| 6 | Supply and Fixing of B.A Wire Knitted Crates of Mesh Size 100mm x 100mm with dia of wire 4 mm of approved made and make, including all sorts of carriages (manual/mechanical) upto the site of work, Complete job in all respects to the entire satisfaction of Engineer-in-Charge. | 23,879.45 | sft | 20 | ₹4,77,589 |
| 7 | Providing and Laying in Position Cement Concrete of Specified Grade including curing but excluding the cost of Centering and Shuttering, All work upto Plinth Level with, 1:2:4 (1 Cement :2 Coarse Sand : 4 Graded Stone Aggregate 20mm Nominal Size) | 6.3 | cum | 6,591.25 | ₹41,524.88 |
| 8 | Centering and Shuttering including Strutting, Propping etc and Removal of Formwork | 10.5 | Sqm | 286.35 | ₹3,006.68 |
| 9 | Providing, driving and installing poplar wood piles of standard quality of average girth of not less than 18” after removing bark, of specified length, (including the cost of wood, making of pointed tip, charges of all equipment’s required at site for pile driving, taxes, all sorts of carriages manual / mechanical, loading / unloading, etc.), complete job as per directions/satisfaction of E-in C. | 278.41 | CFt | 600 | ₹1,67,046 |
| 10 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 61 | Cum | 218.4 | ₹13,322.4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.44 MB
BOQ_1079757.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].