Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC WZ 1000 NANGAL RAYA PANKHA ROAD SOUTH WEST DELHI DELHI 110046 | DELHI | SOUTH WEST DELHI | DELHI | 110046 | ₹1.7 Cr Quoted ₹1.8 Cr | L1 | Accepted-AOC BEING THE LOWEST BIDDER |
| 2 | L2₹1.8 Cr+₹5.9 L (3.32%)Rejected-Finance 3788 SHAH GANJ GB ROAD NEW DELHI 110006 | NEW DELHI | DELHI | DELHI | 110006 | ₹1.8 Cr+₹5.9 L (3.32%) | L2 | Rejected-Finance BEING OTHER THAN THE LOWEST BIDDER |
| 3 | L3₹2.1 Cr+₹30.8 L (17.5%)Rejected-Finance 303 GHS 888 SECTOR 20 PANCHKULA 134116 HARYANA | PANCHKULA | PANCHKULA | HARYANA | 134116 | ₹2.1 Cr+₹30.8 L (17.5%) | L3 | Rejected-Finance BEING OTHER THAN THE LOWEST BIDDER |
| 4 | L4₹2.1 Cr+₹35.1 L (19.9%)Rejected-Finance | ₹2.1 Cr+₹35.1 L (19.9%) | L4 | Rejected-Finance BEING OTHER THAN THE LOWEST BIDDER |
| 5 | L5₹2.1 Cr+₹35.4 L (20.1%)Rejected-Finance | ₹2.1 Cr+₹35.4 L (20.1%) | L5 | Rejected-Finance BEING OTHER THAN THE LOWEST BIDDER |
| Sl No | Description | Qty | Unit | Parveen Builders H4 | mayur enterprises H8 | GUPTA ENGINEERING WORKS H1 | Commercial Traders H7 | SATISH AND CO H3 | M/s GANJOO AND CO H5 | R D Bansal H6 | P R Constructions H2 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling/uprooting of pre-stressed concrete/steel poles of any size and shape including taking out dismantled portion of poles embeded in ground after necessary demolition of concrete foundation and making good disturbed ground surface properly and disposal there off complete all as specified and directed. | 260 | Each | 500 ₹1,30,000 | 800 ₹2,08,000 | 500 ₹1,30,000 | 200 ₹52,000 | 150 ₹39,000 Lowest | 400 ₹1,04,000 | 400 ₹1,04,000 | 570 ₹1,48,200 |
| 2.00 | Dismantling cross arms of MS channel or angle sections etc. and removing unserviceable materials from the site complete all as specified and directed. | 7.43 | Qtl | 500 ₹3,715 | 100 ₹743 | 500 ₹3,715 | 500 ₹3,715 | 1,000 ₹7,430 | 100 ₹743 | 100 ₹743 | 99 ₹735.57 Lowest |
| 3.00 | Dismantling of ACSR conductors or disturbed span including line spacer and keeping serviceable materials in safe custody for re-use and removing unserviceable materials from the site complete all as specified and directed. | 27.65 | Qtl | 500 ₹13,825 | 100 ₹2,765 | 450 ₹12,442.5 | 1,800 ₹49,770 | 2,000 ₹55,300 | 200 ₹5,530 | 200 ₹5,530 | 99 ₹2,737.35 Lowest |
| 4.00 | Dismantling insulators of any type and removing unserviceable materials from the site complete all as specified and directed. | 675 | Each | 30 ₹20,250 | 5 ₹3,375 | 10 ₹6,750 | 2 ₹1,350 | 1 ₹675 Lowest | 5 ₹3,375 | 1 ₹675 Lowest | 19 ₹12,825 |
| 5.00 | Dismantling stay assembly of any size and removing unserviceable materials from the site (s), complete all as specified and directed.
a) Unserviceable stay assembly shall be taken off/dismantled at ground Level and making good disturbed ground surface.
b) Rate shall be inclusive of necessary earthwork for demolition of cement concrete complete. | 10 | Each set | 100 ₹1,000 Lowest | 100 ₹1,000 Lowest | 350 ₹3,500 | 100 ₹1,000 Lowest | 100 ₹1,000 Lowest | 400 ₹4,000 | 200 ₹2,000 | 119 ₹1,190 |
| 6.00 | Excavation in trenches for laying under ground cable, erection of poles and stays in any type of soil not exceeding 1.5 meter wide and not exceeding 1.5 meter deep and getting out complete all as specified and directed. | 4,228.2 | Cum | 200 ₹8,45,640 | 180 ₹7,61,076 | 195 ₹8,24,499 | 90 ₹3,80,538 Lowest | 180 ₹7,61,076 | 100 ₹4,22,820 | 100 ₹4,22,820 | 149 ₹6,30,001.8 |
| 7.00 | All as per Ser item No 06.00 here in before but depth exceeding 1.5 metre and not exceeding 3.0 metre complete all as specified and directed. | 28.08 | Cum | 200 ₹5,616 | 300 ₹8,424 | 350 ₹9,828 | 150 ₹4,212 Lowest | 195 ₹5,475.6 | 200 ₹5,616 | 200 ₹5,616 | 199 ₹5,587.92 |
| 8.00 | Returning, filling in including spreading, levelling, watering and well ramming in layers not exceeding 25 cm thick complete all as specified and directed. | 2,387.56 | Cum | 50 ₹1,19,378 | 20 ₹47,751.2 Lowest | 50 ₹1,19,378 | 25 ₹59,689 | 65 ₹1,55,191.4 | 30 ₹71,626.8 | 20 ₹47,751.2 Lowest | 99 ₹2,36,368.44 |
| 9.00 | Removing surplus excavated material to a distance not exceeding 50 meter above the starting point complete all as specified and directed. | 1,868.72 | Cum | 100 ₹1,86,872 | 20 ₹37,374.4 Lowest | 60 ₹1,12,123.2 | 30 ₹56,061.6 | 65 ₹1,21,466.8 | 30 ₹56,061.6 | 30 ₹56,061.6 | 109 ₹2,03,690.48 |
| 10.00 | Material and labour for sand cushioning to cable with a layer of sand 8 cm deep before laying the cable and 15 cms deep after laying the cable (punned down to 18 cms depth after laying and stretching of cable) complete all as specified and directed. | 1,184.22 | Cum | 700 ₹8,28,954 | 600 ₹7,10,532 | 900 ₹10,65,798 | 350 ₹4,14,477 Lowest | 700 ₹8,28,954 | 400 ₹4,73,688 | 900 ₹10,65,798 | 749 ₹8,86,980.78 |
Tender Value
₹2.4 Cr
EMD Value
₹3.2 L
Closing Date
16 Jun 2026, 6:00 pmClosed
Chief Engineer(AF) Nagpur
HQ CE (AF) Nagpur Vayusena Nagar Nagpur-07
CONVERSION OF OVERHEAD CABLE TO UG IN ADMIN AREA AND X AREA AT GURGAON UNDER GE AF GURGAON NO. 1
2026_MES_764879_1
801256/E8
Open Tender
Civil Works
Item Rate
270 days
GURGAON
For MES Enlisted Contractors- Class B Category b (i) For other Contractor meeting enlistment Criteria of MES for Class B Category b (i)
8 documents required · 8 mandatory
₹2,000
GE AF GURGAON NO. 1
₹3.2 L
Yes
HQ CE (AF) Nagpur
3 Aug 2026
12 May 2026
23 Jun 2026
12 May 2026
16 Jun 2026
2 Jun 2026
12 May 2026 - 19 May 2026
20 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling/uprooting of pre-stressed concrete/steel poles of any size and shape including taking out dismantled portion of poles embeded in ground after necessary demolition of concrete foundation and making good disturbed ground surface properly and disposal there off complete all as specified and directed. | 260 | Each | - | - |
| - | Dismantling cross arms of MS channel or angle sections etc. and removing unserviceable materials from the site complete all as specified and directed. | 7.43 | Qtl | - | - |
| - | Dismantling of ACSR conductors or disturbed span including line spacer and keeping serviceable materials in safe custody for re-use and removing unserviceable materials from the site complete all as specified and directed. | 27.65 | Qtl | - | - |
| - | Dismantling insulators of any type and removing unserviceable materials from the site complete all as specified and directed. | 675 | Each | - | - |
| - | Dismantling stay assembly of any size and removing unserviceable materials from the site (s), complete all as specified and directed.
a) Unserviceable stay assembly shall be taken off/dismantled at ground Level and making good disturbed ground surface.
b) Rate shall be inclusive of necessary earthwork for demolition of cement concrete complete. | 10 | Each set | - | - |
| - | Excavation in trenches for laying under ground cable, errection of poles and stays in any type of soil not exceeding 1.5 meter wide and not exceeding 1.5 meter deep and getting out complete all as specified and directed. | 4,228.2 | Cum | - | - |
| - | All as per Ser item No 06.00 here in before but depth exceeding 1.5 metre and not exceeding 3.0 metre complete all as specified and directed. | 28.08 | Cum | - | - |
| - | Returning, filling in including spreading, levelling, watering and well ramming in layers not exceeding 25 cm thick complete all as specified and directed. | 2,387.56 | Cum | - | - |
| - | Removing surplus excavated material to a distance not exceeding 50 meter above the starting point complete all as specified and directed. | 1,868.72 | Cum | - | - |
| - | Material and labour for sand cushioning to cable with a layer of sand 8 cm deep before laying the cable and 15 cms deep after laying the cable (punned down to 18 cms depth after laying and stretching of cable) complete all as specified and directed. | 1,184.22 | Cum | - | - |
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.88 MB
BOQ_856677.xls
BOQ • 0.35 MB
801256TENDERDOCUMENTS.pdf
Tender Documents • 1.02 MB
801256CORRIGENDUM03_0001.pdf
PDF • 0.06 MB
801256CORRIGENDUM02_0001.pdf
PDF • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .