Tender Value
₹43.1 L
EMD Value
₹86,200
Closing Date
19 May 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
TECHNICAL
3 conditions
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
1.This contract shall be governed by general condition of the contract & regulation of Engineering Department latest edition up to date. 2.The contractor should have valid electrical contractor licence. The contractor should submit copy of valid electrical contractor licence along with tender. Offer received without Electrical contractor licence, will be summarily rejected. 3.Offers recived from the firms, who are either working or completed Supply, Installation, Testing & Commissioning of lightening arrestor with earthing arrangement and associated electrical work with Govt. / Semi Govt. department shall only be entertained. 4.The firm should have permanent setup round the clock in Delhi area or any one location or Faridabad, Gurgaon, Noida, Kundli GZB and having contactable Mobile phone round the clock and transport. Firm shall change the office only after the prior information to the Competent Authority i.e. in this case Dy.CEE/PRS. 5.Firm shall submit the photograph of the workers for issuing the I. Card. The cost of the same shall be borne by the contractor. No staff shall be permitted to work without i.Card. 6.Permission to work shall be given as per the Railway's convenience. No claim for not giving the permission to work during the odd Hrs. will be accepted. 7.All work is to be carried out in the presence of Railway's representative. 8.Charges & expenses in respect of moving, Loading and Unloading the equipment or a part there of, if required by firm for repairing the equipment to their working place and back to Railway premises and including dismantling reinstallation, testing and commissioning shall be borne by firm. 9.Railway administration will not be responsible for any compensation to the firm's staff by any reasons what so ever. Contractor will ensure that the staff is fully insured for any liability in case of accident, strikes, riots, civil commotion etc. The Railway will not be liable for any damage caused due to any reason. 10.All disputes arising out of contracts will be subject to the jurisdiction of courts at Delhi. 11.The contractor shall make good all the repairs/modifications/damages before leaving the site. 12.The Tenderer shall not assign, transfer and sublet the privileges. Conferred under this agreement. 13.Railway can increase or decrease the quantity 25% of work on existing agreed terms and condition. 14.Cancellation of Contract: The Dy.CEE/PRS without prejudice can cancel the contract in any of the following condition. (a)The contractor or any partner in the contracting firm becoming insolvent or have a receiving order or orders for administration of estate made against him or shall take any proceeding for liquidation or compensation under any insolvency act for the time being in force or make any conveyance or assignment of this efforts or composition or arrangement for the benefit of his creditors or purpose to do so or if application be made under any insolvency act for the time being in force the sequestration of his estate or if a trust deed be granted by him on behalf of his creditors. (b)Assign, transfer, sublets or attempts to assign or sublet whole or any portion of the contract without written permission of the Dy.CEE/PRS. (c)Whenever Dy.CEE/PRS exercise his authority to cancel the contract under these conditions, he may complete the contract by any means at the contractor's risk and cost.
Replacement of old Earthing safety at PRS/UTS location over Delhi area and lightening arrestor at IRCA Building Bldng. New Delhi of Northern Railway."
150-Elect-CR-415R
150-Elect-CR-415R
Open
Works - General
6 Months
South West, Delhi
₹0
₹86,200
19 May 2026
24 Apr 2026
5 May 2026
17 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 43,09,946 | ||
| — | — | — | Above/ 1730824.00 Below/P | ||
| Supply, Fixing, Testing and commissioning of maintenance free chemical earthing electrode Copper rod 77mm dia3 meter long tested on short Circuit current 51Ka.Inner strip 50X6 mm terminal, terminal 50X6mm filled with highly conductive compound with the permanent sealed both end with 2 bag of BFC compound 25Kg highly water solubility acid solubility with the mixture of Silca arrangement as per IS,3043,IE rules and site requirements with confirming Section 7 of CPWD General specification for Electrical work Part IV substation 2013 with latest amendment. | — | 76.00 | — | — | |
| — | — | — | Above/ 2219322.00 Below/P | ||
| Supply of copper strip size 25X3mm confirming to IS-3043 with latest amendment as applicable, complete in all respect including connecting the earthing strip to equipment etc as per Section 7 of CPWD General specification for Electrical work Part IV substation 2013 with latest amendment. | — | 2991.00 | — | — | |
| — | — | — | Above/ 110000.00 Below/P | ||
| Supply Installation testing commissioning of Lightening arrestor manufactured from high quality stainless steel, Early steamer emission terminal release positive ions in to the atmosphere which attract the lighting emission, Stainless steel 316 with superior quality to avoid corrosion to comply Chapter 9 of CPWD General specification for Electrical work Part I Internal 2013 with latest amendment. | — | 2.00 | — | — | |
| — | — | — | Above/ 36000.00 Below/P | ||
| Supply installation of Pro LSC strike counter IP65, 6 Digit Analog Counter from 1 to 100 KA | — | 2.00 | — | — | |
| — | — | — | Above/ 44000.00 Below/P | ||
| Supply installation testing commissioning of earthing copper 50mm dia 3 meter long with 50 Kg bag bfc compound with confirming Section 7 of CPWD General specification for Electrical work Part IV substation 2013 with latest amendment. | — | 4.00 | — | — | |
| — | — | — | Above/ 36000.00 Below/P | ||
| Supply of G.I mast heavy duty having a total5 meter height either total GI or in combination of GI & FRP for mounting of air terminal with all required accessories like base plate, coupler, reducer, adapter, multistoried stray wires, joints, clamps etc as required. | — | 2.00 | — | — | |
| — | — | — | Above/ 124400.00 Below/P | ||
| Supply installation testing & commissioning of 70 sq mm (Single core) copper cable | — | 200.00 | — | — | |
| — | — | — | Above/ 9400.00 Below/P | ||
| Supply installation of rope wire, Fasteners & other Accessories as per requirement at site. | — | 2.00 | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
retendringEarthing.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .