| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹19.8 LAccepted-AOC MGM COLONY BAGDONA DISTRICT BETUL MADHYA PRADESH | BAGDONA | BETUL | MADHYA PRADESH | L-1 | Accepted-AOC Lowest Rate L-1 Bidder and Technically Acceptable. | |
| 2 | Rejected-Technical | - | Rejected-Technical Higher Rate L3 Bidder | |
| 3 | Rejected-Technical | - | Rejected-Technical Higher Rate L4 Bidder | |
| 4 | Rejected-Technical | - | Rejected-Technical Higher Rate L5 Bidder | |
| 5 | Rejected-Technical | - | Rejected-Technical Higher Rate L2 Bidder |
Tender Value
₹30.5 L
EMD Value
₹38,100
Closing Date
16 Feb 2024, 5:30 pmClosed
Staff Officer(ENM), Pathakhera Area.
Office of the SO(ENM), GM Office, WCL PKD Area.
Contractual work of Conversion of belt conveyors from 800mm to 1000mm, pipeline laying and withdrawal of old 800mm material from E0 E1 panel in UG at Chhatarpur Mine no. 1 of Pathakhera Area.
2024_WCL_300090_1
PK3550-ENM-0043-2023-24
Open Tender
Miscellaneous Works
Item Rate
120 days
Pathakhera Area, Distt.- Betul (M.P.)
Please refer tender documents.
3 documents required · 3 mandatory
₹38,100
5 Apr 2024
1 Feb 2024
19 Feb 2024
1 Feb 2024
16 Feb 2024
2 Feb 2024
1 Feb 2024 - 8 Feb 2024
Amount
Transportation of 1000mm size double Drive head with loop take up in UG up to lead of 100m at CHP-I Mine of PKD Area.
Installation of 1000mm size double drive head with loop take up in UG, at CHP-I Mine of PKD Area.
Dismantling and Transportation of 800mm size Double drum drive head with loop take up to lead of 100 m in UG of CHP-I Mine of PKD Area.
Transportation of 800 mm size single drive drum without loop take up to lead of 100 meter in UG of CHP-I Mine of PKD Area.
Installation of 800 mm size single drive head without loop take up in at Chp-I Mine of PKD Area.
Transportation of 1000 mm size Belt structure from track end to the site of installation up to lead of 100 m in UG of CHP-I Mine of PKD Area.
Installation of belt structure of 1000mm size in Chp-I Mine of PKD Area.
Change/laying of 1000mm PVC Belting on conveyor structure in UG at CHP-I Mine of PKD Area.
Transportation of PVC Belt 1000mm from surfacew to UG or one section to other saction in UG through haulages with tramming & pushing, coupling/uncoupling etc for a distanceevery 1.0km or part there of including loading, unloading & stacking the same at distination at CHP-I Mine of PKD Area.
Transportation of PVC Belt 800mm from surfacew to UG or one section to other saction in UG through haulages with tramming & pushing, coupling/uncoupling etc for a distanceevery 1.0km or part there of including loading, unloading & stacking the same at distination at CHP-I Mine of PKD Area.
Installation of tail end drum of belt 1000mm with drum base, tail end guard, side plate/loading bracket (chute), decking plates etc in UG (1st time0 including loading and transporting through haulages/pushing manually from surface to UG with a lead 1.0km and unloading at destination at Chp-I Mine of PKD Area.
Dismantling and Transportation of 800mm size belt structureincluding belting of length 100m from site to Track line up to lead 50m in UG at CHP-I Mine of PKD Area.
Transportation, Laying & Jointing of 3" (80mm) Pipeline standard length pipes (6.25m) from trackline to the site of installation up to lead of 50m.
Loading, Transportation and stacking of 800mm/1000mm size Belt Structure from Track end to the outside the panel in UG at CHP-I Mine of PKD Area.
Total impact of GST for the purpose of CTC
S.B. ENTERPRISES
AV GROUP MINING AND CIVIL CONSTRUCTION
IMTEYAZ AHMAD
M/s DUBEY AND SONS
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .