Tender Value
Refer Docs
Closing Date
18 Mar 2022, 4:00 pmClosed
CE PHE Water Assam
Hengrabari, Guwahati-36
Pkg 10 Fixation of Rates for different items required for execution of Mini Piped Water Supply Schemes to be implemented under various divisions under Hailakandi Circle of PHE Department under Jal Jeevan Mission Assam
2022_PHED_24494_10
PHE_19_JJM_PB_21_22_T_29006_12
Open Tender
Civil Works - Water Works
Item Rate
All Assam
Please refer Tender documents.
1 document required · 1 mandatory
₹0
Exempted
24 Jun 2022
25 Feb 2022
19 Mar 2022
25 Feb 2022
18 Mar 2022
25 Feb 2022
Amount
1. Construction of ESR of different capacities for a minimum 70 kN/sqm SBC of soil (SBC is to be determined as per a separate item) with RCC staging of 12 m height including earthwork in excavation for foundation including refilling (return filling) the quantity as necessary after completion of work; RCC works; plastering, painting; underdrainage works in filter beds; placing the filter materials in two rapid gravity sand filters; construction of aeration system; various pipes, e.g. inlet, outlet, overflow pipes, wash water pipes, vent pipe and sluice valves as required; aviation lamp; lightening arrestor; MS ladder; all formworks including cantering, shuttering, scaffolding; all materials and labour as per approved drawings and specifications all complete as directed in the jurisdiction of different divisions of PHED, Assam with the following main components: 1) Aeration System at 10 m level. 2) Gravity type Rapid Sand Filter with 1 working and 1 stand by bed at 3 m level. 3) Pump House at the Ground Floor. 4) Water tank made of food grade virgin Plastic (ISI marked) at 12 m level conforming to IS 12701: 1996 1.A.10,000 litres Water tank Capacity.
1.B. 15,000 litres Water tank Capacity
2. Construction of ESR of different capacities for a minimum 70 kN/sqm SBC of soil (SBC is to be determined as per a separate item) with MS staging of 10 m height including earthwork in excavation for foundation including refilling (return filling) the quantity as necessary after completion of work; RCC works in foundation; various pipes, e.g. inlet, outlet, overflow pipes, vent pipe and sluice valves as required; aviation lamp; lightening arrestor; MS ladder; all formworks including cantering, shuttering, scaffolding; all materials and labour as per approved drawings and specifications all complete as directed in the jurisdiction of different divisions of PHED, Assam. 2A. 5,000 Litres Water tank Capacity
2B. 10,000 litres Water tank Capacity
3. Construction of RCC under ground reservoir of various capacities by excavating necessary earthwork, including dewatering if necessary, stabilising side earth, preparation of sub soil etc. with PCC; using M30 grade of concrete with use of admixtures; water proofing compound; plastering and painting; inlet, outlet pipes, vent pipe and other pipe connections; all formworks including cantering, shuttering, scaffolding; all materials and labour as per approved drawings and specifications all complete as directed in the jurisdiction of different divisions of PHED, Assam for storage of treated drinking water as per approved drawings and specifications. 3A. 5,000 Litres
3B. 10,000 Litres
4. Supply, installation, testing and commissioning of standalone water purification plant of FRP with different capacities solar pump set fitted with tube well, capable of removing specified contaminants along with bacteriological disinfection (by chlorine dosing system) from the raw water bringing the filtered water quality as per the acceptable limits of IS: 10500:2012 including 3 (three) months trial run and 33 (thirty-three) months operation and maintenance after the trial run under PHED of Assam. The work broadly comprises of supply, installation, testing and commissioning of standalone community water purification of BLDC motor based solar pump set fitted with existing well and pressure filter having specified filtration rate. The plant will be aided by photovoltaic submersible solar pumps within the bore well with a specified minimum yield. The plant is capable to work on specified solar energy (PV panel), lithium-ion batteries which are to be installed. The lithium-ion battery shall be capable of providing a minimum of 2 hours backup. Filtration process technology shall require approval by CSIR-IMMT or NEERI with complete test report. 4A. Two stage treatment (i) Solar pump capacity: 0.5 HP DC submersible type (ii) Contaminant: maximum level of contamination of iron 5 ppm (iii) Filtration rate of pressure filter: not less than 1,000 litres/hours (iv) Yield of tube well: not less than 5,000 litres/day with 5 hours working period (v) Solar panel and battery: 670 Wp (335 Wp – 2 No.) lithium-ion battery of 96 V-24 Ah of required numbers for 2 (two) hours backup
4B. 'Two stage treatment (i) Solar pump capacity: 1.0 HP DC submersible type (ii) Contaminant: maximum level of contamination of iron 5 ppm (iii) Filtration rate of pressure filter: not less than 2,000 litres/hours (iv) Yield of tube well: not less than 10,000 litres/day with 5 hours working period (v) Solar panel and battery: 1005 Wp (335 Wp – 3 No.) lithium-ion battery of 96 V-24 Ah of required numbers for 2 (two) hours backup
4C. Two stage treatment (i) Solar pump capacity: 1.5 HP DC submersible type (ii) Contaminant: maximum level of contamination of iron 5 ppm (iii) Filtration rate of pressure filter: not less than 3,000 litres/hours (iv) Yield of tube well: not less than 15,000 litres/day with 5 hours working period (v) Solar panel and battery: 1340 Wp (335 Wp – 4 No.) lithium-ion battery of 96 V-24 Ah of required numbers for 2 (two) hours backup
4D. 'Three stage treatment (i) Solar pump capacity: 0.5 HP DC submersible type (ii) Contaminant: maximum level of contamination of iron 5 ppm and arsenic 2.0 ppm (iii) Filtration rate of pressure filter: not less than 1,000 litres/hours (iv) Yield of tube well: not less than 5,000 litres/day with 5 hours working period (v) Solar panel and battery: 670 Wp (335 Wp – 2 No.) lithium-ion battery of 96 V-24 Ah of required numbers for 2 (two) hours backup
4E. 'Three stage treatment (i) Solar pump capacity: 1.0 HP DC submersible type (ii) Contaminant: maximum level of contamination of iron 5 ppm and arsenic 2.0 ppm (iii) Filtration rate of pressure filter: not less than 2,000 litres/hours (iv) Yield of tube well: not less than 10,000 litres/day with 5 hours working period (v) Solar panel and battery: 1005 Wp (335 Wp – 3 No.) lithium-ion battery of 96 V-24 Ah of required numbers for 2 (two) hours backup
4F. Three stage treatment (i) Solar pump capacity: 1.5 HP DC submersible type (ii) Contaminant: maximum level of contamination of iron 5 ppm and arsenic 2.0 ppm (iii) Filtration rate of pressure filter: not less than 3,000 litres/hours (iv) Yield of tube well: not less than 15,000 litres/day with 5 hours working period (v) Solar panel and battery: 1340 Wp (335 Wp – 4 No.) lithium-ion battery of 96 V-24 Ah of required numbers for 2 (two) hours backup
4G. Three stage treatment (i) Solar pump capacity: 0.5 HP DC submersible type (ii) Contaminant: maximum level of contamination of iron 5 ppm and fluoride 20.0 ppm (iii) Filtration rate of pressure filter: not less than 1,000 litres/hours (iv) Yield of tube well: not less than 5,000 litres/day with 5 hours working period (v) Solar panel and battery: 670 Wp (335 Wp – 2 No.) lithium-ion battery of 96 V-24 Ah of required numbers for 2 (two) hours backup
4H. Three stage treatment (i) Solar pump capacity: 1.0 HP DC submersible type (ii) Contaminant: maximum level of contamination of iron 5 ppm and fluoride 20.0 ppm (iii) Filtration rate of pressure filter: not less than 2,000 litres/hours (iv) Yield of tube well: not less than 10,000 litres/day with 5 hours working period (v) Solar panel and battery: 1005 Wp (335 Wp – 3 No.) lithium-ion battery of 96 V-24 Ah of required numbers for 2 (two) hours backup
4I. 'Three stage treatment (i) Solar pump capacity: 1.5 HP DC submersible type (ii) Contaminant: maximum level of contamination of iron 5 ppm and fluoride 20.0 ppm (iii) Filtration rate of pressure filter: not less than 3,000 litres/hours (iv) Yield of tube well: not less than 15,000 litres/day with 5 hours working period (v) Solar panel and battery: 1340 Wp (335 Wp – 4 No.) lithium-ion battery of 96 V-24 Ah of required numbers for 2 (two) hours backup
5. Supply, installation, testing and commissioning of standalone water purification plant with specified single phase electric submersible pump set coupled with wet type submersible electric motor drive of adequate power suitable for operation at 230 V, 50 Hz fitted with tube well, capable of removing specified contaminant along with bacteriological disinfection (by Chlorine dosing system) from the raw water bringing the filtered water quality as per the acceptable limits of IS: 10500:2012 including 3 (three) months trial run and 33 (thirty-three) months operation and maintenance after the trial run under PHED of Assam. The work broadly comprises of supply, installation, testing and commissioning of standalone community water purification plant fitted with existing well and pressure filter having specified filtration rate. The submersible pump placed within the bore well shall be of specified minimum yield. Filtration process technology shall require approval by CSIR-IMMT or NEERI with complete test report. 5A. '(i) AC pump capacity: 0.5 HP single phase submersible type (pump of make Crompton Greaves/Acquatic/CRI/GEC/V-Guard or equivalent) (ii) Contaminant: maximum level of contamination of iron 5 ppm (iii) Filtration rate of pressure filter: not less than 1,000 litres/hours (iv) Yield of tube well: not less than 5,000 litres/day with 5 hours working period
5B. (i) AC pump capacity: 1.0 HP single phase submersible type (pump of make Crompton Greaves/Acquatic/CRI/GEC/V-Guard or equivalent) (ii) Contaminant: maximum level of contamination of iron 5 ppm (iii) Filtration rate of pressure filter: not less than 2,000 litres/hours (iv) Yield of tube well: not less than 10,000 litres/day with 5 hours working period
5C. '(i) AC pump capacity: 1.5 HP single phase submersible type (pump of make Crompton Greaves/Acquatic/CRI/GEC/V-Guard or equivalent) (ii) Contaminant: maximum level of contamination of iron 5 ppm (iii) Filtration rate of pressure filter: not less than 3,000 litres/hours (iv) Yield of tube well: not less than 15,000 litres/day with 5 hours working period
5D. '(i) AC pump capacity: 0.5 HP single phase submersible type (pump of make Crompton Greaves/Acquatic/CRI/GEC/V-Guard or equivalent) (ii) Contaminant: maximum level of contamination of iron 5 ppm and arsenic 2.0 ppm (iii) Filtration rate of pressure filter: not less than 1,000 litres/hours (iv) Yield of tube well: not less than 5,000 litres/day with 5 hours working period
5E. '(i) AC pump capacity: 1.0 HP single phase submersible type (pump of make Crompton Greaves/Acquatic/CRI/GEC/V-Guard or equivalent) (ii) Contaminant: maximum level of contamination of iron 5 ppm and arsenic 2.0 ppm (iii) Filtration rate of pressure filter: not less than 2,000 litres/hours (iv) Yield of tube well: not less than 10,000 litres/day with 5 hours working period
5F. (i) AC pump capacity: 1.5 HP single phase submersible type (pump of make Crompton Greaves/Acquatic/CRI/GEC/V-Guard or equivalent) (ii) Contaminant: maximum level of contamination of iron 5 ppm and arsenic 2.0 ppm (iii) Filtration rate of pressure filter: not less than 3,000 litres/hours (iv) Yield of tube well: not less than 15,000 litres/day with 5 hours working period
5G. (i) AC pump capacity: 0.5 HP single phase submersible type (pump of make Crompton Greaves/Acquatic/CRI/GEC/V-Guard or equivalent) (ii) Contaminant: maximum level of contamination of iron 5 ppm and fluoride 20.0 ppm (iii) Filtration rate of pressure filter: not less than 1,000 litres/hours (iv) Yield of tube well: not less than 5,000 litres/day with 5 hours working period
5H. '(i) AC pump capacity: 1.0 HP single phase submersible type (pump of make Crompton Greaves/Acquatic/CRI/GEC/V-Guard or equivalent) (ii) Contaminant: maximum level of contamination of iron 5 ppm and fluoride 20.0 ppm (iii) Filtration rate of pressure filter: not less than 2,000 litres/hours (iv) Yield of tube well: not less than 10,000 litres/day with 5 hours working period
5I. '(i) AC pump capacity: 1.5 HP single phase submersible type (pump of make Crompton Greaves/Acquatic/CRI/GEC/V-Guard or equivalent) (ii) Contaminant: maximum level of contamination of iron 5 ppm and fluoride 20.0 ppm (iii) Filtration rate of pressure filter: not less than 3,000 litres/hours (iv) Yield of tube well: not less than 15,000 litres/day with 5 hours working period
6. Providing, installation and commissioning of 100 mm dia deep tube well by hand boring within the jurisdiction of different divisions of PHED, Assam including preparation of site, drilling the DTW including extraction of drill pipes etc, lowering, fitting, fixing 100 mm diameter UPVC pipe assembly comprising of strainer, pipes and cone in potable water bearing strata, washing the bore well etc., supplying necessary jointing materials, developing the DTW with air compressor Make- Kirloskar / Cumins/ or equivalent for a period of 12 hours and supplying and packing pea gravel of size 3 mm to 10 mm around the periphery of casing including screening washing etc. all complete as directed for maximum 80 m depth
7. Odex : Providing installation and commissioning of 200 mm dia DTW by Odex boring with 8 mm thickness 200 mm dia MS pipe (Best quality) within the jurisdiction of different PHE divisions including preparation of site for placing of drilling rig, air compressor, transportation of rig and ancillary equipments. Construction of temporary accommodation and low cost sanitary facility for drilling staff and providing water supply facilities at drilling site. Drilling of bore well by using drilling rig having ODEX system including welding of pipe joints. Developing of the D.T.W. with air compressor, Make- Kirloskar / Cumins all complete as directed by the department.
BAHARUL ISLAM MOZUMDER
Dochania and Company Private Limited
Bhrigujit Choudhury
ZSEE SMART SOLUTION INDIA PRIVATE LIMITED
Sri Uday Baishya
Haren Mahanta
M/S A K ENTERPRISE
SWAPNA BEGUM BARBHUIYA
GOPANKA PATHAK
MS MH ENTERPRISE PVT LTD
IMRAN HUSSAIN BARBHUIYA
CMPLUS POWER & INFRA PVT. LTD.
SUNINDIA POWER AND INFRA LLP
Jaharlal Chakravarty
BIJIT BRAHMA
ALTAF HUSSAIN CHOUDHURY
ABDUL RAHMAN LASKAR
PADMAVATI CONSTRUCTION
MINUFA KHANAM
Nazim Uddin Laskar
HARADHAN KUNDU
SAHAJAMAL
ABUL HUSSAIN SODIAL
M S P and B ENTERPRISE
Altaf Hussain Laskar
ASHIQUE AHMED
M/S SURMA ENTERPRISE
MASADDAR ALI
M/s Macrocosm Builders
AHM SAHARUJ ZAMAN LASKAR
SUHEL AHMED
JALAL UDDIN BARBHUIYA
MUSTAQUE AHMED LASKAR
DHRUBAJYOTI BORGOHAIN
atw india pvt ltd
Landmark Engineering
M/S STAR ENTERPRISE
KAMAL UDDIN BARBHUIYA
M/S Sumon Construction
ASHOK PAUL
SALIM UDDIN
ASAN UDDIN
FOKRUL ISLAM MAZUMDER
ZIAUR RAHMAN BARBHUIYA
MD RAMIZ AHMED
MOHAMMED NIZAM UDDIN
Abdullah Barbhuiya
Dynamic Engineers and Company
JAKIR HUSSAIN BEIG
KHALIL UDDIN BARBHUIYA
SATHI ENTERPRISE
RAUNAQ CONSTRUCTION
JABIR HUSSAIN TAPADAR
KAZI MD BADRUZZAMAN
LEGACY CONSULTANCY PVT. LTD
MOHAMMAD KHALID AHMED
M/S D.K. (ASSAM) ASSOCIATES PVT. LTD.
SHAMSUL ALAM TAPADAR
Mrinal Jyoti das
Diganta Kumar Medhi
Mourya Enterprise
JAIDEV BUILDERS
AFZAL HUSSAIN BARBHUIYA
RANJAN DAS
MOHIT AMIN BARBHUIYA
DILWAR HUSSAIN
Riju Ahmed
MONJUR AHMED
ZAKIR HUSSAIN
ALIM AKRAM
SAFRUL ISLAM
HABU UDDIN TAPADAR
HUSSAIN AHMED CHOUDHURY
FAKAR UDDIN LASKAR
SNEHANGSHU DAS
JAYNUL HAQUE
M/S ENGINEERS SYNDICATE
YUNUS CHOUDHURY
MASHUD AHMED
TAHIR HUSSAIN BARBHUIYA
FAKRUL ISLAM
ABDULLAH AL AMAN CHOUDHURY
BISWAJIT DAS
ABUL KASHIM MAZUMDER
NAHAR ALOM CHOUDHURY
SUFIAN AHMED CHOUDHURY
HUSSAIN AHMED CHOUDHURY
SABRINA YEASMIN LASKAR
KALIM UDDIN
DEBASISH CHOUDHURY
Debadib Das
JOHIRUL ISLAM TAPADAR
YUSUBUR RAHMAN
BIRAJ DAS
AZMAL HUSSAIN BARBHUIYA
M/S M.R. ENTERPRISE
BAHARUL ISLAM LASKAR
M/S R.S. ENTERPRISE
SABBIR AHMED LASKAR
RAHUL SARKAR
NURUL ISLAM
IQBAL AHMED
A K MULTI TRADERS
ABDUL MANNAN
BAHARUL ISLAM MAZUMDER
SAMIM AKHTER CHOUDHURY
M/S- ARMAAN AND ASSOCIATES
HANIF AHMED CHOUDHURY
R F CONSTRUCTION and CONSULTANCY
AHABAB AHMED TAPADAR
MAHAMMED AZAHAR UDDIN
Rohit Construction
K.T. ASSOCIATES
DILWAR HUSSAIN LASKAR
NACHIR UDDIN LASKAR
AHKAR HUSSAIN
TAHIR AHMED LASKAR
RAJ ENTERPRISE
M/S MA LAKSHMI INDUSTRIES
SSK INDUSTRIES
HI-Tech Water Solutions Pvt. Ltd
ASHOK KUMAR BAJAJ
M/S ANAND
Safikur Rahman
M/S SATYAJIT ELECTRICALS
Md. Baharul Islam Talukdar
BIMAL SINHA
NEKIBUR ZAMAN AHMED
Bidyut Das
MOHAMMED SHAMIM AHMED
HASSAN AHMED BARBHUIYA
PRADIP INFO ENTERTAINMENT PVT LTD
R D Water System Pvt. Ltd
R S PROJECTS
Subhra Baran Dasgupta
BISHNU SHARMA
M/S ASSAM VARITIES
SHAKIR HUSSAIN LASKAR
ANAMUL ISLAM CHOUDHURY
KANIKA DEB
BINNI CONSTRUCTION PVT LTD
BINNI CONSTRUCTION
CHIRANJEEV DEY
KALYANI NATH MAZUMDER
ABUL BASHAR
ABDUL JALIL
SAHIDA BEGOM MIRA
M/S A.R.INTERNATIONAL
BIJOY SANKAR GOALA
SHAHRUL ALAM
ARIF AHMED LASKAR
JAYNUL KARIM
ANIMA SINHA
HUSSAIN AHMED
GULEH AHMED BARBHUIYA
MATIUR RAHMAN BARBHUIYA
ABBAS UDDIN CHOUDHURY
SHORAB HUSSAIN BARBHUIYA
Shamim Ahmed Mazumdar
AKTAR HUSSAIN BARBHUIYA
MONIR UDDIN
DEBASISH BHOWMIK
MONJUR AHMED
UTTAM KUMAR SINHA
KAMRUL ISLAM
MD JAKIR HUSSAIN
ABDUL KAYUM LASKAR
DILWAR HUSSAIN MAZUMDER
HRISHIKESH SINHA
AKECON INDIA
KAYRUZZAMAN MAZARBHUIYA
KALPANA BEGUM
MONAJ SUTRADHAR
Alam Uddin Laskar
Taher Ahmed Siddiquey
AF Sahab Uddin
ABDUL KAYUM CHOUDHURY
MAMUN AL RASHID
BHARAT SALIA
ASZAD HUSSAIN
PULAK ROY
FUAD UDDIN
SIRAJ UDDIN
BRAHMAPUTRA CONSTRUCTIONS
Aquasolution
M/S East India Construction
M/S DHB MULTIPURPOSE ENGINEERING ENTERPRISE
Badrul Islam Barbhuiya
ALOK KUMAR SINGH
SULEKHA DEVI
PAWAN KUMAR SINGH
UMESHWAR ROY
SAMRAT BUILDTECH (INDIA) PRIVATE LIMITED
PRABHASH KUMAR SINGH
Bikash Enterprises
Granth Associates
SHREE ANANT UDYOG
TRIDIP RANJAN DUTTA
Mastaque Ahmed
Faruk Ahmed Mazumder
Arun Enterprise
Luit Construction
Sanjib Bhattacharjee
aaravii
KESHAB PURKAYASTHA
SOUMITRA DAS
MK Plastic
TACENT INDUSTRIES PRIVATE LIMITED
PCI Wires Pvt Ltd (Formerly Power Cable Industries)
Shree Raghu Sales Corporation
Step Industries Pvt Ltd
Progressive Enterprises
SARAWGI AND SONS
Rania Technovations
Sarawgi Infracon Private Limited
Power Tools & Engineering
Power Tools and Engineering
KRISHNA ENGINEERINGS
NAGENDRA BAGIRI
SAIFULLA MOHAMMAD KHALID
KAMAKHYA ENTERPRISE
Bidder Name
Sri Uday Baishya
BAHARUL ISLAM MOZUMDER
Dochania and Company Private Limited
M/ S H A M Enterprise
Haren Mahanta
stage.html
html • 0.69 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .