Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.4 LAccepted-AOC 0 BHUJAULI SISWA BAZAR MAHARAJGANJ MAHARAJGANJ UTTAR PRADESH 273163 | MAHARAJGANJ | UTTAR PRADESH | 273163 | L1 | Accepted-AOC L1 | |
| 2 | L2₹32.1 L+₹1.7 L (5.63%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹33.2 L+₹2.8 L (9.28%)Rejected-AOC 0 VILLAGE AND POST BAMROLI AHEER THANA MALPURA AGRA UTTAR PRADESH 282009 | AGRA | UTTAR PRADESH | 282009 | L3 | Rejected-AOC L3 | |
| 4 | Rejected-Technical 0 | - | Rejected-Technical DISQUALIFY |
| Sl No | Description | Qty | Unit | SWASTIK CONSTRUCTION L1 | AASHTA CONSTRUCTION L2 | BHOOPENDRA SINGH CONTRACTOR L3 |
|---|---|---|---|---|---|---|
| 1.00 | Cleaning Thick Bushes & Throny Jungle without uprooting jhunds including all cost of labour and T&P etc.Complete. | 7,090 | Sqm | 3.96 ₹28,076.4 Lowest | 4.4 ₹31,196 | 4 ₹28,360 |
| 2.00 | Uprooting Jhunds with its disposal including all cost of labour and T&P etc.Complete. | 335 | Nos | 31.5 ₹10,552.5 Lowest | 35 ₹11,725 | 33 ₹11,055 |
| 3.00 | Earth work in excavation in foundation in all type of soil including cost of all lead, lift,, labour and T&P etc. | 105.15 | Cum | 90 ₹9,463.5 Lowest | 100 ₹10,515 | 98 ₹10,304.7 |
| 4.00 | Providing and Laying C.C M-10 (1:3:6) including cost of all material, labour and T&P etc. | 10 | Cum | 4,569.3 ₹45,693 Lowest | 5,077.25 ₹50,772.5 | 5,060 ₹50,600 |
| 5.00 | Providing and Laying Ist Class Brick Work in 1:4 C:M i/c. all cost of matrial, labour and T&P etc. | 14.6 | Cum | 4,994.1 ₹72,913.86 Lowest | 5,549 ₹81,015.4 | 5,545 ₹80,957 |
| 6.00 | 12 mm thick Cement Plaster 1:4 C:M including all cost of material, labour and T&P etc. | 275.05 | Sqm | 169.2 ₹46,538.46 Lowest | 188.4 ₹51,819.42 | 187 ₹51,434.35 |
| 7.00 | Providing and Laying R.C.C 1:1.5:3 (M-25) including all cost of material, labour and T&P etc. | 60.31 | Cum | 6,191.1 ₹3,73,385.24 Lowest | 6,879.65 ₹4,14,911.69 | 6,877 ₹4,14,751.87 |
| 8.00 | Providing Centering and shuttering for R.C.C work with fine ply or steel including cost of all material labour and T&P etc. | 1,011.42 | Sqm | 724.5 ₹7,32,773.79 | 640 ₹6,47,308.8 Lowest | 804 ₹8,13,181.68 |
| 9.00 | Supplying & fixing Steel Rainforcement (Fe-500) for RCC work i/c cost of steel binding wire, binding cutting and placing in position including all cost of material, labour and T&P etc. | 11.14 | MT | 65,848.5 ₹7,33,552.29 Lowest | 73,165 ₹8,15,058.1 | 73,162 ₹8,15,024.68 |
| 10.00 | Ready made coloured cement paint in two coat on new surface including primer coat i/c all cost of material, labour and T&P etc. | 1,161.72 | Sqm | 68.4 ₹79,461.65 Lowest | 76 ₹88,290.72 | 75 ₹87,129 |
Tender Value
₹33.8 L
EMD Value
₹68,000
Closing Date
4 Jul 2026, 2:00 pmClosed
EE N.D.G.C, Roorkee
Office of the E.E, N.D.G.C, Roorkee
Construction of boundary walls on the R and L/B of the UGC between km 32.320 and km 33.796 under the project to construct boundary walls at various locations within the jurisdiction of the NDGC,Rke in HRD,aimed at protecting the State Gov.valuable
2026_UPIDC_1164238_4
01/EE/2026-27
Open Tender
Civil Works
Item Rate
120 days
ROORKEE HARIDWAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹68,000
23 Jul 2026
29 Jun 2026
6 Jul 2026
29 Jun 2026
4 Jul 2026
29 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning Thick Bushes & Throny Jungle without uprooting jhunds including all cost of labour and T&P etc.Complete. | 7,090 | Sqm | - | - |
| 2 | Uprooting Jhunds with its disposal including all cost of labour and T&P etc.Complete. | 335 | Nos | - | - |
| 3 | Earth work in excavation in foundation in all type of soil including cost of all lead, lift,, labour and T&P etc. | 105.15 | Cum | - | - |
| 4 | Providing and Laying C.C M-10 (1:3:6) including cost of all material, labour and T&P etc. | 10 | Cum | - | - |
| 5 | Providing and Laying Ist Class Brick Work in 1:4 C:M i/c. all cost of matrial, labour and T&P etc. | 14.6 | Cum | - | - |
| 6 | 12 mm thick Cement Plaster 1:4 C:M including all cost of material, labour and T&P etc. | 275.05 | Sqm | - | - |
| 7 | Providing and Laying R.C.C 1:1.5:3 (M-25) including all cost of material, labour and T&P etc. | 60.31 | Cum | - | - |
| 8 | Providing Centering and shuttering for R.C.C work with fine ply or steel including cost of all material labour and T&P etc. | 1,011.42 | Sqm | - | - |
| 9 | Supplying & fixing Steel Rainforcement (Fe-500) for RCC work i/c cost of steel binding wire, binding cutting and placing in position including all cost of material, labour and T&P etc. | 11.14 | MT | - | - |
| 10 | Ready made coloured cement paint in two coat on new surface including primer coat i/c all cost of material, labour and T&P etc. | 1,161.72 | Sqm | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.60 MB
BOQ_2182867.xls
BOQ • 0.29 MB
FinalBOOKLATE.pdf
Tender Documents • 16.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .