Loading…
Loading…
Updated dates
Tender Value
₹346.3 Cr
EMD Value
₹3.6 Cr
Closing Date
15 Apr 2026, 3:55 pmClosed
superintending engineer
office of the superintending engineer circle office up jal nigam rural moradabad
Prevention of Pollution of River Ramganga by Interception Diversion of Drains of MBD Z3 Z4 with STP other Appurtenant works at MBD city in UP State under Namami Gange including 15Y Operation Maintenance period under Hybrid Annuity Based PPP Mode
2025_UPJNG_1094715_1
967/NIVIDA/26 dt 28.11.2025
Open Tender
Civil Works - Others
Moradabad
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3.6 Cr
SE office Moradabad
1 Dec 2025
1 Dec 2025
15 Apr 2026
1 Dec 2025
15 Apr 2026
1 Dec 2025
1 Dec 2025 - 15 Dec 2025
11 Dec 2025
A - Zone-3
A.1 - Zone-3 - 15 MLD STP at Buddhi Vihar Sector-9 Moradabad
A.1.1 - Bid Project Cost for 15 MLD STP at Buddhi Vihar Sector-9 Moradabad (Capex Part)
A.1.2 - O&M charges (Non-Power) 15 MLD STP at Buddhi Vihar Sector-9 Moradabad for first month after Zone-3 COD
A.1.3 - Guaranteed Energy Consumption (GEC) for 15 MLD STP at Buddhi Vihar Sector-9 Moradabad for first month after Zone-3 COD (Value should be entered in all cell from A.1.3.1 to A.1.3.6 (The permissible value of maximum to minimum GEC quoted in cell A.1.3.1 to A.1.3.6 should be less than or equal to 1.5 ) [in case of power sourcing from other power plant of third party, adjusted GEC to be quoted as per RFP clause 20.1(q)(iii)]
A.1.3.1 - Flow ≤ 10 MLD and BOD < 175 mg/L (35% Weightage)
A.1.3.2 - Flow < 10 MLD and BOD between 176 mg/l and 250 mg/l (10% Weightage)
A.1.3.3 - Flow < 10 MLD and BOD >250 mg/l (5% Weightage)
A.1.3.4 - Flow > 10 MLD and BOD <175 mg/l (35% Weightage)
A.1.3.5 - Flow > 10 MLD and BOD between 176 mg/l and 250 mg/l (10% Weightage)
A.1.3.6 - Flow > 10 MLD and BOD > 250 mg/L (5% Weightage)
A.1.3.7 - STP Weighted Average GEC
A.1.3.8 - Power Charges 15 MLD STP at Buddhi Vihar Sector-9 Moradabad at Zone-3 (= 15 MLD X Units Consumed/MLD X 5475 X 8.50 X 1.25) (Not to be filled by the Bidder)
A.1.4 - Land requirement (sqm) - 15 MLD STP site at Buddhi Vihar Sector-9 Moradabad (Circle rate is Rs 39000 per sq.m.) (Bidder is required to quote the land requirement under column 5 of this row subject to lavailable land i.e. 16000 sqm)
A.2 - Zone-3 - 15 MLD STP at Buddhi Vihar Sector-9 Moradabad Associated Infrastructure
A.2.2 - O&M charges (Non-Power) for 15 MLD STP at Buddhi Vihar Sector-9 Moradabad Associated Infrastructure for first month after Zone-3 COD
A.2.3 - Associated Infra Guaranteed Energy Consumption for 32 MLD MPS at Buddhi Vihar Sector-9 Moradabad for first month after zone-3 COD ( 32 MLD MPS x Units Consumed/ MLD x 5475 x 8.50 x 1.25)) [in case of power sourcing from other power plant of third party, adjusted GEC to be quoted as per RFP clause 20.1(q)(iii)]
A.3 - Gross & Captive Power Generation at Zone-3 Facilities - For information Purpose
B - ZONE-4
B.1 - ZONE-4 - 65 MLD STP at Sehora Govind Village near Delhi Global public school Moradabad
B.1.2 - O&M charges (Non-Power) for 65 MLD STP at Sehora Govind Village near Delhi Global public school Moradabad for first month after ZONE-4 COD
B.1.3 - Guaranteed Energy Consumption for 65 MLD STP at Sehora Govind Village near Delhi Global public school Moradabad for first month after Zone-4 COD (Value should be entered in all cell from B.1.3.1 to B.1.3.4 (The permissible value of maximum to minimum GEC quoted in cell B.1.3.1 to B.1.3.4 should be less than or equal to 1.5) [in case of power sourcing from other power plant of third party, adjusted GEC to be quoted as per RFP clause 20.1(q)(iii)]
A.1.3.1 - Flow ≤ 45 MLD and BOD < 175 mg/L (35% Weightage)
A.1.3.2 - Flow < 45 MLD and BOD between 176 mg/l and 250 mg/l (10% Weightage)
A.1.3.3 - Flow < 45 MLD and BOD >250 mg/l (5% Weightage)
A.1.3.4 - Flow > 45 MLD and BOD <175 mg/l (35% Weightage)
A.1.3.5 - Flow > 45 MLD and BOD between 176 mg/l and 250 mg/l (10% Weightage)
A.1.3.6 - Flow > 45 MLD and BOD > 250 mg/L (5% Weightage)
B.1.3.5 - STP Average GEC
B.1.3.6 - Power Charges for 65 MLD STP at Sehora Govind Village near Delhi Global public school Moradabad (= 65 MLD X Units Consumed/MLD X 5475 X 8.50 X 1.25) (Not to be filled by the Bidder)
B.1.4 - Land requirement (sqm) - 65 MLD STP site at Sehora Govind Village near Delhi Global public school Moradabad (Circle rate is Rs. 4670 per sq.m.) (Bidder is required to quote the land requirement under column 5 of this row subject to lavailable land i.e.16990 sqm)
B.2 - ZONE-4 - for 65 MLD STP at Sehora Govind Village near Delhi Global public school Moradabad Associated Infrastructure
B.2.1 - Bid Project Cost for 65 MLD STP at Sehora Govind Village near Delhi Global public school Moradabad Associated Infrastructure (Capex Part)
B.2.2 - O&M charges for 65 MLD STP at Sehora Govind Village near Delhi Global public school Moradabad Associated Infrastructure for first month after ZONE-4 COD
B.2.3 - Associated Infra Guaranteed Energy Consumption for 65 MLD MPS at Sehora Govind Village near Delhi Global public school Moradabad (65 MLD MPS x Units Consumed/ MLD x 5475 x 8.50x 1.25) [in case of power sourcing from other power plant of third party, adjusted GEC to be quoted as per RFP clause 20.1(q)(iii)]
B.3 - Gross & Captive Power Generation at ZONE-4 Facilities - For information Purpose
B.3.1 - Capacity of onlsite captive Solar Power Plant, if proposed
B.3.2 - Average Power Generation from Solar Power Plant, if proposed
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.92 MB
Zone3and4additiondocument.rar
Additional Documents • 15.74 MB
RFPMBD.pdf
Tender Documents • 1.27 MB
BOQ_2013198.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid