| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹228.4 CrAdmitted-Finance | ₹228.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹235.2 Cr+₹6.8 Cr (2.98%)Admitted-Finance RG METRO ARCADE SECTOR 11 ROHINI DELHI 110085 | DELHI | NORTH WEST DELHI | DELHI | 110085 | ₹235.2 Cr+₹6.8 Cr (2.98%) | L2 | Admitted-Finance |
| 3 | L3₹248.8 Cr+₹20.4 Cr (8.95%)Admitted-Finance | ₹248.8 Cr+₹20.4 Cr (8.95%) | L3 | Admitted-Finance |
| 4 | L4₹255.9 Cr+₹27.5 Cr (12.0%)Admitted-Finance 807 PEARL BUSINESS PARK NETAJI SUBHASH PLACE PITAMPURA DELHI | DELHI | DELHI | ₹255.9 Cr+₹27.5 Cr (12.0%) | L4 | Admitted-Finance |
| 5 | L5₹285.4 Cr+₹57.0 Cr (25.0%)Admitted-Finance PLOT NO 61 KESHAV NAGAR HAWA SADAK JAIPUR RAJASTHAN 302006 | JAIPUR | RAJASTHAN | 302006 | ₹285.4 Cr+₹57.0 Cr (25.0%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GA Infra Private Limited L5 | BNC POWER PROJECTS LTD. L6 | Lahoty Buildcon Limited L1 | ENVIRO INFRA ENGINEERS LIMITED L2 | PULKIT PROJECTS PVT. LTD. L4 | VISHVARAJ ENVIRONMENT LIMITED L7 | EAST INDIA UDYOG LIMITED L3 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00A - Zone-3 | ||||||||||
| 2.00A.1 - Zone-3 - 15 MLD STP at Buddhi Vihar Sector-9 Moradabad | ||||||||||
| 3.00 | A.1.1 - Bid Project Cost for 15 MLD STP at Buddhi Vihar Sector-9 Moradabad (Capex Part) | 1 | Each | 41,00,00,000 ₹41,00,00,000 | 46,24,00,000 ₹46,24,00,000 | 22,50,00,000 ₹22,50,00,000 Lowest | 35,00,00,000 ₹35,00,00,000 | 30,00,00,000 ₹30,00,00,000 | 54,64,73,141 ₹54,64,73,141 | 34,63,89,783.71 ₹34,63,89,783.71 |
| 4.00 | A.1.2 - O&M charges (Non-Power) 15 MLD STP at Buddhi Vihar Sector-9 Moradabad for first month after Zone-3 COD | 180 | INR/Month | 11,43,240 ₹20,57,83,200 | 7,88,890 ₹14,20,00,200 | 3,60,000 ₹6,48,00,000 Lowest | 5,60,000 ₹10,08,00,000 | 4,80,000 ₹8,64,00,000 | 8,30,706.43 ₹14,95,27,157.4 | 5,54,707.85 ₹9,98,47,413 |
| 5.00A.1.3 - Guaranteed Energy Consumption (GEC) for 15 MLD STP at Buddhi Vihar Sector-9 Moradabad for first month after Zone-3 COD (Value should be entered in all cell from A.1.3.1 to A.1.3.6 (The permissible value of maximum to minimum GEC quoted in cell A.1.3.1 to A.1.3.6 should be less than or equal to 1.5 ) [in case of power sourcing from other power plant of third party, adjusted GEC to be quoted as per RFP clause 20.1(q)(iii)] | ||||||||||
| 6.00 | A.1.3.1 - Flow ≤ 10 MLD and BOD < 175 mg/L (35% Weightage) | 0.35 | kWh/MLD | 0.9 ₹0.32 Lowest | 89.22 ₹31.23 | 22 ₹7.7 | 40 ₹14 | 46 ₹16.1 | 69.11 ₹24.19 | 104.13 ₹36.45 |
| 7.00 | A.1.3.2 - Flow < 10 MLD and BOD between 176 mg/l and 250 mg/l (10% Weightage) | 0.1 | kWh/MLD | 0.9 ₹0.09 Lowest | 110.12 ₹11.01 | 22 ₹2.2 | 40 ₹4 | 68.67 ₹6.87 | 69.11 ₹6.91 | 159.13 ₹15.91 |
| 8.00 | A.1.3.3 - Flow < 10 MLD and BOD >250 mg/l (5% Weightage) | 0.05 | kWh/MLD | 0.9 ₹0.05 Lowest | 124.24 ₹6.21 | 22 ₹1.1 | 40 ₹2 | 68.67 ₹3.43 | 69.11 ₹3.46 | 184.13 ₹9.21 |
| 9.00 | A.1.3.4 - Flow > 10 MLD and BOD <175 mg/l (35% Weightage) | 0.35 | kWh/MLD | 0.9 - Lowest | 89.22 - | 22 - | 60 - | 46 - | 103.57 - | 89.43 - |
| 10.00 | A.1.3.5 - Flow > 10 MLD and BOD between 176 mg/l and 250 mg/l (10% Weightage) | 0.1 | kWh/MLD | 0.9 - Lowest | 110.12 - | 22 - | 40 - | 68.67 - | 69.11 - | 144.43 - |
Tender Value
₹346.3 Cr
EMD Value
₹3.6 Cr
Closing Date
15 Apr 2026, 3:55 pmClosed
superintending engineer
office of the superintending engineer circle office up jal nigam rural moradabad
Prevention of Pollution of River Ramganga by Interception Diversion of Drains of MBD Z3 Z4 with STP other Appurtenant works at MBD city in UP State under Namami Gange including 15Y Operation Maintenance period under Hybrid Annuity Based PPP Mode
2025_UPJNG_1094715_1
967/NIVIDA/26 dt 28.11.2025
Open Tender
Civil Works - Others
Turn-key
Moradabad
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3.6 Cr
SE office Moradabad
5 Sept 2026
1 Dec 2025
15 Apr 2026
1 Dec 2025
15 Apr 2026
1 Dec 2025
1 Dec 2025 - 15 Dec 2025
11 Dec 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | A - Zone-3 | - | - | - | - |
| 2 | A.1 - Zone-3 - 15 MLD STP at Buddhi Vihar Sector-9 Moradabad | - | - | - | - |
| 3 | A.1.1 - Bid Project Cost for 15 MLD STP at Buddhi Vihar Sector-9 Moradabad (Capex Part) | 1 | Each | 100 | ₹100 |
| 4 | A.1.2 - O&M charges (Non-Power) 15 MLD STP at Buddhi Vihar Sector-9 Moradabad for first month after Zone-3 COD | 180 | INR/Month | 10 | ₹1,800 |
| 5 | A.1.3 - Guaranteed Energy Consumption (GEC) for 15 MLD STP at Buddhi Vihar Sector-9 Moradabad for first month after Zone-3 COD (Value should be entered in all cell from A.1.3.1 to A.1.3.6 (The permissible value of maximum to minimum GEC quoted in cell A.1.3.1 to A.1.3.6 should be less than or equal to 1.5 )
[in case of power sourcing from other power plant of third party, adjusted GEC to be quoted as per RFP clause 20.1(q)(iii)] | - | - | - | - |
| 6 | A.1.3.1 - Flow ≤ 10 MLD and BOD < 175 mg/L (35% Weightage) | 0.35 | kWh/MLD | 10 | ₹3.5 |
| 7 | A.1.3.2 - Flow < 10 MLD and BOD between 176 mg/l and 250 mg/l (10% Weightage) | 0.1 | kWh/MLD | 10 | ₹1 |
| 8 | A.1.3.3 - Flow < 10 MLD and BOD >250 mg/l (5% Weightage) | 0.05 | kWh/MLD | 10 | ₹0.5 |
| 9 | A.1.3.4 - Flow > 10 MLD and BOD <175 mg/l (35% Weightage) | 0.35 | kWh/MLD | - | - |
| 10 | A.1.3.5 - Flow > 10 MLD and BOD between 176 mg/l and 250 mg/l (10% Weightage) | 0.1 | kWh/MLD | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.92 MB
Zone3and4additiondocument.rar
Additional Documents • 15.74 MB
RFPMBD.pdf
Tender Documents • 1.27 MB
BOQ_2013198.xls
BOQ • 0.30 MB
corrigendum11.pdf
PDF • 0.81 MB
corrig11.pdf
PDF • 4.02 MB
Zone3n4corrigendum10.pdf
PDF • 0.43 MB
corri9.pdf
PDF • 2.95 MB
ReplyofprebidqueriesZ3Z4.pdf
PDF • 19.23 MB
corrigendum8Z3Z4.pdf
PDF • 1.34 MB
revisedboqcorregendum.rar
PDF • 1.41 MB
corrigendum7.pdf
PDF • 0.42 MB
corrigendum6.pdf
PDF • 0.43 MB
corrigendum5.pdf
PDF • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .