| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50.3 LAccepted-AOC 10 RUPANA ROAD 127046 | ₹50.3 L | L1 | Accepted-AOC ok |
| 2 | L2₹54.8 LRejected-Finance | ₹54.8 L | L2 | Rejected-Finance higher bid |
| 3 | L3₹56.2 LRejected-Finance | ₹56.2 L | L3 | Rejected-Finance higher bid |
| 4 | Rejected-Technical VPO SARSANA DISTT HISAR 125001 | HATHRAS | UTTAR PRADESH | 202150 | - | - | Rejected-Technical similar nature of works not found |
| 5 | Rejected-Technical | - | - | Rejected-Technical similar nature of works not found |
Tender Value
₹62.9 L
EMD Value
₹1.3 L
Closing Date
25 Dec 2025, 5:00 pmClosed
BHUPENDER SINGH
DIV 2 Hissar
Rough Cost Estimate for restoration of the cement concrete Road from Bus stand Chowk to Kranti Chowk (upto railway crossing) dismantled during the laying of Storm water line by PHED in Mandi Adampur
2025_HBC_491648_1
2025AE652444 7539 408E A5F9 109552578B83260HSV
Open Tender
Civil Works
120 days
ADAMPUR
Construction of Cement Concrete road by providing, laying and compaction of 200mm thick CC pavement over a base of 200mm thick GSB, 200mm DLC and construction of brick masonry SWD chambers
2 documents required · 2 mandatory
₹2,000
Yes
₹1.3 L
Yes
19 Mar 2026
19 Dec 2025
26 Dec 2025
19 Dec 2025
25 Dec 2025
19 Dec 2025
[17.6]Construction of Embankment with Material obtained from Borrow pits NA Construction of Embankment CBR 8% (for new road/ raising/ berms/ etc.) with approved material obtained from borrow pits, including compensation of earth with all lead and lift transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications. [Through Rate]
[17.15.3]Granular Sub-Base with Coarse Graded Material - Grading-I or II or III (Table:- 400-2) Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.of MORTandH specifications 3. Grading III material [Through Rate]
[17.44]Dry Lean Cement Concrete Sub- base Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing, as per clause 601 of MORT&H specifications [Through Rate]
[21.84.1]Constructing brick masonry inspection Chamber sizes as given below up to 0.60 metre average depth in cement mortar 1:5 lime concrete with 40 per cent lime mortar 2:3 in foundation cement concrete 1:2:4 benching 12mm thick cement plaster 1:2 with a floating coat of 1 mm thick of neat cement R.C.C. 1:2:4 slab 100 mm thick/cement concrete topping, 50mm thick with 455mmx455mm / 455mm x610mm inside light duty C.I. inspection chamber cover and frame weight as per I.S.I. specification painted with 3 coats of black bitumastic superior paint complete as per standard design. 1. Size 450 mm X450 mm inside (with 455 mm x 455 mm cover and frame light duty single seal weighing 20 kg with C.C. topping [Through Rate]
[4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. [Through Rate]
[3.1.18]By Mechanical Transport including loading, unloading and stacking 18. Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead up to 10 km for all lifts, complete as per directions of Engineer-in-charge. [Rate]
[9.57.3]Providing and fixing on wall face Unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. 3. 150 mm diameter [Through Rate]
[17.45]Cement Concrete Pavement Construction of un-reinforced M-40 grade concrete pavement with dowel jointed, over a prepared sub base with 43 grade OPC cement concrete coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a fully computerised batching and mixing plant as per approved mix design, transported to site in transit mixer with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing, complete as per clause 602 of MORT&H specifications. [Through Rate]
[10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate]
[5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) [Through Rate]
[6.34.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more. [Through Rate]
[6.57]Providing and filling in position bitumen mix filler of proportion 80 kg. of hot bitumen, 1 kg. of cement and 0.25 cubic metre of coarse sand for expansion joints. [Through Rate]
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
BOQ_569971.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid