Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-Finance HIMACHAL PRADESH HP | HAMIRPUR | HIMACHAL PRADESH | 174304 | L1 | Accepted-Finance L1 | |
| 2 | L2₹7.7 L+₹65,064.82 (9.23%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹7.8 L+₹75,019.22 (10.6%)Rejected-Finance JOGINDER NAGAR | SHAHID BHAGAT SINGH NAGAR | PUNJAB | 144509 | L3 | Rejected-Finance L3 | |
| 4 | L4₹8.7 L+₹1.7 L (23.9%)Rejected-Finance R O VILL GARH P O BARRAM TEHSIL JAISINGHPUR DISTT KANGRA H P | KANGRA | HIMACHAL PRADESH | 175013 | L4 | Rejected-Finance L4 | |
| 5 | L5₹8.8 L+₹1.7 L (24.6%)Rejected-Finance TEHSIL BHARMOUR DISTRICT CHAMBA HIMACHAL PRADESH | CHAMBA | HIMACHAL PRADESH | 176207 | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | Danish Ali Shah L6 | ROHIT PARIHAN L8 | Anoop Kumar L5 | Santosh Chouhan L2 | Ashwani Kumar L4 | Vijay Kumar L1 | DEEPAK KUMAR L3 | KARAM SINGH SHASTRI L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation, trenches etc. in all kinds of soil such as pick work, jumper work, blasting work in soft / hard rock, chiselling in soft / hard including wedging out of a rock where blasting is prohibited including dewatering in saturated soil and stacking the excavated earth/metarials upto all leads and lifts up to all lifts, not exceeding more than 3.0mtr. clear from the edge of excavation and then returning the stacked soil in 15 centimeters layers when required in to plinths, sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as per direction and to the entire satisfation of Engineer- in- charge up to leads and lifts. | 1,398.26 | Per Cum. | 415 ₹5,80,277.9 | 565 ₹7,90,016.9 | 496 ₹6,93,536.96 | 410 ₹5,73,286.6 | 495 ₹6,92,138.7 | 353 ₹4,93,585.78 Lowest | 400 ₹5,59,304 | 520 ₹7,27,095.2 |
| 2.00Laying and jointing of galvanised mild steel tube fitting light grade tube (Earth work in trenches to be measured and paid for separately) including all carriage of materials with in all leads and lifts as per the direction of Engineer-in-Charge | |||||||||||
| 2.10 | 25 mm dia Nominal bore | 3,590 | Per Rmt. | 55 ₹1,97,450 | 40 ₹1,43,600 | 25 ₹89,750 Lowest | 28 ₹1,00,520 | 25 ₹89,750 Lowest | 28 ₹1,00,520 | 34 ₹1,22,060 | 35 ₹1,25,650 |
| 2.20 | 15 mm dia Nominal bore | 3,315 | Per Rmt. | 33 ₹1,09,395 | 28 ₹92,820 | 20 ₹66,300 | 20 ₹66,300 | 19 ₹62,985 Lowest | 24 ₹79,560 | 21 ₹69,615 | 30 ₹99,450 |
| 3.00Dismentalling of old GI pipes complete of the following nominal bore with all leads and lifts as per the direction of Engineer-in-charge | |||||||||||
| 3.10 | 20 mm dia Nominal bore | 230 | Per Rmt. | 20 ₹4,600 | 22 ₹5,060 | 17 ₹3,910 | 18 ₹4,140 | 15 ₹3,450 Lowest | 18 ₹4,140 | 15 ₹3,450 Lowest | 20 ₹4,600 |
| 3.20 | 25 mm dia Nominal bore | 850 | Per Rmt. | 30 ₹25,500 | 31 ₹26,350 | 20 ₹17,000 Lowest | 20 ₹17,000 Lowest | 20 ₹17,000 Lowest | 22 ₹18,700 | 23 ₹19,550 | 25 ₹21,250 |
| 4.00Relaying and jointing of galvanised mild steel tube fitting light grade tube (Earth work in trenches to be measured and paid for separately) including all carriage of materials with in all leads and lifts as per the direction of Engineer-in-Charge | |||||||||||
| 4.10 | 20 mm dia Nominal bore | 69 | Per Rmt. | 19 ₹1,311 | 22 ₹1,518 | 22 ₹1,518 | 25 ₹1,725 | 22 ₹1,518 | 24 ₹1,656 | 18 ₹1,242 Lowest | 35 ₹2,415 |
| 4.20 | 25 mm dia Nominal bore | 255 | Per Rmt. | 28 ₹7,140 | 35 ₹8,925 | 25 ₹6,375 | 28 ₹7,140 | 25 ₹6,375 | 27 ₹6,885 | 19 ₹4,845 Lowest | 40 ₹10,200 |
Tender Value
Refer Docs
EMD Value
₹23,697
Closing Date
27 Aug 2026, 5:00 pmClosed
EE Jal Shakti Division Chamba
EE Jal Shakti Division Chamba
Excavation, laying, jointing and testing of GI pipe 25mm dia part-I (1860 rmt at various RD, part-II (1350 rmt at various RD) and part-III (380 rmt) for distribution system, Dismentalling and re-laying of GI pipe 25mm dia and 20mm dia at various RD
2026_HPIPH_141583_1
EE-JSV-Tender-2026-7510-7560 dated 20.08.2026
Open Tender
Civil Works - Water Works
Item Rate
90 days
Chamba
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
₹23,697
24 Sept 2026
20 Aug 2026
28 Aug 2026
20 Aug 2026
27 Aug 2026
20 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation, trenches etc. in all kinds of soil such as pick work, jumper work, blasting work in soft / hard rock, chiselling in soft / hard including wedging out of a rock where blasting is prohibited including dewatering in saturated soil and stacking the excavated earth/metarials upto all leads and lifts up to all lifts, not exceeding more than 3.0mtr. clear from the edge of excavation and then returning the stacked soil in 15 centimeters layers when required in to plinths, sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as per direction and to the entire satisfation of Engineer- in- charge up to leads and lifts. | 1,398.26 | Per Cum. | - | - |
| 2Laying and jointing of galvanised mild steel tube fitting light grade tube (Earth work in trenches to be measured and paid for separately) including all carriage of materials with in all leads and lifts as per the direction of Engineer-in-Charge | |||||
| 2.1 | 25 mm dia Nominal bore | 3,590 | Per Rmt. | - | - |
| 2.2 | 15 mm dia Nominal bore | 3,315 | Per Rmt. | - | - |
| 3Dismentalling of old GI pipes complete of the following nominal bore with all leads and lifts as per the direction of Engineer-in-charge | |||||
| 3.1 | 20 mm dia Nominal bore | 230 | Per Rmt. | - | - |
| 3.2 | 25 mm dia Nominal bore | 850 | Per Rmt. | - | - |
| 4Relaying and jointing of galvanised mild steel tube fitting light grade tube (Earth work in trenches to be measured and paid for separately) including all carriage of materials with in all leads and lifts as per the direction of Engineer-in-Charge | |||||
| 4.1 | 20 mm dia Nominal bore | 69 | Per Rmt. | - | - |
| 4.2 | 25 mm dia Nominal bore | 255 | Per Rmt. | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.79 MB
Form6.pdf
Tender Documents • 0.41 MB
Form8.pdf
Tender Documents • 1.49 MB
BOQ_210172.xls
BOQ • 0.29 MB
conditions.pdf
Additional Documents • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .