| Sl No | Description | Qty | Unit | VIJAY CONSTRUCTION L1 | REAL TECH BRICKS & PAVERS L2 |
|---|---|---|---|---|---|
| 1.01 | Preparing the Existing surface to laying the road to Proper Gradient and remove the loosesoilwithout damage the Water Supply andother Pipe lines. TheRate inclusiveof all charges such as Earth work and remove the same away from the site etc, complete as per standard specifications. | 202.5 | m3 | 92.5 ₹18,731.40 | 97.39 ₹19,720.52 |
| 2.01 | Providing and laying, spreading and compacting 0.396m3 of 45-22.40mm & 0.528m3 of 22.40-2.36mm & 0.396m3 of 2.36mm and below metal stone aggregate to Wet Mix Macadam (WMM) specification including premix the materials with water at OMC in machanical mix plant carriage to mixed materials by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clause 406 of MORTH specifications. | 162 | m3 | 2,645.74 ₹4.3 L | 2,785.44 ₹4.5 L |
| 3.01 | Providing and laying Prime coat of 7.00kgs/10 sqm over the WMM surface treated with primer using using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as prime coat manually etc., complete as per 502 of MORTH Rev V Specifications | 1,620 | m2 | 87.34 ₹1.4 L | 91.95 ₹1.5 L |
| 4.01 | Providing and laying tack coat of 2.50kgs/10 sqm over the prime surface treated with binter using 2.50 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications | 1,620 | m2 | 19.74 ₹31,975.60 | 20.78 ₹33,664.08 |
| 5.01 | Providing and laying tack coat of 2 Kg / 10sqm over the BT surface treated with binder using 2.5Kgs of bituminous Emulsion for 10 sqm area including cost of bituminuous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 specifications | 6,480 | m2 | 29.25 ₹1.9 L | 30.79 ₹2.0 L |
| 6.01 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm , 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP Site heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix Plant 20-30 ton capacity , conveying the mix by tipper trucks to work site , spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross section and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30ton CMP with Bitumen Boiler, Tipper trucks, Paver finisher / 9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required , including fuel and all other inciddntal charges etc., complete as per specification using CMP clause 505 MORTH Rev-5 | 405 | m3 | 10,880.91 ₹44.1 L | 11,455.48 ₹46.4 L |
| 7.01 | Providing and laying Bituminous Concrete to 50 mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50 - 2.36 mm and 0.26 cum of 2.36 and below with 50.30 Kgs of VG30/VG40 bitumen for premixing per 10 Sqm. including cost and conveyance of all materials to CMP site, heatingthe bitumen and aggregate to required temperature and mixing them in required temperature and mixing them in required temperature in Central hot mix plant 20-30 Ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 Tonne Vibratory/Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 T CMP with bitumen boiler, tipper trucks, paver finisher/9mm paver finisher/Vibratory/Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORT Rev. 5. | 243 | m3 | 11,443.86 ₹27.8 L | 12,048.15 ₹29.3 L |
| 8.01 | Road marking with hot applied thermoplastic compound with reflect rising glass beadsdon Bituminous surface Providing and laying of hot applied thermoplastic compound 205mm thick including reflect rising glassbeads @ 250gms.per sqm area thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level uniform and free from streadks sdand hole setc complete.(as per MORT&H Specification no 803) Hot applied thermoplastic compound | 203 | m2 | 889.91 ₹1.8 L | 936.9 ₹1.9 L |
| 40.01 | Sub Total | 1 | LS | 0 ₹81.8 L | 0 ₹86.1 L |
| 41.01 | GST 18% | 1 | GST | 0 ₹14.7 L | 0 ₹15.5 L |
Updated dates
Tender Value
₹96.5 L
EMD Value
₹96,517
Closing Date
28 Jan 2026, 3:00 pmClosed
The Commissioner Madurai Corporation
Aringar Anna Maligai,Thallakulam, Madurai.
Renewal of BT Road NETHAJI 2ND STREET 115095R06723 AmaithiSolai Main Street 115095S2154 PARASAKTHI STREET 115095S2155 Vetri Vinayagar Street 115095S2156 AmaithiSolai Main Street 115095S2181 AmaithiSolai 1st East Street 115095S2182
2026_MAWS_643162_1
E1/000361/TURIP/Pack-65/25-26
Open Tender
Civil Works
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹96,517
Aringar Anna Maligai
18 Feb 2026
13 Jan 2026
28 Jan 2026
13 Jan 2026
28 Jan 2026
13 Jan 2026
14 Jan 2026
Preparing the Existing surface to laying the road to Proper Gradient and remove the loosesoilwithout damage the Water Supply andother Pipe lines. TheRate inclusiveof all charges such as Earth work and remove the same away from the site etc, complete as per standard specifications.
Providing and laying, spreading and compacting 0.396m3 of 45-22.40mm & 0.528m3 of 22.40-2.36mm & 0.396m3 of 2.36mm and below metal stone aggregate to Wet Mix Macadam (WMM) specification including premix the materials with water at OMC in machanical mix plant carriage to mixed materials by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clause 406 of MORTH specifications.
Providing and laying Prime coat of 7.00kgs/10 sqm over the WMM surface treated with primer using using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as prime coat manually etc., complete as per 502 of MORTH Rev V Specifications
Providing and laying tack coat of 2.50kgs/10 sqm over the prime surface treated with binter using 2.50 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications
Providing and laying tack coat of 2 Kg / 10sqm over the BT surface treated with binder using 2.5Kgs of bituminous Emulsion for 10 sqm area including cost of bituminuous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 specifications
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm , 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP Site heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix Plant 20-30 ton capacity , conveying the mix by tipper trucks to work site , spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross section and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30ton CMP with Bitumen Boiler, Tipper trucks, Paver finisher / 9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required , including fuel and all other inciddntal charges etc., complete as per specification using CMP clause 505 MORTH Rev-5
Providing and laying Bituminous Concrete to 50 mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50 - 2.36 mm and 0.26 cum of 2.36 and below with 50.30 Kgs of VG30/VG40 bitumen for premixing per 10 Sqm. including cost and conveyance of all materials to CMP site, heatingthe bitumen and aggregate to required temperature and mixing them in required temperature and mixing them in required temperature in Central hot mix plant 20-30 Ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 Tonne Vibratory/Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 T CMP with bitumen boiler, tipper trucks, paver finisher/9mm paver finisher/Vibratory/Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORT Rev. 5.
Road marking with hot applied thermoplastic compound with reflect rising glass beadsdon Bituminous surface Providing and laying of hot applied thermoplastic compound 205mm thick including reflect rising glassbeads @ 250gms.per sqm area thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level uniform and free from streadks sdand hole setc complete.(as per MORT&H Specification no 803) Hot applied thermoplastic compound
Sub Total
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
P65.pdf
Tender Documents • 0.78 MB
BOQ_770640.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid