Executive Engineer.P.W.North Division Pune-1
Executive Engineer.P.W.North Division Pune-1
(1)Improvement and Widening of Malwadi Harnus Kambre Male Bhutonde Balwad Pasali Singapore Road (MDR 43), Km. 0/00 to 15/00, Taluka Bhor, Dist. Pune (For Pune Grand Tour Challenge 2027) and other 7 works
2026_PWDRP_1319178_1
Southpune/2026-27/18
Open Tender
Civil Works - Roads
Item Rate
120 days
Bhor
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,540
₹40.8 L
Chief Engineer P.W.REGION PUNE on 20.7.2026 at 12.
18 Jul 2026
18 Jul 2026
3 Aug 2026
18 Jul 2026
1 Aug 2026
18 Jul 2026
20 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 50 metre outside the periphery of the area . | 29,000 | One Square Metre | - | - |
| 2 | Excavation for roadway in earth soil of all sorts, sand, gravel or soft murum including dressing section to the required grade camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. | 790 | One Cubic Metre | - | - |
| 3 | Excavation for roadway in hard murum and boulder including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. | 3,160 | One Cubic Metre | - | - |
| 4 | Excavation for catch/ side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed. | 1,440 | One Cubic Metre | - | - |
| 5 | Excavation for catch/ side water gutter in hard murum and boulder strata to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed. | 5,760 | One Cubic Metre | - | - |
| 6 | Watering and compacting of embankment formed of materials obtained from the road cutting, within a lead of 50 metre, not less than 97 percent of standard proctor density after laying them in layers of 20 centimetre to 30 centimetre with vibratory roller. | 5,356 | One Cubic Metre | - | - |
| 7 | Providing earth work in embankment with approved materials obtained from other sources upto lead of 50 metre including all lifts, laying in layers of 20 centimetre to 30 centimetre thickness breaking clods, dressing to the required lines, curves, grades and section, watering and compaction with vibratory roller with V-Sat attachment to achieve not less than 97% of standard proctor density etc. complete (Material obtained from Other sources). | 662.08 | One Cubic Metre | - | - |
| 8 | Supplying hard murum at the road site including conveying and stacking complete. | 2,450 | One Cubic Metre | - | - |
| 9 | Spreading the hard murum for side width complete. | 2,450 | One Cubic Metre | - | - |
| 10 | Compacting the hard murum side widths including laying in layers on each side with power roller including artificial watering complete. | 29,500 | One Square Metre | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.09 MB
181.pdf
Tender Documents • 34.67 MB
BOQ_2260889.xls
BOQ • 0.52 MB
Pribid.pdf
PDF • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].