Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.1 LAdmitted-Finance 267 1 B KULAKARAI STREET PATTRAVAKKAM NEXT TO SIDCO 145 CHENNAI | CHENNAI | TAMIL NADU | 600001 | L1 | Admitted-Finance | |
| 2 | L2₹20.6 L+₹4.4 L (27.5%)Admitted-Finance NO 16 11 ANBAZHAGAN NAGAR MAIN ROAD MINJUR 601203 | THIRUVALLUR | TAMIL NADU | 601203 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MICRO SPARES L1 | SAHIRA ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Boiler First Pass / Inter pass. Charges to carryout tube thickness surv¬ey and identifying the weakened tube for renewal including charges for ultrasonic thickness gauge and T&P’s. | 800 | Points | 19 ₹17,936 Lowest | 25 ₹23,600 |
| 2.00 | Boiler First Pass / Inter pass. Charges for Cleaning by buffing water wall tubes for tube thickness survey. Including consumable and hire charges for T&P's. | 50 | Mtrs | 375 ₹22,125 Lowest | 450 ₹26,550 |
| 3.00 | Boiler First Pass in S panel / WW tubes. Charges for renewal of water wall tube of Dia 63.5 X 5.5 mm(above 44.5 mm OD) inclusive of transportation, cutting of defective tubes, edge/spool preparation, welding with IBR welder and assisting for hydraulic test. Charges including consumable and hire charges for T&P's. | 150 | Nos | 5,015 ₹8,87,655 Lowest | 6,200 ₹10,97,400 |
| 4.00 | Charges for fin welding by cleaning, surface preparation and welding. Including consumable and hire charges for T&P's. | 150 | Mtrs | 620 ₹1,09,740 Lowest | 700 ₹1,23,900 |
| 5.00 | DRUM OVERHAULING: Charges for opening the drum manhole doors, cleaning & inspection of drum internals, flushing of phosphate dosing line by cutting and welding, cleaning and inspection of screen dryers, and providing new gasket for manhole doors. Including consumable and hire charges for T&P's. | 1 | Boiler drum | 31,400 ₹37,052 Lowest | 40,000 ₹47,200 |
| 6.00 | Checking of weld cracks in separation chamber and welding the cracks with IBR welder. Including consumable and hire charges for T&P's. | 1 | Boiler drum | 11,020 ₹13,003.6 Lowest | 15,000 ₹17,700 |
| 7.00 | Dismantling the turbo separator (58 Nos.) for cleaning and refixing in position. Including consumable and hire charges for T&P's. | 58 | Nos | 340 ₹23,269.6 Lowest | 400 ₹27,376 |
| 8.00 | Charges for rectification of Boiler drum separators by reconditioning erosion/ crack, alignment of fins and replacing worn out mounting fastners. Including consumable and hire charges for T&P's. | 58 | Nos | 1,000 ₹68,440 Lowest | 2,000 ₹1,36,880 |
| 9.00 | Charges for cutting, edge preparation and welding of 1” pipe line, tee elbows, bends in Boiler pressure parts by IBR welder etc. at joints. Including consumable and hire charges for T&P's. | 15 | Nos | 2,200 ₹38,940 Lowest | 3,300 ₹58,410 |
| 10.00 | Charges for leading, lifting and arranging platform and scaffolding wherever required in the boiler and dismantling after completion of work. Including consumable and hire charges for T&P's. | 2 | Times | 11,250 ₹26,550 Lowest | 13,500 ₹31,860 |
Tender Value
Refer Docs
EMD Value
₹15,800
Closing Date
19 Nov 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE MI NCTPS I CH 120
O/o SE MI NCTPS I CH 120
NCTPS I SE MI Circle AOH 26 27 BM Dn Unit II Conducting tube thickness survey in Ist pass Inter pass overhauling of Ignitor scanner air fan system Boiler Drum Overhauling and renewal of defective tubes drain lines and Overhaul of boiler drums duri
2026_EB_726337_1
CE SE MI NCTPS I 198 26 27
Open Tender
Power/Energy Projects/Products
Works
25 days
Works
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹15,800
Yes
26 Nov 2026
14 Nov 2026
19 Nov 2026
14 Nov 2026
19 Nov 2026
14 Nov 2026
180 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Boiler First Pass / Inter pass. Charges to carryout tube thickness surv¬ey and identifying the weakened tube for renewal including charges for ultrasonic thickness gauge and T&P’s. | 800 | Points | 27,200 | ₹2,17,60,000 |
| 2 | Boiler First Pass / Inter pass. Charges for Cleaning by buffing water wall tubes for tube thickness survey. Including consumable and hire charges for T&P's. | 50 | Mtrs | 26,323 | ₹13,16,150 |
| 3 | Boiler First Pass in S panel / WW tubes. Charges for renewal of water wall tube of Dia 63.5 X 5.5 mm(above 44.5 mm OD) inclusive of transportation, cutting of defective tubes, edge/spool preparation, welding with IBR welder and assisting for hydraulic test. Charges including consumable and hire charges for T&P's. | 150 | Nos | 21,624 | ₹32,43,600 |
| 4 | Charges for fin welding by cleaning, surface preparation and welding. Including consumable and hire charges for T&P's. | 150 | Mtrs | 14,172 | ₹21,25,800 |
| 5 | DRUM OVERHAULING: Charges for opening the drum manhole doors, cleaning & inspection of drum internals, flushing of phosphate dosing line by cutting and welding, cleaning and inspection of screen dryers, and providing new gasket for manhole doors. Including consumable and hire charges for T&P's. | 1 | Boiler drum | 9,448 | ₹9,448 |
| 6 | Checking of weld cracks in separation chamber and welding the cracks with IBR welder. Including consumable and hire charges for T&P's. | 1 | Boiler drum | 6,182 | ₹6,182 |
| 7 | Dismantling the turbo separator (58 Nos.) for cleaning and refixing in position. Including consumable and hire charges for T&P's. | 58 | Nos | 1,802 | ₹1,04,516 |
| 8 | Charges for rectification of Boiler drum separators by reconditioning erosion/ crack, alignment of fins and replacing worn out mounting fastners. Including consumable and hire charges for T&P's. | 58 | Nos | 901 | ₹52,258 |
| 9 | Charges for cutting, edge preparation and welding of 1” pipe line, tee elbows, bends in Boiler pressure parts by IBR welder etc. at joints. Including consumable and hire charges for T&P's. | 15 | Nos | 9,273 | ₹1,39,095 |
| 10 | Charges for leading, lifting and arranging platform and scaffolding wherever required in the boiler and dismantling after completion of work. Including consumable and hire charges for T&P's. | 2 | Times | 5,604 | ₹11,208 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_871921.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .