Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
₹4.9 L
EMD Value
₹9,800
Closing Date
31 Jan 2022, 9:00 amClosed
Executive Engineer REW Doda
Office of the Executive Engineer REw Doda
Repair and Renovation of roof of Pyt ghar and other works Pyt Joudhpur A Block Ghar
2022_RDPR_158050_36
e-NIT No 51/Capex of REW Doda 2021-22 DT 24-01-22
Open Tender
Civil Works
Item Rate
30 days
Doda
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Rural Development and Panchayati Raj
₹9,800
9 Feb 2022
25 Jan 2022
31 Jan 2022
25 Jan 2022
31 Jan 2022
25 Jan 2022
Amount
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand)
Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level
20mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) including carriage of material all complete
Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm)
Grading roof for water proofing treatment with Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying :(a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound@ 0.253 kg/sqm. (b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. (c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg./sqm. and coarse sand @1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30cm on parapet wall and tucked into groove in parapet all around. (d) fourth and final layer of brick tiling with cement mortar (which will be paid for separately) For the purpose of measurement the entire treated surface will be measured.
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. Hard Rock (Blasting Prohibited)
CIB (citizen information Board ) size 4'00"x5'00"x0'9" (above plinth level) with tepered top having 20 degree slope in Brick Masonary(1:4) including plaster , paint, lettering and logos as per instruction of Engineer -in-charge including carriage of material. ( complete job)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .