Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹2.3 L
EMD Value
₹4,683
Closing Date
14 Sept 2026, 2:00 pmClosed
ASSISTANT ENGINEER RAMPURHAT SUB-DIVISION PWD
RAMPURHAT
As per NIET Sl 2
2026_WBPWD_5021641_2
WBPWD/AE/RPHSD/NIET-11/R of 2026-27
Open Tender
CIVIL WORKS
Percentage
30 days
Rampurhat
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,683
Yes
16 Sept 2026
2 Sept 2026
16 Sept 2026
2 Sept 2026
14 Sept 2026
2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repair to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sqm and under, including cutting the patch in proper shape, raking out joints and preparing plastering the wall surface with white cement based polymer modified self curing mortar, including disposal of rubbish, all complete as per the direction of Engineer-In-Charge | 1 | m2 | 670.95 | ₹670.28 |
| 2 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | - | m3 | 3,551.25 | - |
| 3 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved | - | m3 | 263.95 | - |
| 4 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 1:1½:3 (1 cement : 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | m3 | 10,357.55 | - |
| 5 | Providing & Applying polymer modified, flexible cementatious negative side waterproofing coating with elastic waterproofing polymers on interior wall plaster surface in three coats @14.35 kg /10 sqm. one coat of self priming of cementatious waterproofing polymer(dilution with water in the ratio of 1:1) and two coats of cementatious waterproofing polymer (dilution with water in the ratio of 3:1 ) after scrapping and properly cleaning the surface to remove pre-existing paint film & loose particles till plaster is visible, complete in all respect as per the direction of Engineer-in-Charge. | 1 | m2 | 447.35 | ₹446.9 |
| 6 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications : Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr /10 sqm | - | m2 | 193.7 | - |
| 7 | Providing and fixing double scaffolding system (cup lock type) on the exterior side,upto seven story height made with 40 mm dia M.S.tube1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S.tubes, M.S.tube challies, M.S.clamps and M.S.staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners,connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note: - This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done. | - | m2 | 338.25 | - |
| 8 | Modified Estimated cost after using GST correction factor @ 0.973 as per DSR,2023 over the Sub-Total upto item No.07 | 1 | Correction Factor | - | - |
| 9 | Add Add 9% cost index as per order no 34(1)/SDG(Kol)/cost index/2026/915, dated 19.05.26 of the Executive Engineer )P) (E), O/o the SDG (Kolkata), CPWD, Kol-20 over item No. 8 | - | Cost Index | - | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
Tendernotice_2.pdf
PDF • 0.47 MB
BOQ_5100499.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .