Loading…
Loading…
Tender Value
₹6.3 Cr
EMD Value
₹12.7 L
Closing Date
16 Jul 2026, 11:00 am
Repair/Overhauling work of furnishing activity for ICF & LHB AC & Non-AC and all OCV/PCV coaches as per scope of work at Motibagh Workshop, Nagpur
MIBW-2026-19-06-09-05
MIBW-2026-19-06-09-05
Open
12 Months
Nagpur, Maharashtra
₹0
₹12.7 L
24 Jun 2026
24 Jun 2026
2 Jul 2026
A-Stripping, cutting, repair/replacement of compreg ply/chequered Above/
Stripping, cutting, repair/replacement of compreg ply/chequered plate, in ICF & LHB (AC & Non-AC) coaches as per scope of work Above/
B-Stripping, cutting & replacement of LP Sheet & Limpet Sheet in ICF
"Stripping, cutting & replacement of LP Sheet & Limpet Sheet in ICF (AC & Non-AC) & all OCV coaches as per scope of work " Above/
C-"Furnishing activities in coaches in ICF& LHB (AC & Non-AC) & all
Furnishing activities in coaches in ICF& LHB (AC & Non-AC) & all OCVcoaches as per scope of work.
D-Repair/replacement & Stripping, setting & fitting of lavatory door, Above/
Repair/replacement & Stripping, setting & fitting of lavatory door, Body side door in ICF & LHB (AC & Non-AC) & all OCV coaches as per scope of work
E-"Repair/replacement & stripping, setting & fitting of Electrical Cubical Above/
Repair/replacement & stripping, setting & fitting of Electrical Cubical door, End door, Inter compartment door & Sliding door in ICF & LHB (AC) & all OCV coaches as per scope of work.
F-Repair/replacement & stripping, setting & fitting of UIC (LH + RH and Above/
Repair/replacement & stripping, setting & fitting of UIC (LH + RH and Top) Vestibule Rubber & Foot plate/bridge mounting arrangement in ICF & LHB (AC & Non-AC) & all OCV coaches as per scope of work
G-Repair/replacement, setting & fitting of Body side Windows, Door Above/
Repair/replacement, setting & fitting of Body side Windows, Door windows & Lavatory windows & Emergency windows in ICF & LHB (Non-AC) & all OCV coaches as per scope of work.
H-Repair/replacement & stripping, setting & fitting of compartment
Repair/replacement & stripping, setting & fitting of compartment sealed window glass & Lavatory Glass/Hopper Glass/Main door glass/ Body end sliding door glass/Inter communication door glass in ICF & LHB AC & all OCV coaches as per scope of work. Above/
I-Stripping of FRP/SS Modular Toilets in LHB (AC & Non-AC) Coaches as
Stripping of FRP/SS Modular Toilets in LHB (AC & Non-AC) Coaches as per scope of work. Above/
J-Fixing of FRP/SS Modular Toilets in LHB (AC & Non-AC) Coaches as per
Fixing of FRP/SS Modular Toilets in LHB (AC & Non-AC) Coaches as per scope of work.
K-Water tank and plumbing work (Flushing system of lavatory) of ICF & Above/
Water tank and plumbing work (Flushing system of lavatory) of ICF & LHB (AC and Non-AC) & all OCV coaches during POH as per scope of work.
L-Maintenance of pressurized flushing system / Electro-pneumatic Above/
Maintenance of pressurized flushing system / Electro-pneumatic pressurized flushing system (EPPFS) fitted in LHB (AC & Non-AC) Coaches as per scope of work. Above/
M-Modification to pipe laying to waste water in LHB (AC & Non-AC)
Modification to pipe laying to waste water in LHB (AC & Non-AC) Coaches as per scope of work Above/
N-Additional water Filling Arrangement to be provided in LHB (AC & Non-
Additional water Filling Arrangement to be provided in LHB (AC & Non-AC) Coaches as per scope of work. Above/
O-Fitment Of 30 Litre (LHB Type) Water Tank With Air Vent Valve And
Fitment Of 30 Litre (LHB Type) Water Tank With Air Vent Valve And Vacuum Valve in ICF AC Coaches as per scope of work. Above/
P-Buffing of SS components of ICF (AC and Non-AC) & all OCV coaches
Buffing of SS components of ICF (AC and Non-AC) & all OCV coaches as per scope of work. Above/
Q-Buffing of SS components of LHB (AC and Non-AC) & all OCV coaches
Buffing of SS components of LHB (AC and Non-AC) & all OCV coaches as per scope of work.
R-LB/UB/MB/SU/bed cum back rest/attendant berths stripping re- Above/
LB/UB/MB/SU/bed cum back rest/attendant berths stripping re-cushioning and re- fitting & disposal of (ACCW/FAC/FACCW) as per scope of work. Above/
S-Stripping, repair, fitment of LB/UB/SU/UB & disposal of (SCN/ACCN/all
Stripping, repair, fitment of LB/UB/SU/UB & disposal of (SCN/ACCN/all OCV/PCV) as per scope of work
T-Single seat/Turnover back rest/Small attendant seat stripping, re- Above/
Single seat/Turnover back rest/Small attendant seat stripping, re-cushioning and re- fitting & disposal of (SCN/ACCN/ACCW/FAC/FACCW/all OCV/PCV) as per scope of work.
U-Washing, Repairing/Stitching, Replacement of window /compartment Above/
Washing, Repairing/Stitching, Replacement of window /compartment curtains and chair car blinds in all AC coaches as per scope of work. Above/
V-Stripping and laying of PVC in BG Coaches & disposal as per scope of
Stripping and laying of PVC in BG Coaches & disposal as per scope of work. Above/
W-Repair/Welding of old PVC already fitted in BG coaches except
Repair/Welding of old PVC already fitted in BG coaches except Lavatory, as per scope of work. Above/
X-Stripping, re-cushioning and re-fitting & disposal of seat and back rest
Stripping, re-cushioning and re-fitting & disposal of seat and back rest in ACCZ coaches as per scope of work.
Y-Miscellaneous trimming activities as per scope of work (Arm rest, Above/
Miscellaneous trimming activities as per scope of work (Arm rest, chain sleeve, Rectificaton of chain assembly, loading/unloading etc.) Above/
Z-Stripping, repair and fitment & disposal of Single Seat/back rest
Stripping, repair and fitment & disposal of Single Seat/back rest (GS/SLR/SLRD/GSRD/LWS/LS-5) as per scope of work.
AA-Stripping, repair, fitment & disposal of Long Seat/Long Seat Back Above/
Stripping, repair, fitment & disposal of Long Seat/Long Seat Back rest/UB (GS/SLR/SLRD /GSRD/LWS/LS-5) as per scope of work Above/
AB-Stripping, repair, fitment of Single Seat / Single Seat back rest &
Stripping, repair, fitment of Single Seat / Single Seat back rest & disposal for for Chair car as per scope of work. Above/
AC-Supply of Machinery, Plants, Tools, Equipment, PPE, etc. required for
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Tenderdocument-MIBW.pdf
ATTACHMENT
Download all tender documents and submit your bid