Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC 606 80 FEET ROAD 7TH BLOCK 2ND PHASE BANASHANKARI 3RD STAGE BANGALORE 560 085 | BENGALURU URBAN | KARNATAKA | 560085 | ₹1.6 Cr | L1 | Accepted-AOC Lowest |
| 2 | L2₹1.7 Cr+₹2.3 L (1.41%)Rejected-Finance 26 3 3RD CROSS GANESHA BLOCK SULTANPALYA RT NAGAR POST BANGALORE 560 032 | BANGALORE | BANGALORE | KARNATAKA | 560032 | ₹1.7 Cr+₹2.3 L (1.41%) | L2 | Rejected-Finance Not lowest |
| 3 | L3₹1.8 Cr+₹11.4 L (6.90%)Rejected-Finance | ₹1.8 Cr+₹11.4 L (6.90%) | L3 | Rejected-Finance Not lowest |
| 4 | L4₹1.8 Cr+₹17.0 L (10.3%)Rejected-Finance NO 68 ANJANEYA TEMPLE CROSS OPP M S RAMAIAH HOSPITAL NEW BEL ROAD BANGALORE 560 094 | BENGALURU URBAN | KARNATAKA | 560094 | ₹1.8 Cr+₹17.0 L (10.3%) | L4 | Rejected-Finance Not lowest |
| 5 | Rejected-Technical | - | - | Rejected-Technical Firm has not submitted required documents such as DD, EMD and fulfilling criteria for enlistment in B class. |
| Sl No | Description | Qty | Unit | G K CONSTRUCTIONS L2 | devan enterprises L4 | Lucky Enterprises L1 | B5BUILDING SOLUTIONS L3 |
|---|---|---|---|---|---|---|---|
| 1.00Schedule 'A' Part-I (BUILDINGS AND STRUCTURES) This Schedule (contains under mentioned Sl item No. 1.01) is not prepriced by MES and the prepriced rate indicated in Col - 5 as ₹0.00 indicates this fact only. The tenderer is required to quote their rates in Col 6. | |||||||
| 1.01 | Lumpsum price worked out by the contractor for Construction of Small Compressor Test Facility Building in D/S including all fittings and fixtures complete all as specified and as shown on drawings. | 1 | EACH BLOCK | 53,00,000 ₹53,00,000 | 58,65,000 ₹58,65,000 | 47,98,000 ₹47,98,000 Lowest | 64,80,000 ₹64,80,000 |
| 2.00 | Lump sum price worked out by the Contractor for “ADDITION / ALTERATION TO SMALL COMPRESSOR TEST FACILITY” as listed in Schedule ‘A’ Part - II representing ____________ % __________________ percent Above / Below the lump sum price of ₹11,97,524.66 inserted by the MES in Schedule ‘A’ Part - II | 1 | LUMPSUM | 11,50,000 ₹11,50,000 | 12,45,000 ₹12,45,000 | 10,98,000 ₹10,98,000 Lowest | 11,50,000 ₹11,50,000 |
| 3.00 | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Part - III representing __________ % ____________ percent Above / Below the lump sum price of `9,69,639.00 inserted by the MES in Schedule ‘A’ Part - III | 1 | LUMPSUM | 9,69,000 ₹9,69,000 | 11,12,000 ₹11,12,000 | 9,50,000 ₹9,50,000 Lowest | 10,25,000 ₹10,25,000 |
| 4.00 | Lump sum price worked out by the Contractor for “EXCAVATION, EARTHWORK AND SITE CLEARANCE” as listed in Schedule ‘A’ Part - IV representing __________ % ____________ percent Above / Below the lump sum price of `1,67,520.20 inserted by the MES in Schedule ‘A’ Part - IV | 1 | LUMPSUM | 1,60,000 ₹1,60,000 | 1,68,500 ₹1,68,500 | 1,55,000 ₹1,55,000 Lowest | 1,55,000 ₹1,55,000 Lowest |
| 5.00 | Lump sum price worked out by the Contractor for “LIGHTNING PROTECTION” as listed in Schedule ‘A’ Part - V representing ___________ % ___________________ percent Above / Below the lump sum price of ₹96,497.60 inserted by the MES in Schedule ‘A’ Part - V | 1 | LUMPSUM | 96,000 ₹96,000 | 1,35,000 ₹1,35,000 | 95,000 ₹95,000 Lowest | 1,08,000 ₹1,08,000 |
| 6.00 | Lump sum price worked out by the Contractor for “EXTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part - VI representing ____________ % ____________________________ percent Above / Below the lump sum price of `87,719.20 inserted by the MES in Schedule ‘A’ Part - VI | 1 | LUMPSUM | 95,000 ₹95,000 | 1,22,000 ₹1,22,000 | 1,45,000 ₹1,45,000 | 89,000 ₹89,000 Lowest |
| 7.00 | Lump sum price worked out by the Contractor for “EXTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Part - VII representing __________ % __________________ percent Above / Below the lump sum price of ₹19,824.00 inserted by the MES in Schedule ‘A’ Part - VII | 1 | LUMPSUM | 19,000 ₹19,000 | 15,000 ₹15,000 Lowest | 17,800 ₹17,800 | 21,000 ₹21,000 |
| 8.00Schedule 'A' Part - VIII This Schedule is not prepriced by MES and the prepriced rate indicated in Col - 5 as ₹0.00 indicates this fact only. The tenderer is required to quote their rates in Column 6. This Schedule constitutes Sl. Item Nos. 9.00 to 59.00. | |||||||
| 9.00 | INTERNAL ELECTRIFICATION
Taking down carefully unserviceable aluminium / copper point wiring (light, fan, socket or power) complete with fittings such as switches, sockets, ceiling rose, light fittings etc, and making good the distrubed surface as the existing one complete all as specified and directed. | 101 | POINT | 10 ₹1,010 Lowest | 30 ₹3,030 | 50 ₹5,050 | 50 ₹5,050 |
Tender Value
₹1.7 Cr
EMD Value
₹2.5 L
Closing Date
14 May 2026, 6:00 pmClosed
CHIEF ENGINEER RND SECUNDERABAD
CHIEF ENGINEER RND SECUNDERABAD OPP JUBILEE BUS STATION PICKET SECUNDERABAD 500003
ADDITION ALTERATION TO SMALL COMPRESSOR TEST FACILITY BUILDING NO P-56 AT GTRE, BANGALORE
2026_MES_759712_1
82675
Open Tender
Civil Works
Lump-sum
270 days
Bangalore
Class B
category a(i) and b(i)
7 documents required · 7 mandatory
₹1,000
GARRISON ENGINEER I RND EAST BANGALORE
₹2.5 L
Yes
13 Aug 2026
9 Apr 2026
18 May 2026
9 Apr 2026
14 May 2026
7 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Schedule 'A' Part-I (BUILDINGS AND STRUCTURES)
This Schedule (contains under mentioned Sl item No. 1.01) is not prepriced by MES and the prepriced rate indicated in Col - 5 as ₹0.00 indicates this fact only. The tenderer is required to quote their rates in Col 6. | - | - | - | - |
| - | Lumpsum price worked out by the contractor for Construction of Small Compressor Test Facility Building in D/S including all fittings and fixtures complete all as specified and as shown on drawings. | - | EACH BLOCK | - | - |
| - | Lump sum price worked out by the Contractor for “ADDITION / ALTERATION TO SMALL COMPRESSOR TEST FACILITY” as listed in Schedule ‘A’ Part - II representing ____________ % __________________ percent Above / Below the lump sum price of ₹11,97,524.66 inserted by the MES in Schedule ‘A’ Part - II | - | LUMPSUM | - | - |
| - | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Part - III representing __________ % ____________ percent Above / Below the lump sum price of `9,69,639.00 inserted by the MES in Schedule ‘A’ Part - III | - | LUMPSUM | - | - |
| - | Lump sum price worked out by the Contractor for “EXCAVATION, EARTHWORK AND SITE CLEARANCE” as listed in Schedule ‘A’ Part - IV representing __________ % ____________ percent Above / Below the lump sum price of `1,67,520.20 inserted by the MES in Schedule ‘A’ Part - IV | - | LUMPSUM | - | - |
| - | Lump sum price worked out by the Contractor for “LIGHTNING PROTECTION” as listed in Schedule ‘A’ Part - V representing ___________ % ___________________ percent Above / Below the lump sum price of ₹96,497.60 inserted by the MES in Schedule ‘A’ Part - V | - | LUMPSUM | - | - |
| - | Lump sum price worked out by the Contractor for “EXTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part - VI representing ____________ % ____________________________ percent Above / Below the lump sum price of `87,719.20 inserted by the MES in Schedule ‘A’ Part - VI | - | LUMPSUM | - | - |
| - | Lump sum price worked out by the Contractor for “EXTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Part - VII representing __________ % __________________ percent Above / Below the lump sum price of ₹19,824.00 inserted by the MES in Schedule ‘A’ Part - VII | - | LUMPSUM | - | - |
| - | Schedule 'A' Part - VIII
This Schedule is not prepriced by MES and the prepriced rate indicated in Col - 5 as ₹0.00 indicates this fact only. The tenderer is required to quote their rates in Column 6. This Schedule constitutes Sl. Item Nos. 9.00 to 59.00. | - | - | - | - |
| - | INTERNAL ELECTRIFICATION
Taking down carefully unserviceable aluminium / copper point wiring (light, fan, socket or power) complete with fittings such as switches, sockets, ceiling rose, light fittings etc, removing all material for reuse / issued under Schedule of Credit and making good the distrubed surface as the existing one complete all as specified and directed. | - | POINT | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.50 MB
Prepriced_Schedules_82675.pdf
Additional Documents • 0.43 MB
Revised_drawings.rar
Additional Documents • 2.50 MB
Tender_82675.pdf
Tender Documents • 1.80 MB
BOQ_850933.xls
BOQ • 0.80 MB
REVISED_DRG.rar
PDF • 0.33 MB
RevPrepriced_Schedules_82675.pdf
PDF • 0.43 MB
Amendment.pdf
PDF • 0.26 MB
82675Postponement.pdf
PDF • 0.18 MB
82675Postponement.pdf
PDF • 0.18 MB
82675Postponement.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .