Loading…
Loading…
| # | Company | Amount | Rank |
|---|---|---|---|
| 1 | L1₹2.2 Cr | ₹2.2 Cr | L1 |
Tender Value
₹1.9 Cr
EMD Value
₹1.4 L
Closing Date
1 May 2026, 11:59 pmClosed
MR JAHEER MOHAMMAD
ACTWD SUKMA
CONSTRUCTION WORK OF 50 SEETER POST MAITRIC ( ST) BOY'S HOSTAL BUILDING AT GOLAPALLI BLOCK KONTA WITH ELECRIFICATION ( 10% OF CIVIL WORK), SANETORY FITTING, WATER SUPLLY, SEPTIC TANK, BORE WELL, SUBMARSIBLE PUMP, SUMPWELL, RAIN WATER HARVESTING , PERMANENT RCC BED, CHAUKIDAR QUARTER, BOUNDRY WALL, DRAIN, ENTRANCE ROAD & SITE DEVELOPMENT
189759
NIT-05 (2nd)
RESTRICTED TENDER
Works
PERCENTAGE
ACTWD SUKMA
17 documents required · 17 mandatory
Tribal Welfare Department, District Sukma(TWDDS)
Works
MR JAHEER MOHAMMAD
RESTRICTED TENDER
PERCENTAGE
A B C
ACTWD SUKMA
CONSTRUCTION
ACTWD SUKMA
No
0
189759
1 May, 2026 11:59:00 PM IST
6 May, 2026 11:00:00 AM IST
25 Apr, 2026 6:00:00 PM IST
NIT-05 (2nd)
CONSTRUCTION WORK OF 50 SEETER POST MAITRIC ( ST) BOY'S HOSTAL BUILDING AT GOLAPALLI BLOCK KONTA WITH ELECRIFICATION ( 10% OF CIVIL WORK), SANETORY FITTING, WATER SUPLLY, SEPTIC TANK, BORE WELL, SUBMARSIBLE PUMP, SUMPWELL, RAIN WATER HARVESTING , PERMANENT RCC BED, CHAUKIDAR QUARTER, BOUNDRY WALL, DRAIN, ENTRANCE ROAD & SITE DEVELOPMENT
142400.00 INR
Demand Draft (OFFLINE)
18977000.00
2
5 May, 2026 5:30:00 PM IST
18977000
0.00 INR
6d 6h 19m
17 documents required · 15 mandatory · 2 optional
₹0
₹1.4 L
1 May 2026
25 Apr 2026
6 May 2026
25 Apr 2026
1 May 2026
25 Apr 2026
5 May 2026
boq_comp_chart.xls
BOQ Comparative Chart • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 1.09 MB
1417559338249881952_189759_Golapalli.zip
NIT • 7.91 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].