| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹61.3 LAccepted-AOC | ₹61.3 L | L1 | Accepted-AOC l1 |
| 2 | L2₹61.9 LRejected-Finance | ₹61.9 L | L2 | Rejected-Finance L2rejected |
| Sl No | Description | Qty | Unit | P MADASAMY L1 | Prasanth L2 |
|---|---|---|---|---|---|
| 1.00Upgradation of puthiamputhur - vadakkusilukkanpatti road km 2/2 - 3/285 in Puthiyamputhur Panchayat in Ottapidaram Panchayat Union (R-266) | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., | 1,302 | cum | 6.23 ₹8,111.46 | 6 ₹7,812 |
| 3.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out | 585.9 | cum | 137.64 ₹80,643.28 | 139 ₹81,440.10 |
| 4.00Providing and Laying Red Gravel side berms including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. | |||||
| 5.00 | Km 2/2 - 3/00 | 108 | cum | 960.69 ₹1.0 L | 970 ₹1.0 L |
| 6.00 | Km 3/0 -3/285 | 38.48 | cum | 969.94 ₹37,323.29 | 979 ₹37,671.92 |
| 7.00 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401 | 295.31 | cum | 2,492.34 ₹7.4 L | 2,515 ₹7.4 L |
| 8.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2 | 610.32 | cum | 2,552.84 ₹15.6 L | 2,576 ₹15.7 L |
| 9.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 4,068.75 | Sqm | 85.12 ₹3.5 L | 86 ₹3.5 L |
| 10.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all | 4,068.75 | Sqm | 19.95 ₹81,171.56 | 20 ₹81,375 |
Tender Value
₹66.1 L
EMD Value
₹67,000
Closing Date
20 Feb 2026, 3:00 pmClosed
Additional Collector(D)/Project Director
Additional Collector(D)/Project Director
PKG015 Strengthening / Upgradation of puthiamputhur - vadakkuilukkan patti road km 0/0 - 3/285 in Thoothukudi Block of Thoothukudi District under NABARD RIDF 2026-27
2026_RDTN_657589_2
DRDA A4/165/2026 Dt.12.02.2026
Open Tender
Civil Works
180 days
DRDA THOOTHUKUDI
As per tender Schedule
4 documents required · 4 mandatory
₹0
₹67,000
DRDA, Thoothukudi
14 May 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
16 Feb 2026
Upgradation of puthiamputhur - vadakkusilukkanpatti road km 2/2 - 3/285 in Puthiyamputhur Panchayat in Ottapidaram Panchayat Union (R-266)
Clearing the Scrub jungle including all labour charges for burrying and burning etc.,
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out
Providing and Laying Red Gravel side berms including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for KM Stone
Provision for HM Stone
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_788777.xls
BOQ • 0.26 MB
15Oprm.pdf
Tender Documents • 1.40 MB
Download all tender documents and submit your bid