Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
29 Oct 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
Construction of foot crossing on Shilthra nallah near steel bridge
2021_RDPR_144752_3
NIT No 47 of 2021-22 Mawer
Open Tender
Civil Works
Item Rate
90 days
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER REW KUPWARA
29 Oct 2021
23 Oct 2021
29 Oct 2021
23 Oct 2021
29 Oct 2021
23 Oct 2021
23 Oct 2021 - 23 Oct 2021
60 days
Amount
Earth work in excavation by mannual mean in trenchs for foundation , drains, pipes , cables etc ( not exceeeding 1.5 mtr in width and for shafts wells , cesspits and the like not exceeding 10sqm on plan , depth upto 1.5 mtr including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be leveled and neatly dressed in . All kind of soil.
Providing and laying of stone soling (hand packed tightly ) incliuding all carriages of Material upto site of work complete Job by MT aas well as HL
P/L in position specified grade e including curing but excluding the cost of centering and shuttering, finishig and reinforcement All work upto plinth level with 1:4:8(1cement:4coarse sand : 8graded stone agg. 40 mm size ) including all carriages by MT as well as HL of material up to site of Work Complete job.
P/L in position cement concrete. of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with 1:3:6(1cement:3 coarse sand : 6 graded stone agg 20 mm size including all carriages by MT as well as HL of material up to site of work complete job.
P/L in position specified grade of reinforced cement concrete including curing but excluding the cost of centering and shuttering, finishig and reinforcement All work upto plinth level with 1:2:4(1cement:2coarse sand : 4 graded stone agg. 20 mm size ) including all carriages by MT as well as HL of material up to site of Work Complete job.
P/L in position specified grade of reinforced cement concrete including curing but excluding the cost of centering and shuttering, finishig and reinforcement All work upto plinth level with 1:1.5:3(1cement:1.5coarse sand : 3 graded stone agg. 20 mm size ) including all carriages by MT as well as HL of material up to site of Work Complete job.
Centering and shuttering incl. strutting propping etc and removal off form work for:- Foundation footings ,bases of columns, suspended floors, roofs, landing etc with all carriages of material by MT as well as HL up to site of work Complete job
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and medium tensile steel bars with all carriages
Providing and fixing of Community Inforamtion board (CIB)
GHULAM MOHD MIR
AIJAZ AHMAD MIR
stage.html
html • 0.02 MB
finance_309824.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .