| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 CrAccepted-AOC KRISHNA COMPLEX JAIN COLLEGE ROAD SAHARANPUR UTTAR PRADESH PIN CODE 247001 | SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | ₹4.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹4.5 Cr+₹39.3 L (9.55%)Rejected-AOC 0 AJAY KUMAR 85 HASTAM HASTAM BANDA UTTAR PRADESH 210001 HASTAM BANDA UTTAR PRADESH 210001 UDYAM UP 13 0007628 | BANDA | UTTAR PRADESH | 210001 | ₹4.5 Cr+₹39.3 L (9.55%) | L2 | Rejected-AOC L2 |
Tender Value
₹5.5 Cr
EMD Value
₹11.0 L
Closing Date
12 Jun 2020, 2:00 pmClosed
S.E IWC SRE
Office of the S.E IWC SRE
CAPACITY RESTORATION WORK OF NALHERA DY. IN DISTT. SAHARANPUR
2020_UPIDC_478770_1
02/SE/SRE/2020-21
Open Tender
Civil Works
Item Rate
180 days
saharanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
S.E IWC SRE
₹11.0 L
8 Dec 2020
4 Jun 2020
12 Jun 2020
4 Jun 2020
12 Jun 2020
4 Jun 2020
Amount
Earth work in excavation in foundation in all type of soil i/c lift upto 1.50 m & lead upto 30 m & including filling, watering & ramming excavated earth into the trenches or into the space between the structure & the side of foundation trenches or into the plinth with removal & disposal of surplus earth as directed by the Engineer-in-Charge. i/c all labour, T&P etc. for proper completion of work.
Ist class Brick work in 1:4 cement mortar upto 3.00 m height with 60 m. lead of material i/c cost of all material, labour, T&P etc. for proper completion of work.
Cement pointing {struck /deep} on brick masonry in 1:2 C.M. i/c cost of all material, labour, T&P etc. for proper completion of work.
Cement pointing {struck /deep} on brick masonry in 1:3C.M. i/c cost of all material, labour, T&P etc. for proper completion of work.
Earth Work in cutting i/c lift upto 1.50 m & lead upto 30 m i/c ramming, dressing by mannal labour or machine. The earth from cutting to be used in side embankment or to be disposed off spoil bank or as directed by Engineer-in-Charge. i/c all labour, T&P etc. for proper completion of work.
Earth Work in embankment in all type of soil including ramming & dressisng the surface to the reqiired level, slopes & aslo including lift upto 1.50 m & lead upto 1.00 km. i/c cost of earth. The earth from cutting to be used in side embankment or to be disposed off spoil bank or as directed by Engineer-in-Charge. i/c all labour, T&P etc. for proper completion of work.
Laying C.C. 1:3:6 with stone ballast i/c cost of all material, labour,T&p etc. but excluding cost of centring & shuttering for proper completion of work.
Supply & Laying of R.C.C Hume Pipe 150 mm dia NP-2 i/c cost of all material ,labour, T&p etc. for proper completion of work.
Laying 2.5 cm thick C.C. Floor in 1:2:4 i/c cost of all material, labour, T&p etc. for proper completion of work.
12 mm thick cement plaster 1:4 on brick masonry including cost of all meterial, labour, T&p etc. for proper completion of work.
Laying of C.C 1:1½:3 with stone ballast size 10 mm to 20 mm i/c cost of all material, labour & T&P etc but excluding cost of centring & shuttering for proper completion of work.
Laying brick-on-edge Soling laid dry filling joints i/c preparation of base to proper slope and its ramming i/c cost of all meterial, labour, T&p etc required for proper completion of work.
Centering and shuttering of R.C.C. work i/c all labour, T&P etc. for proper completion of work.
Supply & laying Steel reinforcement i/c bending ,binding, cutting, placinf of reinforcement i/c cost of bindidng wire but including cost of all material, labour, T&P etc. for proper completion of work.
Laying of R.C.C 1:1½:3 with stone ballast i/c cost of all material, labour & T&P etc but excluding cost of centring & shuttering and steel etc. for proper completion of work.
Supply & fixing drainage pipe i/c cost of all material, labour, T&P etc. for proper completion of work.
Filling of fine sand (blended to F.M 1.25 ) i/c ramming dressing i/c all lead & lift etc. i/c cost of all material, labour, T&P etc. for proper completion of work.
Supply & laying thermocol sheet i/c cost of all material, labour, T&P etc. for proper completion of work.
Laying of C.C 1:2:4with stone ballast size 10 mm to 20 mm i/c cost of all material, labour & T&P etc but excluding cost of centring & shuttering for proper completion of work.
Dismantling R.C.C. work of old V.R.B. i/c stacking of material,with-in 60 m. i/c all labour. T&P etc. for proper completion of work.
Dismantling Brick work of old V.R.B. i/c stacking of material,with-in 60 m. i/c all labour. T&P etc. for proper completion of work.
Repair of Head Gate i/c cost of all meterial, labour, T&p etc required for proper completion of work.
M/S AJAY KUMAR CONTRACTOR
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .