Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.1 LAdmitted-Finance NEAR RADHA KRISHNA MANDIR VIKASH BHAWAN JAYANT SINGRAULI MP PIN 486890 | SINGRAULI | MADHYA PRADESH | 486890 | ₹16.1 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical SHUKIA MORE MORWA DISTT SINGRAULI MP | MORWA | SINGRAULI | MP | - | - | Rejected-Technical TECHNICALLY REJECTED |
| 3 | Rejected-Technical JAYANT NEAR JAI HIND SCHOOL LAXMI MARKET SINGRAULI 486890 MADHYA PRADESH INDIA | SINGRAULI | MADHYA PRADESH | 486890 | - | - | Rejected-Technical TECHNICALLY REJECTED |
| Sl No | Description | Qty | Unit | VISHAL ENGINEERING WORKS L1 |
|---|---|---|---|---|
| 1.00Scope of Work/Technical Specifications etc: 1. Dismantling and removal of track chain pads & idler assembly of both sides (LHS+RHS). 2. Lifting of machine with the help of hydraulic jacks for dismantling of worn-out assembly. 3. Dismantling and removal of 16 nos. supporting wheel assembly & 02 nos. rear supporting wheel assembly with their shafts. 4. Cleaning of roller housing for welding and coaxial boring purpose. 5. Welding / rebuilding of housing up to required dimension for boring purpose. 6. Co-axial boring of 16 nos. supporting wheel assembly & 02 nos. rear supporting wheel assembly with their shafts. 7. Fitment of 16 nos. supporting wheel assembly & 02 nos. rear supporting wheel assembly with their shafts. 8. Descending machine with help of hydraulic jacks. 9. Fitment of track chain pads & idler assembly for both sides (LHS+RHS). 10. Testing of wheel assembly & lubrication system for undercarriage after fitment. Note: The maximum deployment of manpower for the above job likely to be 1. Highly Skilled (Supervisor) for 78 nos. manshifts, 2. Skilled Manpower (Fitter) for 132 nos. manshifts 3. Skilled Manpower (Welder) for 96 nos. manshifts 4. Semi-skilled for 192 nos. manshifts. & 5. Un-Skilled for 216 nos. of manshifts. | ||||
| 2.00 | Labour charges for removal of track chain pads & idler assembly of both sides (LHS+RHS), lifting of the machine for dismantling of worn out assembly and removal of track rollers (16+2 nos.) for LHS+RHS including contractor's profit. | 1 | Job | 2,64,910.5 ₹2.6 L |
| 2.10 | Labour charges for Welding / rebuilding of housing up to required dimension for boring purpose, cleaning, fitment of all 16+2 nos. wheels with grinding and washer setƫng for LHS+RHS (after co-axial boring of housings), descending of machine and fitment of track chain pads & idler assembly for both sides (LHS+RHS) including contractor's profit. | 1 | Job | 3,18,082.1 ₹3.2 L |
| 2.20 | Labour charges for supervisor for above scope of work. including contractor's profit. | 1 | Job | 80,480.4 ₹80,480.40 |
| 3.00 | charges for Co-axial boring for Shaft/Pin housing of all (16+2 nos.) track rollers/wheels for LHS+RHS. Volume of 01 no. pin housing (Supporting wheel): [3.14 x 0.25 x (16.5^2 - 15.5^2) x 13.3] + [3.14 x 0.25 x (17.1^2 - 16.1^2) x 12.2] = 334.096 + 317.956 = 652.052 Cu. Cm. Hence, for 16 nos. supporting wheel pin housing = 16 x 652.052 = 10432.83 Cu. Cm. & Volume of 01 no. pin housing (Rear Supporting wheel): [3.14 x 0.25 x (22.9^2 - 21.9^2) x 13.3] + [3.14 x 0.25 x (23.5^2 - 22.5^2) x 12.2] = 467.734 + 440.542 = 908.276 Cu. Cm. Hence, for 2 nos. supporting wheel pin housing = 2 x 908.276 = 1816.552 Cu. Cm | 12,249.38 | Cu.Cm | 55.8 ₹6.8 L |
| 4.00Hiring Charges for above job. | ||||
| 4.10 | hydraulic jack (300 Ton) – 04 nos. for above mentoned scope of work. | 1 | Job | 1,56,000 ₹1.6 L |
| 4.20 | Welding machine - 02 nos. with all accessories for above mentoned scope of work. | 1 | Job | 7,800 ₹7,800 |
| 4.30 | Gas cuƫng - 01 no. with all accessories for above mentoned scope of work. | 1 | Job | 3,900 ₹3,900 |
| 4.40 | Grinder machine - 02 nos. with all accessories for above mentoned scope of work. | 1 | Job | 7,800 ₹7,800 |
Tender Value
₹17.3 L
EMD Value
₹21,700
Closing Date
1 Apr 2026, 11:00 amClosed
GENERAL MANAGER EXCAVATION, NCL KHADIA PROJECT
NCL KHADIA PROJECT, SHAKTINAGAR, SONEBHADRA, U.P. - 231222
Repairing, replcmnt and fitmnt of trck chain pads and idler assy, all 16 nos. suportig whel, 2 no. Rear suportig whels and Co axial boring of suportig whel pin housig for both sides (LHS and RHS) of UC of TZ WK 20 ER shovel of Khadia Project.
2026_NCL_357090_1
KHD/G.M. (Excv)/E-Tender/25-26/1314
Open Tender
Excavation Department Work
39 days
NCL KHADIA PROJECT, SHAKTINAGAR
Please refer Tender documents.
6 documents required · 6 mandatory
₹21,700
18 Apr 2026
19 Mar 2026
2 Apr 2026
19 Mar 2026
1 Apr 2026
20 Mar 2026
19 Mar 2026 - 27 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Scope of Work/Technical Specifications etc:
1. Dismantling and removal of track chain pads & idler assembly of both sides (LHS+RHS).
2. Lifting of machine with the help of hydraulic jacks for dismantling of worn-out assembly.
3. Dismantling and removal of 16 nos. supporting wheel assembly & 02 nos. rear supporting wheel assembly with their shafts.
4. Cleaning of roller housing for welding and coaxial boring purpose.
5. Welding / rebuilding of housing up to required dimension for boring purpose.
6. Co-axial boring of 16 nos. supporting wheel assembly & 02 nos. rear supporting wheel assembly with their shafts.
7. Fitment of 16 nos. supporting wheel assembly & 02 nos. rear supporting wheel assembly with their shafts.
8. Descending machine with help of hydraulic jacks.
9. Fitment of track chain pads & idler assembly for both sides (LHS+RHS).
10. Testing of wheel assembly & lubrication system for undercarriage after fitment.
Note: The maximum deployment of manpower for the above job likely to be 1. Highly Skilled (Supervisor) for 78 nos. manshifts, 2. Skilled Manpower (Fitter) for 132 nos. manshifts 3. Skilled Manpower (Welder) for 96 nos. manshifts 4. Semi-skilled for 192 nos. manshifts. & 5. Un-Skilled for 216 nos. of manshifts. | - | - | - | - | |
Labour charges for removal of track chain pads & idler assembly of both sides (LHS+RHS), lifting of the machine for dismantling of worn out assembly and removal of track rollers (16+2 nos.) for LHS+RHS including contractor's profit. | - | Job | - | - | |
Labour charges for Welding / rebuilding of housing up to required dimension for boring purpose, cleaning, fitment of all 16+2 nos. wheels with grinding and washer setƫng for LHS+RHS (after co-axial boring of housings), descending of machine and fitment of track chain pads & idler assembly for both sides (LHS+RHS) including contractor's profit. | - | Job | - | - | |
Labour charges for supervisor for above scope of work. including contractor's profit. | - | Job | - | - | |
charges for Co-axial boring for Shaft/Pin housing of all (16+2 nos.) track rollers/wheels for LHS+RHS. Volume of 01 no. pin housing (Supporting wheel): [3.14 x 0.25 x (16.5^2 - 15.5^2) x 13.3] + [3.14 x 0.25 x (17.1^2 - 16.1^2) x 12.2] = 334.096 + 317.956 = 652.052 Cu. Cm. Hence, for 16 nos. supporting wheel pin housing = 16 x 652.052 = 10432.83 Cu. Cm. & Volume of 01 no. pin housing (Rear Supporting wheel): [3.14 x 0.25 x (22.9^2 - 21.9^2) x 13.3] + [3.14 x 0.25 x (23.5^2 - 22.5^2) x 12.2] = 467.734 + 440.542 = 908.276 Cu. Cm. Hence, for 2 nos. supporting wheel pin housing = 2 x 908.276 = 1816.552 Cu. Cm | - | Cu.Cm | - | - | |
Hiring Charges for above job. | - | - | - | - | |
hydraulic jack (300 Ton) – 04 nos. for above mentoned scope of work. | - | Job | - | - | |
Welding machine - 02 nos. with all accessories for above mentoned scope of work. | - | Job | - | - | |
Gas cuƫng - 01 no. with all accessories for above mentoned scope of work. | - | Job | - | - | |
Grinder machine - 02 nos. with all accessories for above mentoned scope of work. | - | Job | - | - |
stage.html
html • 0.03 MB
technical_369954.pdf
techsummary_369954.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.32 MB
Annexures.pdf
Tender Documents • 0.82 MB
ITB.pdf
Tender Documents • 0.38 MB
BOQ_369954.xls
BOQ • 0.33 MB
COC_ATC.pdf
Tender Documents • 1.48 MB
Download all tender documents and submit your bid