Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.4 L
EMD Value
₹3,390
Closing Date
19 Apr 2026, 5:00 pmClosed
EXECUTIVE OFFICER RANPUR
OFFICE OF THE EXECUTIVE OFFICER RANPUR
DEVELOPMENT OF COMMUNITY CENTER FOR WORSHIP OF MUSLIMCOMMUNITY CENTER IN WN-11 OF RANPUR NAC
2026_ORULB_127994_15
RNP NAC -01/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
NAC RANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹3,390
Yes
20 Apr 2026
10 Apr 2026
20 Apr 2026
10 Apr 2026
19 Apr 2026
10 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation in foundation in hard soil including rough dressing and levelling the bed by depositing soil within initial lead and lift . | - | Cum | 1 | - |
| 2 | Supplying and filling Sand in foundation and on Road Surface including watering and ramming with Cost, Conveyance and Royalty of all materials etc. allcomplete. | 3.95 | Cum | 668.2 | ₹2,639.39 |
| 3 | Cement Concrete in (1:3:6) using 40mm size Hard Granite C.B. metal in foundation Bed and Road including watering, curring with Cost, Conveyance and Royalty of all materials etc. allcomplete . | 3.74 | Cum | 6,233.9 | ₹23,314.79 |
| 4 | Brick Work with Fly ash bricks 25cm X 12cm X 8cm size having crushing strength not less than 75kg/cm2 with dimensional tolerance +2 percent in cement mortar (1:6) in Foundation and Plinth including watering curing, Cost, Labour, T & P etc. complete as per the direction of E.I.C. | 6.58 | Cum | 5,663.2 | ₹37,263.86 |
| 5 | R.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including, hoisting, laying hire charges of concrete misture, vibrator, watering, curing and cost of all materials and labour, T & P centering shuttering etc. complete but excluding cost of reinforcement complete.
Column footing | 8.64 | Cum | 6,741.4 | ₹58,245.7 |
| 6 | Plinth | 1 | Cum | 7,611.7 | ₹7,611.7 |
| 7 | Column & Beam | 4.35 | Cum | 18,404.6 | ₹80,060.01 |
| 8 | Supplying, Fitting and Fixing of HYSD bar Reinforcement as per drawing and technical specification including cost and convayance of all materials with labour T & P etc. all complete as per direction of EIC. | - | Qtl | - | - |
| 9 | Supplying and Fixing a Display signboard at site made of M.S. plate and angles with writing details about the Project as per direction of Engineer-in-Charge | - | LS | - | - |
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
BOQ_587570.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .