Tender Value
₹8.8 L
EMD Value
₹22,100
Closing Date
10 Dec 2025, 10:30 pmClosed
Rural Drinking Water and Sanitation Department
Pradeep Patil
Power Sanction for arranging power supply to an extent of 7.5 HP Water Supply Installation in the Name of the Panchayat Development Officer Nirna Near Source Open Well R/o Nirna Village in OandM Nirna Section of Sub Division Mannaekhelli- Under Self Execution Basis
RWSSD/2025-26/EL/WORK_INDENT9253/CALL-2
RWSSD/2025-26/EL/WORK_INDENT9253/CALL-2
Open
Electrical
Two Tender Document System(Two Cover)
RWSSD Division Office Bidar
5 documents required · 4 mandatory · 1 optional
Department Registration Details
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing work
List of works for which tenders already submitted
Banker Details
Similar nature of work done certifcate minimum 50percent of amount put to tender and workdone certifcate issued by Not below the Executive Engineer
List of existing commitments and ongoing work
List of works for which tenders already submitted
Total value of electrical engineering works executed and payments received in the last five years (year-wise)
GST & PANCARD Certificate
Valid PWD/Gescom ELECTRICAL CONTRACTOR Registration Certifcate
Other relevant Documents As per KW standard document and tender notifcation and as per KPPP General Conditions
Work to be executed as per Sanctioned Estimate ,Approved drawings and specifications of as per rule under the GESCOM official/ KERC and Permission to be taken from GESCOM Authority before starting work and execution of work and after completionof work also intimation to be done with concern department and work to be handed over to GESCOM officials and then as per decision of RDW&S Officials.
Annual Turnover Certifcate Should be UDIAN no
₹500
₹22,100
10 Dec 2025
29 Nov 2025
12 Dec 2025
9 Dec 2025
Power Sanction for arranging power supply to an extent of 7.5 HP Water Supply Installation in the Name of the Panchayat Development Officer Nirna Near Source Open Well R/o Nirna Village in OandM Nirna Section of Sub Division Mannaekhelli- Under Self Execution Basis
PART A-Material cost -200006-PSC Pole-9.0M Long,200 kg WL
Labour cost -Erection of RCC/PSC poles 9
to 10 mtr long but in a pit of
Labour cost - -Hard Soil
Labour cost - -Head loading of the pole 105
Labour cost -Loading & unloading of 9 mtr
Material cost -200105-RCC Pole-9.0M Long,145 kg WL
Labour cost -Erection of RCC/PSC poles 9
to 10 mtr long but in a pit of
Labour cost -Hard Soil
Labour cost -Head loading of the pole 105 to 185 Mtrs
Labour cost -Loading & unloading of 9 mtr RCC/PSC poles
278811-11kv Danger board
Labour cost -Fixing Danger Board
Material cost -278911- Barbed wire (10 mts.)
Labour cost -G.I Barbed wire (12
27901206-11 kV Horizontal cross arm wit
Labour cost -Fixing of V-Shape/Horizontal
cross arm including single top support Braces and Insulators
279100-11KV DP Structure
Labour cost -Same as above using RCC
poles 9 mtr to 10 mtr long
279130-EG Stirrups(MS)
Labour cost -Fixing of Earth Guard
2811101-Guy with Complete set
Labour cost -a) Fixing of GUY Sets with
break insulators making use
Labour cost -Hard Soil
281683-Spiral Earth Electrode
Labour cost -providing spiral earth
electrode type earthing along
283005-11kV Pin Insulator (Shell onl
283055-11kV Pin Insulator (G.I Pin o
283320- Silcon rubber composite insula
285508-Rabbit to Rabbit (P G Clamps)
238291.5 For Rabbit ACSR
PART-B -200105-RCC Pole-9.0M Long,145 kg WL
Labour cost -Erection of RCC/PSC poles 9
to 10 mtr long but in a pit of
Labour cost -Hard Soil
Labour cost -Head loading of the pole 105
Labour cost -Loading & unloading of 9 mtr
279111-25/63kVA T.C.Sets(for star ra
Labour cost -for 25/63 Kva on the
279800-fish plate MS
281008-8 SWG G.I.Wire
281110-7/10 SWG Guy Wire
2811101-Guy with Complete set
Labour cost -a) Fixing of GUY Sets with break insulators making use
Labour cost -Hard Soil
2811103-Earthing Materials Type for gr
Labour cost -Hard Soil
283005-11kV Pin Insulator (Shell onl
284503-LT Spacer for TC Wiring
284828-Pre Insulated lugs -CPTAU for 5
288634-50Sq mm (AI end terminal Lug
280020-PVCWire 50Gq mg
300107-CT Cutout 63 A
302122-11kV Class, Solid core
Labour cost -Fixing of LT Protection Kit
Labour cost -HG Fuse 11kv solid core type 3 nos
303200-L.A. 9kV, 5kA, Metal Oxide
Labour cost -a) 3256.8 Fixing of 3 Nos
304212-11kv F.O S 200A Single break
Labour cost - Fixing of GOS
3214511-25kvA BEE 5 Star Rated
357511-L. T Electronic Tri-Vector Met
Labour cost -L T Electroic Tri-Vector
358061-with CT ratio 100/5 for 50/63
Labour cost - L T Metering Box for
821942- Fencing for DTO of 1Nos inclu
200003-PCC Poie-8 OM Long 140 Kg
Labour cost -Hard Soil
Labour cost -hard soil same as above but
200103-RCC Pole-5 OM Long 115 kg
Labour cost -Hard Soil
Labour cost Same as above but
27901203-4 pin cross arm with popl
Labour cost fixing of 4 pin cross
2811101 Ouy with complete set
Labour cost of Guy sets
281583-spiral earth Electrode
Labour cost Providing spiral earth
283003-1 1kv pin insulator (Shell on
283053-1 1kv pn insulator (G.I Pin
283158- No 8 Strain insulator
284108-Rabbit ACSR conductor
284108-Rabbit ACSR
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Eproc Notification Gescom Tender.xls
Tender Document • 0.04 MB
kw-1.docx
Instructions to Tenderers • 0.21 MB
World Bank guidelines.PDF
Tender Submission Guidelines • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .