Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance | -33.71% | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 Cr+₹13.4 L (8.96%)Admitted-Finance | -27.77% | ₹1.6 Cr+₹13.4 L (8.96%) | L2 | Admitted-Finance |
| 3 | L3₹1.6 Cr+₹14.4 L (9.62%)Admitted-Finance | -27.33% | ₹1.6 Cr+₹14.4 L (9.62%) | L3 | Admitted-Finance |
| 4 | L4₹1.7 Cr+₹23.4 L (15.7%)Admitted-Finance | -23.33% | ₹1.7 Cr+₹23.4 L (15.7%) | L4 | Admitted-Finance |
| 5 | L5₹1.7 Cr+₹25.2 L (16.8%)Admitted-Finance | -22.55% | ₹1.7 Cr+₹25.2 L (16.8%) | L5 | Admitted-Finance |
Tender Value
₹2.7 Cr
EMD Value
₹5.3 L
Closing Date
10 Feb 2026, 2:00 pmClosed
Ex. Engineer R and B Division Shopian
Shopian
Construction of BMO Office along with drug store at Shopian.
2026_PWDJK_300601_1
71/8106-15/RnB/SPN/e-tender of 14-01-2026
Open Tender
Civil Works
Percentage
730 days
Shopian
Please refer Tender documents.
16 documents required · 16 mandatory
₹5,500
Ex. Engineer R and B Division Shopian
₹5.3 L
Superintending Engineer PWD (RnB) Circle Pulwama
6 Mar 2026
14 Jan 2026
11 Feb 2026
15 Jan 2026
10 Feb 2026
15 Jan 2026
16 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. Ordinary Rock | 0.2 | Cum | 0.6 | ₹0.12 |
| 2 | Providing and laying stone soling duly hand packed in maintaning level and section including all carriages complete | 1 | Cum | 0.8 | ₹0.8 |
| 3 | Providing and laying in position cement concrete 1:4:8 (1
Cement:4 Corase sand: 8 grade stone aggregate 40 mm
nominal size crushed including curing but excluding the
cost of centring and shuttering. All work upto plinth level including all carriages complete | - | Cum | 0.4 | - |
| 4 | Providing and laying in position of reinforced cement concrete 1:1.5:3 (1 Cement, 1.5 Corase sand: 3 grade stone aggregate 20mm nominal size crushed including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All work upto plinth level including all carriages complete | 0.8 | Cum | 0.4 | ₹0.32 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including all carriages: including all carriages complete | 1 | Cum | 0.8 | ₹0.8 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°,landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering,finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including all carriages complete | - | Cum | 0.4 | - |
| 7 | Reinforcement for R.C.C. work including straightening,
cutting, bending, placing in position and binding all
complete Thermo-Mechanically Treated bars of grade Fe 500D or more. Inculding all carriages complete | - | Kgs | 0.6 | - |
| 8 | Centering and shuttering including strutting, propping etc
and removal of form work for foundations, footings, bases of columns etc | 0.4 | Sqm | 0.2 | ₹0.08 |
| 9 | Centering and shuttering including strutting, propping etc
and removal of the same for lintels, girders, bressumers, cantilevers, beams etc complete. | 0.2 | Sqm | 0.4 | ₹0.08 |
| 10 | Centering and shuttering including strutting, propping etc
and removal of the same for Suspended floors, roofs, landings, balconies and access platforms. | - | Sqm | 0.4 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.38 MB
Tendernotice_2.pdf
PDF • 1.04 MB
BOQ_975162.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .