| 1 | L1₹9.9 LAccepted-Finance | ₹9.9 L | L1 | Accepted-Finance OK |
| 2 | L2₹10.0 L+₹4,752.12 (0.48%)Accepted-Finance NEAR TELEPHONE EXCHANGE AURAIYA TILAK NAGAR AURAIYA TILAK NAGAR AURAIYA AURAIYA UTTAR PRADESH 206122 INDIA | AURAIYA | UTTAR PRADESH | 206122 | ₹10.0 L+₹4,752.12 (0.48%) | L2 | Accepted-Finance OK |
| 3 | L3₹10.0 L+₹7,489.25 (0.75%)Accepted-Finance | ₹10.0 L+₹7,489.25 (0.75%) | L3 | Accepted-Finance OK |
| Sl No | Description | Qty | Unit | AMBA ENTERPRISES L1 | M/S GOOD LUCK TRADERS and CO. L2 | SAMADHIYA ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 2.00Carriage of the following material from Store Center Anepur to site of work Under EDD-Auraiya through the Kacha and Pakka road. including the cost of material loading/unloading, arrangement of labour, T&P, carrier etc. required for proper completion of work. | ||||||
| 3.00 | ST Pole 11 Mtr / PCC Pole 8.5 Mtr | 180 | Nos. | 479.08 ₹73,080 Lowest | 489.7 ₹74,700 | 486.16 ₹74,160 |
| 4.00 | Line Materials material i.e. conductor, G.I. wire TPMO, stay rod, disc insulator, cross arm, Angle channel and other required. | 60 | Qtl | 359.31 ₹18,270 Lowest | 366.98 ₹18,660 | 364.62 ₹18,540 |
| 5.00 | Replacement of damaged PCC /STP pole by opening of all existing accessories from damaged pole properly and removal of damaged pole and erect the new pole at same place including fixing of all existing accessories on the new pole etc. as per direction of Executive engineer. It including the cost of all labour, T&P etc. required for proper completion of work. | 140 | Nos. | 2,893.36 ₹3,43,280 | 2,832 ₹3,36,000 Lowest | 2,914.6 ₹3,45,800 |
| 6.00 | Replacement of PCC/STP Duoble Pole by opening of all existing Accessories, T/F from damaged Double pole properly and removal of damaged poles and Erection of New Double Pole at same place including fixing of all existing accessories on the New Double Pole etc. as per direction of Executive engineer. It including the cost of all labour, T&P etc. required for proper completion of work. | 40 | Nos. | 4,192.54 ₹1,42,120 Lowest | 4,277.5 ₹1,45,000 | 4,212.6 ₹1,42,800 |
| 7.00 | Removal of existing ACSR Weasel/Dog/Raccon conductor from damaged line/Pole including opening of jumpers etc as per requirement of site and as per direction of Executive Engineer. | 20 | Km. | 2,395.4 ₹40,600 | 2,443.78 ₹41,420 | 2,336.4 ₹39,600 Lowest |
| 8.00 | Removal of Arial Bunch Conductor existing conductor from damaged line/Pole including opening of jumpers etc as per requirement of site and as per direction of Executive Engineer. | 2 | Km. | 1,197.7 ₹2,030 Lowest | 1,222.48 ₹2,072 | 1,203.6 ₹2,040 |
| 9.00 | Installation and grouting of 11 KV stay set with nuzzling etc. as per RESPO norms. | 60 | Nos. | 359.31 ₹18,270 Lowest | 366.98 ₹18,660 | 363.44 ₹18,480 |
| 10.00 | Earthing of poles by fixing earthing rods and binding with earth wire as per RESPO norms. | 180 | Nos. | 239.54 ₹36,540 Lowest | 245.44 ₹37,440 | 241.9 ₹36,900 |
| 11.00 | Dismantling & Re-installation of consumer’s LT cable service connection from existing line feeding consumer supply. | 110 | Nos. | 179.66 ₹16,747.5 Lowest | 184.08 ₹17,160 | 181.72 ₹16,940 |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
3 Nov 2025, 12:00 pmClosed
SE EDC AURAIYA
OFFICE OF THE SE EDC AURAIYA
M AND R WORK
2025_DVVNL_1082483_1
25/EDC(A)/2025-26
Open Tender
Electrical Works
Item Rate
EDD DIBIYAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
DVVNL
₹10,000
6 Jan 2026
14 Oct 2025
3 Nov 2025
14 Oct 2025
3 Nov 2025
14 Oct 2025
Carriage of the following material from Store Center Anepur to site of work Under EDD-Auraiya through the Kacha and Pakka road. including the cost of material loading/unloading, arrangement of labour, T&P, carrier etc. required for proper completion of work.
ST Pole 11 Mtr / PCC Pole 8.5 Mtr
Line Materials material i.e. conductor, G.I. wire TPMO, stay rod, disc insulator, cross arm, Angle channel and other required.
Replacement of damaged PCC /STP pole by opening of all existing accessories from damaged pole properly and removal of damaged pole and erect the new pole at same place including fixing of all existing accessories on the new pole etc. as per direction of Executive engineer. It including the cost of all labour, T&P etc. required for proper completion of work.
Replacement of PCC/STP Duoble Pole by opening of all existing Accessories, T/F from damaged Double pole properly and removal of damaged poles and Erection of New Double Pole at same place including fixing of all existing accessories on the New Double Pole etc. as per direction of Executive engineer. It including the cost of all labour, T&P etc. required for proper completion of work.
Removal of existing ACSR Weasel/Dog/Raccon conductor from damaged line/Pole including opening of jumpers etc as per requirement of site and as per direction of Executive Engineer.
Removal of Arial Bunch Conductor existing conductor from damaged line/Pole including opening of jumpers etc as per requirement of site and as per direction of Executive Engineer.
Installation and grouting of 11 KV stay set with nuzzling etc. as per RESPO norms.
Earthing of poles by fixing earthing rods and binding with earth wire as per RESPO norms.
Dismantling & Re-installation of consumer’s LT cable service connection from existing line feeding consumer supply.
Laying of ACSR Weasel/Raccon conductor in 11 KV/HT/LT lines including it's sagging, stringing, jumpering and binding as per RESPO manual or as per direction of Executive engineer.
Dismantling of old line/conductor due to errected new line/conductor from the various area in the respective J.E.’s (Store) as per direction of supervising engineer.
Re-sagging, binding & jumpering of loose 11 KV./HT/LT line as per direction of Executive engineer.
Re-nuzzling of old stay set by opening old binding for better straightening of pole and re-sag the existing conductor of H.T/L.T line properly as per direction of supervising engineer.
Straightening of Tilted pole at various places by straightening of pole including the cost of labour ,T&P charges required for proper completion of work.
Chopping of Tree branches to Clear the line route to give horizontal and vertical clearance to the line including cost of labour T&P etc.
Repairing/ resagging/ new guarding of HT/LT Line with GI wire as per RESPO Norms.
Replacement of following broken/damaged/missing accessories by new accessories including opening of the same and refixing.
LT line jumper
11 Kv pin insulator
11 Kv disc insulator
11 Kv X-arm clamp, F clamp, Dp clamp, LT pin clamp etc.
Cross arms holding clamps
Stays Clamp
Back Carriage of old/damage materials from from Pit Site to J.E Store Anepur .Including the cost of arrangement of labour, T&P, carrier etc.
M/S GOOD LUCK TRADERS and CO. (BID ID -5648397)
SAMADHIYA ENTERPRISES (BID ID -5648159)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
25.pdf
Tender Documents • 0.66 MB
BOQ_1982337.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .