Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.3 LAccepted-AOC NO 315 RAJAVEETHI ARANJI VILLAGE SOMASIPADI POST KILPENNATHUR TALUK TIRUVANNAMALAI DISTRICT 606 611 | TIRUVANNAMALAI | TIRUVANNAMALAI | TAMIL NADU | 606611 | ₹21.3 L | L1 | Accepted-AOC LER |
| 2 | L2₹21.4 LRejected-Finance | ₹21.4 L | L2 | Rejected-Finance AER |
| Sl No | Description | Qty | Unit | Ayyan Construction L2 | BARATHI INFRA L1 |
|---|---|---|---|---|---|
| 1.00Part I : Mallavadi - Eggusamuthiram road 0/0-1/357 km (R - 115) | |||||
| 1.01 | Clearing the Scrub jungle including cutting the scrubs and removing away from site etc., | 1,846.08 | Sqm | 6.3 ₹11,630.30 | 6.25 ₹11,538 |
| 1.02 | Collection and supply of carted earth from approved quarry an average lead 1Km including cost and conveyance of all materials to site and labour charges etc | 488.52 | Cum | 140 ₹68,392.80 | 140 ₹68,392.80 |
| 1.03 | Collection and supply of Girty gravel for side berms and labour charges for filling etc complete | 149.4 | Cum | 620 ₹92,628 | 619.1 ₹92,493.54 |
| 1.04 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 24 | Cum | 2,525.5 ₹60,612 | 2,523.5 ₹60,564 |
| 1.05 | Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per 7 special condition appended including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., completes as per clause 503 of MOST specification | 192 | Sqm | 87.2 ₹16,742.40 | 87.17 ₹16,736.64 |
| 1.06 | Applying tack coat over Un Primed WMB/ WMM surface at 2.5Kg of RS1 per 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat in | 192 | Sqm | 20.45 ₹3,926.40 | 20.46 ₹3,928.32 |
| 1.07 | Applying tack coat over Un Primed WMB/ WMM surface at 3 Kg of RS1 per 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat in | 3,321 | Sqm | 34.68 ₹1.2 L | 34.7 ₹1.2 L |
| 1.08 | BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc.. including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 123.75 | Cum | 11,460 ₹14.2 L | 11,450 ₹14.2 L |
| 1.09 | Provision for Hectometer Stone | 5 | No | 574.65 ₹2,873.25 | 574.65 ₹2,873.25 |
Updated dates
Tender Value
₹21.6 L
EMD Value
₹21,700
Closing Date
24 Feb 2026, 3:00 pmClosed
The Project Director, DRDA, Tiiruvannamalai
DRDA, Tiruvannamalai
Renewal of Rural road in Thurinjapuram Block of Tiruvannamalai District Package No.TVM/2025-26/241 under Rural Road Maintenance 2025-2026
2026_RDTN_651293_1
No. A11/5764/2025 Date.05.02.2026 241
Open Tender
Civil Works - Roads
120 days
Thurinjapuram
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹21,700
13 Mar 2026
5 Feb 2026
24 Feb 2026
5 Feb 2026
24 Feb 2026
5 Feb 2026
Part I : Mallavadi - Eggusamuthiram road 0/0-1/357 km (R - 115)
Clearing the Scrub jungle including cutting the scrubs and removing away from site etc.,
Collection and supply of carted earth from approved quarry an average lead 1Km including cost and conveyance of all materials to site and labour charges etc
Collection and supply of Girty gravel for side berms and labour charges for filling etc complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per 7 special condition appended including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., completes as per clause 503 of MOST specification
Applying tack coat over Un Primed WMB/ WMM surface at 2.5Kg of RS1 per 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat in
Applying tack coat over Un Primed WMB/ WMM surface at 3 Kg of RS1 per 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat in
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc.. including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for Hectometer Stone
Provision for KM Stone
Provision for Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.08 MB
Tender_Document_241.pdf
Tender Documents • 0.57 MB
BOQ_780970.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid