Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC accepted |
| 2 | Rejected-Technical | - | - | Rejected-Technical not responsive |
Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
28 May 2025, 3:00 pmClosed
EO
Town panchayat office veerapandi
Relaying of BT Surface at ward no.7 EB Office Back Side to Pumb House Road and Thappukundu Road to Mela Street in Veerapandi Town Panchayat
2025_DTP_558298_1
13/2025
Open Tender
Civil Works
Works
180 days
Veerapandi Town Panchayat
Asper Tender notice
3 documents required · 3 mandatory
₹0
₹1.7 L
veerapandi Town panchayt
14 Jul 2025
15 May 2025
28 May 2025
15 May 2025
28 May 2025
15 May 2025
15 May 2025 - 28 May 2025
23 May 2025
Amount
Providing and laying Tack Coat over WMM Surface (treated with primer) using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying 50 mm compacted thick dense bituminous macadam using 0.24 cum of 26.5-13.20mm graded metal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plan 20-30 tonnes capacity conveying the mix by tipper trucks to paver 30 tonnes capacity conveying the mix by tipper tipper trucks to site spreading the mix in required temperature for uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc, including labour charges for loading bitumen in to bitumen tank and metal to feeder unit, labour for attending to paver site etc, including hire charges and fuel charges for 20-30t C M P with bitumen boiler, tipper trucks, paver finisher, vibratory rollers and all other tools and plants required including all other incidental charges etc, complete using C M P clause 505 of MORTH Rev-5 specifications.
Providing and laying Bituminous concrete to 40mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.26 cum of 6 mm graded metal and 0.26 cum of 2.36 mm & below metal with 45.27kgs of 60/70 bitumen & 5.30Kg of Plastic waste (Total 50.30 kg) and for premixing per 10 sqm including cost and conveyance of all CMP site heating the bitumen and agregatcs to required temperature and mixing them in required temperature in central hot mix plant 20-30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature uniform thickness of 40mm / 30mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, paver finisher, Vibratory rollers and all other tools and plant required, including all other incidental charges etc., complete using CMP clause 507 of MORTH Rev-5 specifications
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .