| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 LAccepted-Finance | L1 | Accepted-Finance Admitted | |
| 2 | L2₹9.8 L+₹10,043.57 (1.04%)Accepted-Finance | L2 | Accepted-Finance Admitted |
Tender Value
₹9.8 L
EMD Value
₹10,000
Closing Date
22 Jul 2020, 3:00 pmClosed
Project Director
DRDA Krishnagiri
Krishnagiri DT -SFC MI Tanks and Ponds 2019-20- Shoolagiri Block -1 Works- Package No TN-04-KRI-141
2020_RDTN_171110_1
Roc_No_5732_2020_R4_15_06_20
Open Tender
Civil Works - Water Works
Item Rate
180 days
krishnagiri
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹10,000
DRDA Krishnagiri
27 Jul 2020
13 Jul 2020
22 Jul 2020
13 Jul 2020
22 Jul 2020
13 Jul 2020
13 Jul 2020
Amount
1.Rejuvenation of Varadharajasamy Kovil Kuttai @ Pathakotta H/O Beerjepalli.
Clearing and grubbing Tank bund including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation except hard rock requiring blasting and conveying for formation of bund with a lead of 0-100m deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,aying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete for 10 cum.
Cut Stone Dry Packing for Aprons and revetment,including all Cost and conveyance of men and materials etc.. All complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Provision for Name board arrangements
Provision for Boundry Stone
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SPS CONSTRUCTION
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .