Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.8 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹38.8 L+₹1,545.45 (0.04%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹39.1 L+₹29,763.28 (0.77%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ANOOP TRDERS L3 | satyam veer enterprises L2 | M/s RAKESH ASSOCIATES L1 |
|---|---|---|---|---|---|---|
| 1.00 | Making of Approach way for local transportation of material at site. Making coffer Dam in U/S and D/S with extra etc | 2,851.57 | CUM | 103 ₹2,93,711.71 | 102 ₹2,90,860.14 | 101.8 ₹2,90,289.83 Lowest |
| 2.00 | Making of Diversion Channel extra for 1st lift, E/W excavation in ordinary soil in foundation of wing wall | 1,389.2 | CUM | 107 ₹1,48,644.4 | 106.95 ₹1,48,574.94 | 106.5 ₹1,47,949.8 Lowest |
| 3.00 | C.C. Work in 1:3:6 Cement Sand & Stone ballast (25-50mm) including cost of material,labour and T&P etc | 132.65 | CUM | 9,738 ₹12,91,745.7 | 9,737 ₹12,91,613.05 Lowest | 9,737 ₹12,91,613.05 Lowest |
| 4.00 | Stone masonary (RCR) work in 1:4 Cement/Sand mortar including cost of material,labour and T&P etc | 101.52 | CUM | 9,612 ₹9,75,810.24 | 9,610 ₹9,75,607.2 Lowest | 9,610 ₹9,75,607.2 Lowest |
| 5.00 | R.R. Stone masonary (25-40 kg) work in 1:4 Cement/Sand mortar including cost of material,labour and T&P etc | 73.26 | CUM | 8,330 ₹6,10,255.8 | 8,329 ₹6,10,182.54 Lowest | 8,329 ₹6,10,182.54 Lowest |
| 6.00 | Struck/Raised Pointing in 1:2 C/S mortar including cost of material,labour and T&P etc | 137.95 | SQM | 351 ₹48,420.45 | 177 ₹24,417.15 Lowest | 177 ₹24,417.15 Lowest |
| 7.00 | Plaster work in 1:3 Cement & C/Sand mortar with all charges | 44.22 | SQM | 360 ₹15,919.2 | 350 ₹15,477 Lowest | 350 ₹15,477 Lowest |
| 8.00 | C.C. Work in 1:2:4 Cement Sand & Dalla Grit (10-20mm) | 24.03 | CUM | 11,140 ₹2,67,694.2 | 11,138 ₹2,67,646.14 Lowest | 11,138 ₹2,67,646.14 Lowest |
| 9.00 | Stone ballast 40-90mm filling in filter | 9.84 | CUM | 3,533 ₹34,764.72 | 3,532 ₹34,754.88 Lowest | 3,532 ₹34,754.88 Lowest |
| 10.00 | Stone Boulder filling in Filter 25-40kg | 19.69 | CUM | 3,726 ₹73,364.94 | 3,725 ₹73,345.25 Lowest | 3,725 ₹73,345.25 Lowest |
Tender Value
₹38.9 L
EMD Value
₹3.9 L
Closing Date
19 Jun 2026, 12:00 pmClosed
SEMI Gorakhpur
SEMI Gorakhpur
Checkdam at Manorama Nala, Nevadiya, Bhadar, Amethi
2026_UPMID_1158169_1
05/2026-27
Open Tender
Civil Works - Others
Item Wise
60 days
Amethi
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
EEMI Sultanpur
₹3.9 L
2 Sept 2026
9 Jun 2026
19 Jun 2026
9 Jun 2026
19 Jun 2026
9 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Making of Approach way for local transportation of material at site. Making coffer Dam in U/S and D/S with extra etc | 2,851.57 | CUM | - | - |
| 2 | Making of Diversion Channel extra for 1st lift, E/W excavation in ordinary soil in foundation of wing wall | 1,389.2 | CUM | - | - |
| 3 | C.C. Work in 1:3:6 Cement Sand & Stone ballast (25-50mm) including cost of material,labour and T&P etc | 132.65 | CUM | - | - |
| 4 | Stone masonary (RCR) work in 1:4 Cement/Sand mortar including cost of material,labour and T&P etc | 101.52 | CUM | - | - |
| 5 | R.R. Stone masonary (25-40 kg) work in 1:4 Cement/Sand mortar including cost of material,labour and T&P etc | 73.26 | CUM | - | - |
| 6 | Struck/Raised Pointing in 1:2 C/S mortar including cost of material,labour and T&P etc | 137.95 | SQM | - | - |
| 7 | Plaster work in 1:3 Cement & C/Sand mortar with all charges | 44.22 | SQM | - | - |
| 8 | C.C. Work in 1:2:4 Cement Sand & Dalla Grit (10-20mm) | 24.03 | CUM | - | - |
| 9 | Stone ballast 40-90mm filling in filter | 9.84 | CUM | - | - |
| 10 | Stone Boulder filling in Filter 25-40kg | 19.69 | CUM | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
NITC.pdf
Tender Documents • 1.48 MB
BOQ_2170623.xls
BOQ • 0.22 MB
Corri.pdf
PDF • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .