Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38,940Accepted-AOC BHAGAT SINGH COLONY MORWA SINGRAULI M P 486889 | MORWA | SINGRAULI | MADHYA PRADESH | 486889 | L1 | Accepted-AOC AWARD OF WORK TO L1 BIDDER AND REJECT L2 AND L3 BIDDER DUE TO NOT L1 BIDDER | |
| 2 | Rejected-Technical BAJRANG COMPLEX JAYANT PO DIST SINGRAULI MP 486890 | JAYANT PO | SINGRAULI | MADHYA PRADESH | 486890 | - | Rejected-Technical NOT L1 BIDDER | |
| 3 | Rejected-Technical 0 BELCHAURA MAUNATH BHANJAN MAU MAU UTTAR PRADESH 275101 | MAU | MAU | UTTAR PRADESH | 275101 | - | Rejected-Technical NOT L1 BIDDER |
Tender Value
₹82,010
EMD Value
₹1,100
Closing Date
14 Jul 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GENERAL MANAGER EXCAVATION
NCL KHADIA PROJECT, SHAKTINAGAR, SONEBHADRA, U.P.
Re-enforcement, Repairing /rebuilding and replacement of tooth point adaptor work for 01 no. bucket assembly and its main link of BE700 hydraulic shovel of Khadia project
2022_NCL_248799_1
KHD/G.M. (Excv)/E-Tender/22-23/328
Open Tender
Excavation Department Work
Item Rate
11 days
NCL KHADIA PROJECT, SHAKTINAGAR
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,100
24 Sept 2022
2 Jul 2022
15 Jul 2022
2 Jul 2022
14 Jul 2022
4 Jul 2022
2 Jul 2022 - 7 Jul 2022
Amount
• Scope of Work/Technical Specifications etc: 1 Complete cleaning of Bucket. 2 Removal of fatigue material by gouging / cutting. 3 Rebuilding of worn out area with suitable electrodes. 4 Shaping of padding material by gas cutting. 5. Re-enforcing padding materials / wear plates as required. 6. Hard facing in the bucket where required as per OEM Specifications. 7. Replacement of old /worn out tooth point adopters and fitment of new tooth point adopters.
Labour Charges for Re-enforcement & Repairing work for 1 No. bucket and its main link of BE700 Hydraulic Shovel Note : It includes Group of 2 No.welder, 1 No. fitter and 1 No. unskilled manpower along with 1 No.Supervisor in 1 shift for 6 days for 1 No. bucket re-enforcement & repairing work.
Hiring Charges of following items for Re-enforcement & Repairing work for 01 no. bucket and its main link of BE700 Hydraulic Shovel Welding machine - 02 No. for 6 day Gas cutting sets with accessories - 1 No. for 6 day, Grinding machine with consumables - 1 No. for 6 day, Misc. Tools & Tackles for 6 day, Transportation Charge for 6 day
Labour Charges for Replacement of old / worn out tooth point adaptor and fitting (new) work of BE700 Hydraulic Shovel. Note : It includes Group of 2 No.welder and 1 No. unskilled manpower along with 1 No.Supervisor in 2 shift for 1 day for Replacement of 1 No. tooth point adaptor work.
Hiring Charges of following items for 1 No. Replacement of old / worn out tooth point adaptor and fitting (new) work of BE700 Hydraulic Shovel. Welding machine - 02 No. for 1 day Gas cutting sets with accessories - 1 No. for 1 day, Grinding machine with consumables - 2 No. for 1 day, Misc. Tools & Tackles for 1 day, Transportation Charge for 1 day
Total impact of GST for the purpose of CTC
D L Enterprises
OM CONSTRUCTION
stage.html
html • 0.04 MB
techsummary_257030.pdf
PDF • 0.10 MB
finsummary_257030.pdf
PDF • 0.10 MB
scan0371.pdf
PDF • 1.11 MB
finance_257030.pdf
PDF • 0.10 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .