Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.4 CrAccepted-AOC | ₹21.4 Cr Quoted ₹42.9 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹21.4 CrAccepted-AOC | ₹21.4 Cr Quoted ₹50.0 Cr | L2 | Accepted-AOC Matched with L1 |
| 3 | L3₹55.8 CrRejected-AOC ARA MACHINE CHOPAN SONEBHADRA U P 231205 | SONBHADRA | UTTAR PRADESH | 231205 | ₹55.8 Cr | L3 | Rejected-AOC L3 |
| 4 | L4₹66.4 CrRejected-AOC | ₹66.4 Cr | L4 | Rejected-AOC L4 |
| 5 | L5₹73.4 CrRejected-AOC | ₹73.4 Cr | L5 | Rejected-AOC L5 |
Tender Value
Refer Docs
EMD Value
₹50 L
Closing Date
10 May 2022, 10:00 amClosed
Mohammad Maniruddin DGM CnMUSSC CPG-1,Raipur
CPG-1 Western Region Head QuartersII Plot No. -87, Sector-24, Atal RAIPUR 492018
Job Contract for excavation, loading, transportation and unloading of Pond Ash excavated from V-1, V-2, V3-A, V3-B, V4-A and V4-B ash dykes ofVSTPS to low lying area located within 100 kms from ash dyke of NTPCVindhyachal.
2022_NTPC_62650_1
NTPC/USSC-CPG1/9900237408
Limited
Miscellaneous Works
365 days
Western Region Head QuartersII Plot No. -87, Secto
3 documents required · 3 mandatory
₹0
₹50 L
Yes
19 Jul 2022
18 Apr 2022
11 May 2022
18 Apr 2022
10 May 2022
18 Apr 2022
18 Apr 2022 - 7 May 2022
Amount
Excav. of pond ash & 95% / 85% compactio
Transp. of pond ash- Dyke to Low lying s
Excv. Stack. & Fill. -Soil 95%/85% Comp.
SUPP, MIX. & SPREAD OF COMPACT. BENTONIT
Constr. of Retaining wall of RR Masonry
Amount linked with safety compliances
J.P. Associates
BAGHEL INFRASTRUCTURES Pvt Ltd
VIVEK CONSTRUCTION
BKB Transport Pvt Ltd
Shanti Enggicon Pvt. Ltd.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid