Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹1.7 Cr
Closing Date
1 Dec 2023, 9:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Rural Drinking Water and Sanitation Department
EXECUTIVE ENGINEER
Multi Village Drinking Water Facilities To Shirali & other 30 Villages (244 Habitations) in Bhatkal Taluk & Balkoor and other 36 Villages (260 Habitations) in Honnavara Taluk, Uttar Kannada District
RWSSD/2023-24/WS/WORK_INDENT2569
RWSSD/2023-24/WS/WORK_INDENT2569
Open
Water supply/sewage lines
Two Tender Document System(Two Cover)
RWSSD Division Office Karwar
25 documents required · 25 mandatory
Satisfactorily completed as Prime Contractor at least one drinking water supply / lift irrigation project having capital cost of value not less than Rs. 90.50 Crores
Executed, and commissioned the following minimum quantities of works Head work: Jackwell Intake well / Intake Channel with at least 6.0 m diameter. Installation of pumping machinery (VT/CP/Submersible) of at least 328 HP capacity Water Treatment Plant of at least 7.50 MLD Capacity Pipeline work (CI/MS/DI/ PVC/HDPE/GI) of at least 153.00 km. length. OHT/ZBR/MBR/GLSR/ reservoirs having a total 1024 kL capacity
The Tenderer should have experience of satisfactorily completing operation and maintenance of one rural multi-village drinking water supply project for a period of at least two years OR operation and maintenance of one urban drinking water supply project for a period of at least two years.
The Tenderer should possess required valid electrical license and the Tenderer should have executed similar electrical works of atleast Rs. 15 Crore in any one year in last five years.
The Tenderer should have the experience in SCADA system. (Work done certificate shall be submitted issued by competent authority not below the rank of Executive Engineer or equivalent officer)
Contractor should have registered as Class 1 Contractor with PWD or PRED mandatorily
Achieved in each of the atleast two financial years a minimum annual financial turnover (in all classes of civil engineering construction works only) of Rs. 289.00 Crores. (The Consolidated Annual Financial turnover certificate for the relevant financial years certified by Statutory Auditor along with UDIN number (also the audited financial statements for each of the financial years to be submitted).
Liquid assets and/or availability of credit facilities of not less than Rs. 80.50 Crore unconditional Credit line/letter of credit/ certificates from banks for meeting the fund requirement etc.
₹7,500
₹1.7 Cr
30 Sept 2023
30 Sept 2023
2 Dec 2023
6 Oct 2023
4 Oct 2023
Multi Village Drinking Water Facilities To Shirali & other 30 Villages (244 Habitations) in Bhatkal Taluk & Balkoor and other 36 Villages (260 Habitations) in Honnavara Taluk, Uttar Kannada District
PART A Design, Build, Testing & Commissioning:- Detailed Scheme Report and Drawings: Cost of production of set of documents & drawings Total Station Survey, Soil Investigations including trial pits a...
A) Construction Documents and Drawings: Cost of production of set of construction documents & drawings 2.1 Civil, Pipeline and Building Works 2.2 Mechanical Plants 2.3 Electrical Plants 2.4 Instrument...
Operation and Maintenance Manuals: Costs for the production of operation and maintenance manuals 3.1 First issue (prior to Tests on Completion) 3.2 As built drawings & O & M Manuals
Head Works:- Construction of coffer dam: Construction of Coffer dam for Intake well, connecting pipes and Jack well, and removing coffer dam after completion of construction of head works etc., includ...
Head Works:- Construction of Jack well : Construction of Jackwell structure cum pumping station including electrical panel room, LT room, battery/ UPS room, EOT crane, SCADA control room, electrical c...
Head Works: RAW WATER PUMPING MACHINERIEs : Providing and installation of pumping machineries including all electrical works electrical panel, LT power, battery / UPS, EOT crane, valves, piping, speci...
RAW WATER RISING MAIN FROM JACKWELL TO WTP : Raw water rising main from jack well at the head works to WTP including thrust blocks, air valves, sluice valves, scour valves, pressure relief valves, val...
Head Works: Development of Layout at Head works: Construction of Appraoch road / Providing Yard lighting at Head Works location including cost of any other components required for technically completi...
WTP: CONSTRUCTION OF AERATOR: Part of water treatment plant construction of aerator including all necessary connections as per the requirement, construction of channel with parshall flume, bypass arra...
WTP: CONSTRUCTION OF FILTER HOUSE WITH ALLIED BUILDING AND RSF FILTER BEDS: Part of water treatment plant construction of filter house with all allied building like administration Building with requir...
WTP: CONSTRUCTION OF CLEAR / PURE WATER STORAGE TANK /SUMP AT WTP: Construction of Pure/ treated water storage tank and chlorine contact tank of suitable capacity as per the requirement, valve arrange...
WTP: PURE WATER PUMPING MACHINERIEs: Providing, installation and commissioning of pumping machineries including panel etc to pump treated water from pumhouse at WTP to variouse locations like MBTs/ZBT...
WTP: CONSTRUCTION OF SLUDGE TREAMENT UNITS: Construction of Sludge collection sump, Sludge thickener, Filter backwash water settling tank and recovery tank, sludge drying beds/filter press, pumping st...
WTP: LAYOUT DEVELOPMENT: Development of layout for WTP by lowering & levelling of WTP area, land development works. Construction of internal roads, pavers including drains connecting all components wi...
PURE WATER RISING MAIN : Pure water rising main from pumping station at WTP/MBT/IPSs/LSs to MBTs/BPT/ ZBTs/IPSs/LSs/wash water tank etc including thrust blocks, air valves, sluice valves, scour valves...
MBR/ ZBR: CONSTRUCTION OF MASTER BALANCING RESERVOIR / ZONAL BALANCING RESERVOIRs : Construction of Master Balancing Reservoirs / Zonal Balancing reservoirs including required piping, valve chambers o...
MBR/ ZBR: LAYOUT DEVELOPMENT: CONSTRUCTION OF INTERNAL ROADS AND DRAINS: Development of layout for MBR/ZBR and construction of approch road to MBR/ZBR layout, internal roads and drains with approach t...
PURE GRAVITY MAIN : Pure water gravity main from MBTs/ZBTs to ZBT/ IPS/Village existing and proposed village Reservoirs/ISS etc including thrust blocks, air valves, sluice valves, scour valves, pressu...
IPS: CONSTRUCTION OF CLEAR WATER STORAGE RESERVOIR / INTERMEDIATE STORAGE RESERVOIR / SUMP CUM PUMP HOUSE FOR LIFTING STATION : Construction of Claer Water Reservoirs / intermediate Storage Reservoir ...
IPS: PUMPING MACHINERIEs AT IPSs/LSs : Providing, installation and commissioning of pumping machineries including panel etc to pump treated water from pumhouse at IPSs / LSs to variouse locations like...
LAYOUT DEVELOPMENT: CONSTRUCTION OF INTERNAL ROADS AND DRAINS: Development of layout for IPS by lowering & levelling of IPS area, land development works. Construction of internal roads, pavers includi...
ELECTRICAL EXPRESS FEEDER LINE (including Transformer Centre): Express Feeder Line to power requrement at Head work and installation of electrical works including transformer, electrical substation, e...
SCADA, Telemetry, Monitoring System including measuring devices a) Providing and Installing SCADA system, Automation and Integrated Management and Control System (shall be redundant system) to operate...
PART B OPERATION & MAINTENANCE O & M COST : FIRST YEAR:- Operation and maintenance of the scheme, which includes, providing technical staff, valveman, operators, and others who are required to run t...
O & M COST : SECOND YEAR Operation and maintenance of the scheme, which includes, providing technical staff, valveman, operators, and others who are required to run the system in a complete manner and...
O & M COST : THIRD YEAR Operation and maintenance of the scheme, which includes, providing technical staff, valveman, operators, and others who are required to run the system in a complete manner and ...
O & M COST : FOURTH YEAR Operation and maintenance of the scheme, which includes, providing technical staff, valveman, operators, and others who are required to run the system in a complete manner and...
O & M COST : FIFTH YEAR Operation and maintenance of the scheme, which includes, providing technical staff, valveman, operators, and others who are required to run the system in a complete manner and ...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
final shirali-mvs-dbot-tender document (1).docx
Tender Document • 0.32 MB
shirali mvs_section 7-final.docx
Others - Technical Specification • 5.94 MB
shiralli drawing.pdf
Others - DRAWINGS • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .