Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAdmitted-Finance | ₹4.4 L | L1 | Admitted-Finance |
| 2 | L1₹4.4 LAdmitted-Finance | ₹4.4 L | L1 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Due to not full fill the term and condition of NIT |
| Sl No | Description | Qty | Unit | MULTI FIX BUILDCON L1 | M/s Vidhi Construction L1 |
|---|---|---|---|---|---|
| 1.01 | Deployment of staff for Operation, Watch and ward of Booster Pumping Station at 1040 Sector-D Mayur Vihar Phase-III, including 30 HPX2 Nos pump sets, electric panel board, control valve etc. by deployment of 01 no Semi skilled (pump operator) and unskilled (Beldar) for morning & evening shifts & also include 1 no. unskilled in night shift at BPS 1040 Sector-D.
Note: - In addition to above including cleaning of pump house (inside & outside/toilet block), breakdown report of all equipment, Power failure report and also complaint lodged to power agencies and immediate report the same to engineer in charge by providing necessary arrangement, morning and evening timely report to engineer in charge by operational staff using the mobile phone.
# EPF and ESI will be paid by the contractor to engaged workers. | 90 | Days | 3,82,590 ₹3,82,590 | 3,82,590 ₹3,82,590 |
| 1.02 | EPF 13% on Labour Part | 90 | Days | 43,266.6 ₹43,266.6 | 43,266.6 ₹43,266.6 |
| 1.03 | ESI 3.25% on Labour Part | 90 | Days | 10,816.65 ₹10,816.65 | 10,816.65 ₹10,816.65 |
Tender Value
Refer Docs
EMD Value
₹8,800
Closing Date
13 Feb 2026, 3:00 pmClosed
Executive Engineer (EM) M-1
Chitra Vihar BP Station Laxmi Nagar Delhi-110092
Deployment of staff for Operation, Watch and ward of Booster Pumping Station at 1040 EWS House Sector-D Mayur Vihar Phase-III.
2026_DJB_286471_1
NIT No-17 EE (EM) M-1/ (25-26)
Open Tender
Electrical Works
90 days
Chitra Vihar BP Station Laxmi Nagar Delhi-110092
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
A/c.50448339804
₹8,800
31 Mar 2026
7 Feb 2026
13 Feb 2026
7 Feb 2026
13 Feb 2026
7 Feb 2026
Deployment of staff for Operation, Watch and ward of Booster Pumping Station at 1040 Sector-D Mayur Vihar Phase-III, including 30 HPX2 Nos pump sets, electric panel board, control valve etc. by deployment of 01 no Semi skilled (pump operator) and unskilled (Beldar) for morning & evening shifts & also include 1 no. unskilled in night shift at BPS 1040 Sector-D. Note: - In addition to above including cleaning of pump house (inside & outside/toilet block), breakdown report of all equipment, Power failure report and also complaint lodged to power agencies and immediate report the same to engineer in charge by providing necessary arrangement, morning and evening timely report to engineer in charge by operational staff using the mobile phone. # EPF and ESI will be paid by the contractor to engaged workers.
EPF 13% on Labour Part
ESI 3.25% on Labour Part
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
BOQ_379218.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid