Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.8 LAccepted-AOC SUDHA RANI VILA GROUND FLOOR 65 NASKAR PARA ROAD KOLKATA 700041 | KOLKATA | KOLKATA | WEST BENGAL | 700041 | L1 | Accepted-AOC Being lowest | |
| 2 | L2₹50.0 L+₹2.1 L (4.28%)Rejected-Finance AT ROAD MES TINALI PO CHABUA DISTT DIBRUGARH ASSAM 84 | CHABUA | DIBRUGARH | ASSAM | 786102 | L2 | Rejected-Finance Being other than lowest | |
| 3 | L3₹50.1 L+₹2.2 L (4.50%)Rejected-Finance | L3 | Rejected-Finance Being other than lowest | |
| 4 | L4₹50.1 L+₹2.2 L (4.50%)Rejected-Finance NALIAPOOL BAZAR ROAD NEAR GABHARUPATHAR RAILWAY COLONY DIBRUGARH DIST ASSAM 786001 | DIBRUGARH | DIBRUGARH | ASSAM | 786001 | L4 | Rejected-Finance Being other than lowest | |
| 5 | L5₹50.3 L+₹2.4 L (4.98%)Rejected-Finance | L5 | Rejected-Finance Being other than lowest |
| Sl No | Description | Qty | Unit | M/S P R SINGH AND SONS L3 | KP GHOSH AND CO L5 | HIND CONSTRUCTION L4 | M/S R G Construction L2 | D N ENTERPRISE L6 | S K ENTERPRISE L7 | R K CHAKRABORTY AND CO L1 | M/S D G ENTERPRISE L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Surface excavtion in soft/ loose soil n.exc 30 cm in depth and averaging 15 cm deep and getting out complete all as specified and directed. | 576.5 | Sqm | 48 ₹27,672 | 46.7 ₹26,922.55 | 49 ₹28,248.5 | 47 ₹27,095.5 | 47 ₹27,095.5 | 50 ₹28,825 | 46 ₹26,519 | 42 ₹24,213 Lowest |
| 2.00 | Excavtion in trenches n.exc 1.5 mtr wide and n.exc 1.5 mtr in depth for foundations etc or for shafts, wells, cesspits, manhole, pier holes etc n.exc 10 Sqm on plan and n.exc 1.5 mtr in depth in soft/ loose soil and getting out complete all as specified and directed. | 57.35 | Cum | 380 ₹21,793 | 372 ₹21,334.2 | 350 ₹20,072.5 Lowest | 382 ₹21,907.7 | 352 ₹20,187.2 | 385 ₹22,079.75 | 350 ₹20,072.5 Lowest | 420 ₹24,087 |
| 3.00 | Excavating in post holes (or similar holes) each n.exc 0.5 Cum, getting out, returning, filling in and ramming earth or broken rubble mixed with earth around, in layers not exceeding 25 cm, in soft/loose soil complete all as specified and directed. | 39 | Each | 395 ₹15,405 | 347 ₹13,533 Lowest | 380 ₹14,820 | 392 ₹15,288 | 392 ₹15,288 | 390 ₹15,210 | 390 ₹15,210 | 450 ₹17,550 |
| 4.00 | Returning, filling in ,including spreading, levelling, watering and well ramming in layers n.exc 25 cm in depth complete all as specified and directed. | 32.99 | Cum | 224 ₹7,389.76 | 218 ₹7,191.82 | 225 ₹7,422.75 | 221 ₹7,290.79 | 185 ₹6,103.15 | 220 ₹7,257.8 | 180 ₹5,938.2 Lowest | 350 ₹11,546.5 |
| 5.00 | Removal of excavted soil n.exc 50 mtr and depositing where directed at a level not exceeding 1.5 mtr above the starting point complete all as specified and directed. | 23.54 | Cum | 284 ₹6,685.36 | 255 ₹6,002.7 | 287 ₹6,755.98 | 282 ₹6,638.28 | 125 ₹2,942.5 | 290 ₹6,826.6 | 120 ₹2,824.8 Lowest | 320 ₹7,532.8 |
| 6.00 | M&L for plain cement concrete 1:4:8 type D2 using 40 mm graded stone aggregate crushed stone aggregate as in foundations/ mass concrete complete all as specified and directed. | 5.04 | Cum | 7,552 ₹38,062.08 | 7,522 ₹37,910.88 | 7,554 ₹38,072.16 | 7,550 ₹38,052 | 7,500 ₹37,800 | 7,600 ₹38,304 | 7,000 ₹35,280 | 750 ₹3,780 Lowest |
| 7.00 | M&L for RCC M-25 (nominal mix) as in foundations, footing, plinth beams complete all as specified and directed. | 21.37 | Cum | 13,055 ₹2,78,985.35 | 13,031 ₹2,78,472.47 | 13,060 ₹2,79,092.2 | 13,050 ₹2,78,878.5 | 13,500 ₹2,88,495 | 13,050 ₹2,78,878.5 | 12,000 ₹2,56,440 Lowest | 14,800 ₹3,16,276 |
| 8.00 | M&L for RCC M-25 (nominal mix) as in columns complete all as specified and directed. | 4.95 | Cum | 13,025 ₹64,473.75 | 13,042 ₹64,557.9 | 13,020 ₹64,449 | 13,020 ₹64,449 | 12,000 ₹59,400 | 13,050 ₹64,597.5 | 11,500 ₹56,925 Lowest | 14,500 ₹71,775 |
| 9.00 | Use and waste of formwork to sides of concrete foundations, footings, sides and soffits of foundations (if any) of foundation and plinth beams and similar work ,verticalor to batter for rough finished surfaces complete all as specified and directed. | 68.8 | Sqm | 428 ₹29,446.4 | 465 ₹31,992 | 429 ₹29,515.2 | 425 ₹29,240 | 430 ₹29,584 | 428 ₹29,446.4 | 425 ₹29,240 | 65 ₹4,472 Lowest |
| 10.00 | Use and waste of formwork to sides and soffits of floors or roof beams, beam haunching, girders, bressummers, lintels, cantilevers, shelves including supports. Overhangs etc splays between floors and beams for flat fair finished surfaces complete all as specified and directed. | 39.9 | Sqm | 573 ₹22,862.7 | 577 ₹23,022.3 | 575 ₹22,942.5 | 571 ₹22,782.9 | 455 ₹18,154.5 | 572 ₹22,822.8 | 450 ₹17,955 Lowest | 620 ₹24,738 |
Tender Value
₹47.5 L
EMD Value
₹95,000
Closing Date
20 Oct 2025, 6:00 pmClosed
Garrison Engineer AF Mohanbari
Garrison Engineer AF Mohanbari Mohanbari Post Dibrugarh Assam 786012
PROVN OF BARRACK STORES FOR FURNITURE STORAGE AND EXHAUST FANS IN BATHROOM/ TOILETS AT ALL OMQs AT AF STN MOHANBARI
2025_MES_724870_2
8001/714/E8
Open Tender
Civil Works
Item Rate
180 days
Mohanbari
Class D, category a(i)
7 documents required · 7 mandatory
₹500
Garrison Engineer (AF) Mohanbari
₹95,000
Yes
13 Nov 2025
27 Sept 2025
21 Oct 2025
27 Sept 2025
20 Oct 2025
13 Oct 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Tender.pdf
Tender Documents • 1.44 MB
BOQ_820636.xls
BOQ • 0.87 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .