| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 2₹2.3 LRejected-Finance | ₹2.3 L | 2 | Rejected-Finance single tender |
| 2 | Rejected-Technical | - | - | Rejected-Technical Technicaly not Qualified |
Tender Value
₹2.3 L
EMD Value
₹4,636
Closing Date
8 Jul 2026, 5:00 pmClosed
Add. Municipal Commissioner
New Purulia Road, Near Gandhi Maidan, Mango
Interconnection of distribution pipe line at Baccha khan road to kuli road under MANGO MUNICIPAL CORPORATION.
2026_UDD_115746_7
UDHD/MMC/07/2026-27
Open Tender
Civil Works - Water Works
Percentage
120 days
MMC Area
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
₹4,636
27 Jul 2026
3 Jul 2026
9 Jul 2026
3 Jul 2026
8 Jul 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dl Pipe : Providing and Supplying lSl mark Centrifugally cat(Spun) Ductile lron Pipes of 100 mm and above all diameterfor water works with socket & spigot ends confirming to lS BA2g I2000 in the standard working lengths of 4.5, 5.5 & 6 m suitable for classiflcation K-7 & K-9 suitable for push-on-joint (rubber gusket D jointing) wlth cement mortar lining inside the pipes with outside zinc and bittuminous coating.(i) 100mm dia DI K7 | 33 | mtrs | 1,241.9 | ₹40,982.7 |
| 2 | E/W in excavation (As per I.S. 3114/1965 For laying of different type and size of pipe so as to give one Mtr. Avarage cover over the socket of pipe with disposal of excavated earth within initial lead and as per specifaction and direction Engineer -in- Charge.1x33MX0 .50MX1.1 = 18.15 M³ of 70%=12.70 M³ | 12.7 | cum | 150.29 | ₹1,908.68 |
| 3 | E/W in excavation of cut off trenches as per design section all complete as per spection and direction of E/I. Vide item (2).=18.15M³of 30% =5.44 M³ | 5.44 | cum | 477.56 | ₹2,597.93 |
| 4 | E/W in Backfilling the the trenches after laying different type of pipe all comp. as per building spection and direction of E/I.90% of item no 2)=11.43M³ | 11.43 | cum | 93.93 | ₹1,073.62 |
| 5 | Supplying labours, tools, tackles, lubricant etc. for laying and lointing C.l.S/S $ton pipes (class l*A) in trenches supplying rubber gasket (Rubber gaskets confirming to l.S.S.- 5382- 1969) and making gasket joints including providing night guard, banier and red light to safe guard against accident, allcomplete (Pipe to be suppllied
departmenatlly free of cost and laying of pipes is to be done as per I.S.S.3114-1985) as per deslgn, speclflcaUon and direction of E/I.i)100mm DI-K-7 Pipe | 33 | mtrs | 116.19 | ₹3,834.27 |
| 6 | providing, erecting, connecting double flanged short body pattern type manually operated Sluice Valve/Scour valve having body, disc and end cover in graded cast iron to IS 210 Gr. CF 200 generally conforming in BS 5155, Synthetic rubber faced ring secured on disc by retaining ring with stainless steel screw stub shaft of stainless steel riding in teflon bearings excluding C.C.foundation/ structural steel support confirming to IS 13095-1991,(DI Specials if required will be paid seperately) including laying & jointing etc. all complete. Sluice valves - PN -1.6(i)100mm dia SV | 1 | each | 4,884.22 | ₹4,884.22 |
| 7 | Detail Estimate for construction of full way Sulice Valve Chamber/ Air valve chamber of 75A designation birick masonary chamber 1.5mx1mx1.2m deep internal dimension having 250mm thickness in cement morter 1:6 including 12 mmcement plaster 1:4 with punning with R.C.C. Cover as per direction of Engineer in charge. | 1 | each | 22,743.51 | ₹22,743.51 |
| 8 | Supplying labours, tools , tackles, for fixing sulice valve all comp. as per direction of E/I. i)100mm dia SV | 3 | each | 1,773.5 | ₹5,320.5 |
| 9 | Supplying tools, labours and cutting road for laying of pipes of different size and restoring the same as per specification and direction of E/I.100mm dia 1x33MX.50M=16.5M² Road Cutting 90% of 16.5 m²=14.85m² i) Pucca road Cutting of road 90% of 14.85m²= 13.36m² | 13.36 | sqm | 814.96 | ₹10,887.87 |
| 10 | ii) WBM road Cutting of road10% of14.85 m²= 1.48 m² | 1.48 | sqm | 648.59 | ₹959.91 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_156540.xls
BOQ • 0.25 MB
tncepro07.pdf
Tender Documents • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].