Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹9.5 L
EMD Value
₹19,012
Closing Date
6 Dec 2022, 4:30 pmClosed
ER GIAN SINGH
OFFICE OF THE EXECUTIVE ENGINEER REW RAMBAN MAITRA
AS PER THE NIT ATTACHED
2022_RDPR_197751_12
NIT NO 89 OF REW RAMBAN YSS,PRI,B2V3,CDPYT
Open Limited
Civil Works
Item Wise
60 days
RAMBAN
AS PER THE NIT ATTACHED
2 documents required · 2 mandatory
₹600
EXECUTIVE ENGINEER REW RAMBAN MAITRA
₹19,012
7 Dec 2022
28 Nov 2022
7 Dec 2022
28 Nov 2022
6 Dec 2022
28 Nov 2022
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: all kinds of soils.
Ordinary Rock
Providing/Laying of cement concrete of specified grade with 1:5:10 mix excluding cost of shuttering with 40mm aggregate size
Providing/Laying in position reinforced cement concrete of specified grade with 1:2:4 mix excluding cost of shuttering with 20mm aggregate size
Providing/Laying in position cement concrete of specified grade with 1:3:6 mix in retaining walls,return walls,walls (any thickness) excluding cost of shuttering with 20mm aggregate size with 30% boulders
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work i/c cutting bending binding and placeing in position all complete.
Centring and shuttering including struting and proping and removal of form work for Columns, pillars, piers, abutments, posts and struts
Centring and shuttering including struting and proping and removal of form work forEdges of slabs and breaks in floors and walls Above 20 cm wide
Provision for Citizen Information Board
Abdul Gani Malik
sajad contractors and labour suppliers
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .