Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.0 LAccepted-AOC HOUSE NO 3809 SAMRIDHI HOMES PEERMAUSHALA POST DHAKOLI MC ZIRAKPUR DISTT SAS NAGAR PIN 160104 | S A S NAGAR | PUNJAB | 160104 | L1 | Accepted-AOC L1 QUOTED | |
| 2 | L2₹29.7 L+₹3.1 L (11.9%)Rejected-AOC 19192 STREET NO 8 BIBI WALA ROAD OPPOSITE DAV COLLEGE BATHINDA PUNJAB PIN 151001 | BATHINDA | BATHINDA | PUNJAB | 151001 | L2 | Rejected-AOC L2 QUOTED | |
| 3 | L3₹33.3 L+₹6.7 L (25.3%)Rejected-AOC 368 PHASE 4 SAS NAGAR MOHALI 160059 PB | S A S NAGAR | PUNJAB | 160059 | L3 | Rejected-AOC L3 QUOTED | |
| 4 | L4₹39.7 L+₹13.2 L (49.6%)Rejected-AOC 8 SHARMA ESTATE LOHGARH ZIRAKPUR SAS NAGAR PB 140603 | S A S NAGAR | PUNJAB | 140603 | L4 | Rejected-AOC L4 QUOTED |
| Sl No | Description | Qty | Unit | M/S MANI GARG CONTRACTOR L2 | M/s Bhagwati Enterprises L1 | M AND H BUILD TECH L4 | Baba Engineers and Contractors L3 |
|---|---|---|---|---|---|---|---|
| .01Note :The unit rate quoted by the tenderer under Col No (13) of Sch `A’ (BOQ) unless specifically mentioned otherwise such as labour only/fixing only, for all items of works shall be deemed to be including cost of all materials, labour, tools and plants, testing and commissioning of work in position complete as required for entire completion of work. | |||||||
| 1.00 | Plain cement concrete, 75 mm thick (1:4:8), type D-2, using 40 mm graded mechanically crushed stone aggregates and finished the surface rough to provide adequate bond for the topping as in sub base ,foundations, filling and mass concrete in and including demolition of unreinforced cement concrete in ground floors and paving n.exc 15cm thickness (below or above ground level) and removal of rubbish outside MoD land ,complete all as specified and directed by Engineer-in-Charge. | 240 | SQUARE METRE | 350 ₹84,000 | 200 ₹48,000 | 300 ₹72,000 | 140 ₹33,600 Lowest |
| 2.00 | Plain cement concrete ,1:3:6 type C-1, using 20 mm graded mechanically crushed stone aggregates as in copings and the like including weathering, slightly rounded or chamfered angles and throating in and including demolition of unreinforced cement concrete in ground floors and paving n.exc 15cm thickness (below or above ground level) and removal of rubbish outside MoD land , complete all as specified and directed by Engineer-in-Charge. | 1.4 | CUBIC METRE | 5,000 ₹7,000 | 3,500 ₹4,900 | 4,000 ₹5,600 | 3,000 ₹4,200 Lowest |
| 3.00 | Brick work with sub-class `B' bricks, straight or curved on plan exceeding 6 M mean radius built in cement sand mortar 1:6 complete in and including demolition of brickwork or stone boulder masonary built in cement mortar including all quoins, arches, pillars etc for area where servicable bricks retrived and removal of rubbish outside MoD land ,complete all as specified and as directed by Engineer -in-Charge. | 7 | CUBIC METRE | 4,500 ₹31,500 | 3,500 ₹24,500 Lowest | 3,900 ₹27,300 | 3,500 ₹24,500 Lowest |
| 4.00 | Brick work with sub-class `B' bricks, straight or curved on plan in any radius built in half brick thick wall built in cement sand mortar 1:4 in and including demolition of brickwork or stone boulder masonary built in cement mortar including all quoins, arches, pillars etc for the area where servicable bricks retrived and removal of rubbish outside MoD land ,complete all as specified and as directed by Engineer -in-Charge. | 6 | SQUARE METRE | 600 ₹3,600 Lowest | 600 ₹3,600 Lowest | 2,000 ₹12,000 | 2,000 ₹12,000 |
| 5.00 | First quality glazed ( digital glossy finish) ceramic coloured tiles of 300x450x7 mm thick laid on vertical surfaces such as skirting, dados and risers to steps etc laid over and including 10mm thick cement plaster in CM (1:4) set and jointed in neat cement paste of honey like consistancy and pointed in white or coloured cement to match the shade of tiles in and including dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) and removal of rubbish outside MoD land ,complete all as specified and as directed by Engineer -in-Charge.
Notes :- (i) Design, pattern and colour of tiles will be as approved by GE.
(ii) Tile work to be executed in any position or in any patches or as per site requirement. | 91 | SQUARE METRE | 900 ₹81,900 | 700 ₹63,700 Lowest | 700 ₹63,700 Lowest | 900 ₹81,900 |
| 6.00 | First quality, Non skid ceramic coloured tiles, 7 to 8 mm thick (square/ rectangular) area of each tile exceeding 0.11 Sq.m but not exceeding 0.18 Sq.m, laid in floors with neat cement slurry @ 3.00 kg/Square Metre over and including 15 mm thick screed bed of cement mortar (1:6) including pointing in white or coloured cement to match the shade of tiles in and including dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) and removal of rubbish outside MoD land ,complete all as specified and as directed by Engineer -in-Charge.
Notes :- (i) Design, pattern and colour of tiles will be as approved by GE.
(ii) Tile work to be executed in any position or in any patches or as per site requirement. | 141 | SQUARE METRE | 900 ₹1,26,900 | 700 ₹98,700 | 700 ₹98,700 | 680 ₹95,880 Lowest |
| 7.00 | Mosaic tiles, 5 to 20 mm thick of area of each tile not exceeding 0.25 Sq.m, laid in floors with neat cement slurry @ 3.00 kg/Square Metre over and including 15 mm thick screed bed of cement mortar (1:4) including pointing in grey cement and pigment to match the shade of tiles in and including dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) and removal of rubbish outside MoD land ,complete all as specified and as directed by Engineer -in-Charge.
Notes :- (i) Design, pattern and colour of tiles will be as approved by GE.
(ii) Tile work to be executed in any position or in any patches or as per site requirement. | 240 | SQUARE METRE | 1,000 ₹2,40,000 Lowest | 1,600 ₹3,84,000 | 4,500 ₹10,80,000 | 3,000 ₹7,20,000 |
| 8.00 | Vitrified ceramic tiles (dark Shade) 10 mm thick (square/ractangular) coloured polished tiles, area of each tile not exceeding 0.36 sqm in floors etc. laid in floors with neat cement slurry @ 3.00 kg/Square Metre over and including 15 mm thick screed bed of cement mortar (1:6) including pointing in white or coloured cement to match the shade of tiles in and including dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) and removal of rubbish outside MoD land ,complete all as specified and as directed by Engineer -in-Charge.
Notes :- (i) Design, pattern and colour of tiles will be as approved by GE.
(ii) Tile work to be executed in any position or in any patches or as per site requirement. | 140 | SQUARE METRE | 1,100 ₹1,54,000 | 800 ₹1,12,000 Lowest | 980 ₹1,37,200 | 950 ₹1,33,000 |
| 9.00 | Vitrified ceramic tiles (dark Shade) 10mm thick (square/ractangular) coloured polished tiles, area of each tile not exceeding 0.36 sqm as in skirting, dados and risers to steps etc laid over and including 10mm thick cement plaster in CM (1:4) set and jointed in neat cement paste of honey like consistancy and pointed in white or coloured cement to match the shade of tiles in and including dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) and removing rubbish off the premises, complete all as specified and directed by the Engineer in Charge.
Notes :- (i) Design, pattern and colour of tiles will be as approved by GE.
(ii) Tile work to be executed in any position or in any patches or as per site requirement. | 8 | SQUARE METRE | 1,100 ₹8,800 | 800 ₹6,400 Lowest | 1,000 ₹8,000 | 1,200 ₹9,600 |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
2 Aug 2025, 6:00 pmClosed
GE (AF) Chandigarh
GE (AF) Chandigarh, Air Force Station Chandigarh-160003
CERTAIN REPAIR TO SERVANT QUARTERS, STAIRCASE AT BRAR ENCLAVE, MES OFFICE COMPLEXES, MES IB, CENTRAL AMENITIES AND COMPLEXES AT AF STATION CHANDIGARH.
2025_MES_718774_1
GE (AF)/CHD/T-28/2025-26
Open Tender
Civil Works
Item Rate
183 days
Chandigarh
Please refer Tender documents.
10 documents required · 10 mandatory
₹500
GE (AF) Chandigarh
₹90,000
Yes
17 Oct 2025
5 Jul 2025
9 Aug 2025
5 Jul 2025
2 Aug 2025
19 Jul 2025
5 Jul 2025 - 12 Jul 2025
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .