Tender Value
₹16.5 L
EMD Value
₹1.6 L
Closing Date
9 Jul 2026, 11:00 amDue tomorrow
Executive Engineer.
Executive Engineer Minor Irrigation Department Near Dhanipur Block GT.Road Aligarh.
CONSTRUCTION OF CHECKDAM /ANICUT VILLAGE NAGALA DHARA SAKIT ETAH
2026_UPMID_1159764_1
329-13-06/tack/CD/2026-27
Open Tender
Civil Works
90 days
CONSTRUCTION OF CHECKDAM /ANICUT VILLAGE NAGALA DH
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
Executive Engineer Minor Irrigation .
₹1.6 L
Yes
Aligarh
15 Jun 2026
15 Jun 2026
10 Jul 2026
15 Jun 2026
9 Jul 2026
15 Jun 2026
16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PLAIN CEMENT CONCRETE IN 1:3:6 CEMENT COURSE SAND AND 40mm STONE BALLAST IN FOUNDATION OF WING WALL CREST FLOORS CUT OFF WALL ETC. INCLUDING SUPPLY OF MATERIAL AND LABOUR T&P ETC.REQUIRED FOR PROPER COMPLETION OF THE WORK | 93.41 | M³ | - | - |
| 2 | RENDUM RUBBLE/ KHANDA MASONARY WITH 1:4 CEMENT COURSE SAND MORTAR UP TO BED LEVEL WITH 20X20X20 SIZE KHANDA IN WING WALLS ,CREST WALL , PROTECTION WALLS INCLUDING SUPPLY OF ALL MATERIAL ,LABOUR AND T&P REQUIRED FOR PROPER COMPLETION OF WORK | 42.1 | M³ | - | - |
| 3 | RENDUM RUBBLE/ KHANDA MASONARY IN SUPER STRUCURE WITH 1:4 CEMENT COURSE SAND MORTAR WITH 20X20X20 TO 25X25X25 SIZE KHANDA IN WING WALLS ,CREST WALL , PROTECTION WALLS INCLUDING SUPPLY OF ALL MATERIAL ,LABOUR AND T&P REQUIRED FOR PROPER COMPLETION OF WORK | 60.2 | M³ | - | - |
| 4 | CEMENT CONCRETE WORK IN 1:2:4 WITH CEMENT COURSE SAND AND 20 MM STONE BALLAST OVER SURFACE OF FLOOR WING WALL AND CREST WALL INCLUDING COST OF MATERIAL ,LABOUR AND T&P ETC. | 21.66 | M³ | - | - |
| 5 | 15 MM THICK PLASTER IN 1:3 CEMENT AND COURSE SAND MORTAR ON SURFACE OF UP STREAM SIDE CREST WALL,WING WALL,AND EXTENSION WALL INCLUDING SUPPLY OF ALL MATERIAL LABOUR AND T&P ETC. | 30.62 | M² | - | - |
| 6 | RAISED /STRUCK POINTING WITH 1:2 CEMENT AND COURSE SAND MORTAR ON SURFACE OF WING WALL CREST WALL SLOPPY WALL ETC. INCLUDING SUPPLY OF ALL MATERIAL , LABOUR AND T&P | 48.8 | M² | - | - |
| 7 | DRY STONE PITCHING /FILLING IN LAUNCHING APRON INCLUDING SUPPLY OF MATERIAL ,LABOUR AND T&P | 6.22 | M³ | - | - |
| 8 | A. EARTH WORK IN EXCAVATION IN HARD SOIL ON BANK OF NALA INCLUDING 4 LEAD | 111.14 | M³ | - | - |
| 9 | A. EARTH WORK IN EXCAVATION BELOW 1.5 DEPTH | 142.28 | M³ | - | - |
| 10 | REMOVAL OF SLUSH FROM BED OF NALA AND WING WALL | 28.11 | M³ | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.33 MB
BOQ_2173471.xls
BOQ • 0.30 MB