Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.3 LAccepted-AOC | ₹10.3 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | Sree Ragu Contracts & Consultancy Ast L1 |
|---|---|---|---|---|
| 1.00 | Collection of Field Maps and Revenue records: Towards the charges for collection of field maps, patta, chitta, land owners details, etc., pertaining to both sides of approved alignment as instructed by the Department Officers for survey numbers involved from the starting chainage to ending chainage of this project for the proposed alignment for formation of corridor. (Field work to collect details) | 5,87,300 | Sq.m | 0.13 ₹76,349 Lowest |
| 2.00 | Conversion of Individual FMB into Auto CAD File: Identification of respective lands that are corridored by the Transmission Line by Transect Walking System aiding with GPS devices along the center line of the corridor. Preparation of rough alignment sketch by denoting the Survey Numbers of the land that pass through. Based on the sketch, conversion of indivdual FMB Sketch with Ladder measurements that are corridored by the Transmission Line to be done within the Tolerance Limit in AutoCAD. Tolerance Limit shall be applied as per the Survey of India's Guidelines. | 5,87,300 | Sq.m | 0.17 ₹99,841 Lowest |
| 3.00 | Combining FMB Sketches and converting into KML File: As per prevailing practices/guidelines, width markings to be carried out on either side from mid-line for entire individual FMB Sketches that pass through the Transmission Line Corridor. Further, entire Individual FMB sketches to be combined for forming alignment Topo Drawing. Profiling of the combined FMB Sketches in the field by providing Control Points at every 2km interval using DGPS Instrument. With Reference to the Control Points, the entire Transmission Line Corridor to be compiled as KML File. | 5,87,300 | Sq.m | 0.13 ₹76,349 Lowest |
| 4.00 | Conducting Topographical Surveying: Towards the charges for conducting topographical survey along the Transmission Line to ascertain a corrider width by using Total station (Detailed field survey), including taking of all existing features in the field. The base area of all the towers to be surveyed, Total land area of all the Land owners to be surveyed with the reference of survey stones. Cost of leads, lifts, conveyance, survey tools & plants, hire charges, all labour charges, head loads etc., to be accompanied by the contractor itself. | 5,87,300 | Sq.m | 0.38 ₹2,23,174 Lowest |
| 5.00 | Sub-Division Work: Towards the charges for marking Transmission Line Corridor, Tower Base in the individual FMB sketches and combined FMB Sketches. Calculation of land areas of Tower base, Transmission Alignment along with Corridor Width and identification of land owners. Sub-division sketches to be formed based on the identified land areas. | 5,87,300 | Sq.m | 0.17 ₹99,841 Lowest |
| 6.00 | Print: Individual FMB, Combined FMB Sketch, Patta, Sub-division FMB, Topo Map - 6 Sets Colour print. | 5,87,300 | Sq.m | 0.25 ₹1,46,825 Lowest |
| 7.00 | Marking of Village Topo-map: Marking radius of 400m, 800m, 1200m, 1600m from the centre oint of location to be marked in the village Topo-map by using AutoCAD software by using guidelines of the Survey of India. | 13 | No | 2,897 ₹37,661 Lowest |
| 8.00 | Preparation of documents for fixing land value: Preparation of 6 sets of documents required for arriving land compensation including obtaining sales value from Registration Department for all survey numbers within 400m radius, 800m (R), 1200m (R) and 1600(R) for fixing the market value of lands for Survey numbers in Tower locations / Transmission Corridor and assisting the Revenue officials at the Collectrate Land Section as per the guidelines of the Revenue Department. | 13 | No | 8,900 ₹1,15,700 Lowest |
| 9.00 | SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only | 9 | Percentage | 9 ₹78,816.6 Lowest |
| 10.00 | CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only | 9 | Percentage | 9 ₹78,816.6 Lowest |
Tender Value
Refer Docs
EMD Value
₹9,500
Closing Date
17 Sept 2025, 2:00 pmClosed
SE GCC CBE
OFFICE OF THE SUPERINTENDING ENGINEER GENERAL CONSTRUCTION CIRCLE 182 Dr SUBBARAYAN STREET TATABAD COIMBATORE 641 012
Conducting Revenue survey and Preparation of LPS and related documents for assessment of Land Compensation along Transmission corridor
2025_EB_600198_1
ETS No. 31/25-26 of SE GCC Cbe
Open Tender
Civil Works
Works
coimbatore
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,500
Yes
20 Nov 2025
3 Sept 2025
17 Sept 2025
3 Sept 2025
17 Sept 2025
3 Sept 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .